Skip Navigation – Go to Main Content
Florida Department Of Transportation
Rotating image which displays various FDOT modes of travel
Your browser is currently set to not allow scripting. This site is best viewed with scripting turned on.
Several essential aspects of this site will not function with scripting disabled.

November 7, 2011 -- The Florida Department of Transportation's websites will be unavailable due to data center consolidation and relocation activities, beginning Thursday, November 10, 2011, 6:00 PM (EST). Services should resume by Monday, November 14, 2011 6:00 AM. We apologize for any inconvenience.

 Welcome to Florida’s Scenic Highways. 
Main Level Navigation



 

Office Level Navigation

Traffic Engineering and Operations Logo Image

  • FAQs–Public Interest
  • Contacts
  • Events/Training
  • Research
  • Document Library
  • Other Links
  • Mission/Vision
  • Approved Product List
  • Directions


  • Florida Department of Transportation
    State Traffic Engineering and Operations Office
    605 Suwannee Street,
    MS 36
    Tallahassee, Florida 32399-0450
    Phone (850) 410-5600

    FDOT Facilities
    Maps - FDOT Facilities (Opens in a new window)

    ITS Program — Ten-Year ITS Cost Feasible Plan-Legacy Documentation

    The purpose of this project was to develop ITS Corridor Master Plans and an ITS Plan for the Florida Intrastate Highway System (FIHS) limited-access corridors to be combined into a statewide program plan for the deployment of an integrated, interoperable ITS. Anticipated ITS needs, funding, and projects recommended for programming on a statewide basis are identified by this plan.

    The basis of the plan is the completion of the conceptual engineering, ITS architecture, and system engineering analyses for FIHS limited-access transportation corridors: ITS Program Corridors

     

    • I-95
    • I-75
    • I-10
    • Florida's Turnpike
    • I-4

     

    Ten-Year ITS Cost Feasible Plan (FY 08/09 - FINAL published April 2009)

    Ten-Year ITS Cost Feasible Plan (FY 04/05 - published May 23, 2005)

    Ten-Year ITS Cost Feasible Plan (FY 03/04 - published May 5, 2004)


    Ten-Year ITS Cost Feasible Plan (Dated October 21, 2002 / Approved October 23, 2002)


    Following are the final documents developed to define the ITS Program:

    • ITS Plan
      • Appendix A - Issue Paper: Evacuation Coordination User Service
      • Appendix B - Maintenance and Construction Operations (MCO) User Service Detailed Documentation
      • Appendix C - FDOT District Selected Market Packages for the FIHS Limited-Access Corridors
      • Appendix D - Draft Minimum Specifications for ITS Devices
      • Appendix E - Draft Minimum Specifications for Permanent Mount Dynamic Message Signs (DMS)
      • Appendix F - ITS Unit Costs
      • Appendix G - Florida Highway Patrol Regional Communications Center (RCC) Plan

    For additional information, please contact Gene Glotzbach at Gene.Glotzbach@dot.state.fl.us.

     ï»¿

    Florida Department of Transportation
    State Traffic Engineering and Operations Office
    605 Suwannee Street, MS 90
    Tallahassee, Florida 32399-0450
    Phone: (850) 410-5600
    Toll Free: 866-374-3368, Ext. 5600

     

     

    Accessibility | Acronyms | Frequently Asked Questions | Governor's Office | Privacy Policy | Statement of Agency  

    Email questions and comments to: 
    Public Information Office for General Issues
    Web Review Team for Website Issues
    Copyright © 1996- Florida Department of Transportation

    You might need Word Viewer or Adobe Reader to view file downloads

    My Florida logo image  (Opens in New Window)
    spacer image