Structures Design Office - 17th Street Causeway
Carina Piers (named after the Latin word "Carina" for the delta-shaped keel of a boat.)

Carina Pier Advantages:
- Lighter visual impression as compared to conventional bascule piers.
- Reduced Bascule Span Length because of the need to build behind existing bascule bridge foundation resulting in:
               1. Reduction of Counterweight
               2. Saving of Machinery and Electrical Equipment
- Larger Transverse Openings
- By nestling the Counterweight within the Carina Pier, Approach Span Connections are simplified.
- Unique Element
- Improved Span Proportions
Animated image of pouring of Carina Pier concrete. Phase 1 Carina Pier Pouring Sequence Artist rendering of Carina Pier with Gate house.
View Looking South at Carina Pier #6 Center Leg (Phase 1) Reinforcing Cage being lowered into form located in cofferdam. View Looking South at Carina Pier #6 Center Leg (Phase 1) Reinforcing Cage being lowered into form located in cofferdam. View Looking North at Carina Pier #6 outer leg. (Phase 1) View Looking North at Carina Pier #6 outer leg. (Phase 1)
View Looking North at Carina Pier #6 outer pier leg. (Phase 1) View Looking North at Carina Pier #6 outer pier leg. (Phase 1) View Looking North at Carina Pier #6 outer leg. (Phase 1) View Looking North at Carina Pier #6 outer leg. (Phase 1)
View Looking North at Carina Pier #7 outer pier leg. (Phase 1) View Looking North at Carina Pier #7 outer pier leg. (Phase 1) Shop Assembly of the back half of the Main Box Girder to be used in the Phase 1 Bascule Leaf. Shop Assembly of the back half of the Main Box Girder to be used in the Phase 1 Bascule Leaf.
View Looking East at Carina Pier #6. View Looking East at Carina Pier #6.
View shows temporary tower that will support Progressive Cantilever.
View Looking East at Carina Pier #7 (Phase 1) View Looking East at Carina Pier #7 (Phase 1)
View Looking North from Existing Deck Level. View Looking North from Existing Deck Level. View Looking West at Carina Pier #6 (Phase 1) View Looking West at Carina Pier #6 (Phase 1)
Top Surface at Machinery Room Level.
View Looking North from existing deck at Phase 1 Carina Pier. View Looking North from existing deck at Phase 1 Carina Pier. View looking east at Phase 1 Carina Pier 6 showing segmental approach pier connection. View looking east at Phase 1 Carina Pier 6 showing segmental approach pier connection.
Phase 1 Carina Pier 6 During Bascule .span erection. Phase 1 Carina Pier 6 During Bascule .span erection. Phase 1 Carina Pier 6 bascule span erection and temporary shoring. Phase 1 Carina Pier 6 bascule span erection and temporary shoring.
View looking southeast showing temporary Dutch bascule in background & phase I new bridge in foreground. View looking southeast showing temporary Dutch bascule in background & phase I new bridge in foreground. Phase 1 bascule leaf at Carina Pier 6 with exodermic deck spanning between transverse floor beams. Phase 1 bascule leaf at Carina Pier 6 with exodermic deck spanning between transverse floor beams.
Counter weight nested in the Carina Pier. Counter weight nested in the Carina Pier. Overview of Carina Pier 6 and bascule leaf. Overview of Carina Pier 6 and bascule leaf.