State Materials Office
Gaining Access To LIMS
LIMS Access
Guidelines
Engineering Analysis Reporting
- Engineering Analysis Report (EAR) Guidelines [PDF-13.8KB]
- Engineering Analysis Report (EAR) Model [PDF-121KB]
Final Project Material Certification
Laboratory Information
Materials Acceptance
- Acceptance Process Flow Chart [PDF-36.7KB]
Quality Control
Specifications
Publications, Forms and Presentations
Publications
- Construction Bulletin
- Materials Bulletin
- Contractor's Quality Control Manual Review Checklist (CPAM 3.3) [PDF]
- Construction Project Administration Manual (CPAM)
- Instructions for Ordering Sample Transmittal Cards [PDF-25.4KB]
- Materials Manual
- Resolution Testing Costs
- Sampling, Testing and Reporting Guide for Contracts Let After July 1, 2002: CQR, LIMS
- Specifications
Forms
Presentations
- Engineering Analysis Report (EAR) Workshop
- Materials Acceptance in LIMS [PDF-1.63MB]
- Quality Control Workshop Presentation [PPT-2.27MB]
- Standardized Concrete Sample Numbering System [PDF-482KB]
Websites
Other Resources
-
Random Number Chart (2006) [XLS-39.5KB]
-
Random Number Chart (2006) - Instructions [PDF-20.8KB]
Please Note: Selecting the the following links will open another instance of the browser.
Contacts
Program Contacts
Questions
The above information is related to the contracts Let after July 01, 2002. Please note that the format for producer reporting has changed. The following designations are now used to describe producer status; A= Accepted, S=Suspended, C=In progress.
