EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State Materials Office

Meeting Information

 

August 13-14, 2009

Florida Department of Transportation, State Materials Office, 5007 NE 39th Avenue, Gainesville, FL 323609

Meeting Agenda [PDF - 17KB]

Day One -- Thursday, August 13, 2009

Please Note: Final report presentations are designated below. All remaining titles are in-progress projects.

 

Modification of LRFD Resistance Factors Based on Site Variability
9:15-9:45 AM -- [PDF - 1.05MB] -- Dr. Mike McVay

 

Group Efficiencies of Grout-Tipped Drilled Shafts and Jet-Grouted PIles
9:45-10:15 AM -- [PDF - 9.26MB] -- Drs. David Bloomquist and Mike McVay

 

Final Report: Prestressed Concrete Pile Installation Utilizing Jetting and Pressure Grouting
10:15-11:15 AM -- [PDF - 6.13MB] -- Drs. David Bloomquist and Mike McVay

 

Design Phase Identification of High Pile Rebound Soils
11:15-11:45 AM -- [PDF - 820KB] -- Drs. Paul Consentino and Ed Kalajian

 

Final Report: Influence of Cantilever Sheet Pile Deflection on Adjacent Roadways
1:00-2:00 PM -- [PDF - 1.69MB] -- Dr. Gray Mullins

 

Surface Pavement Solutions for Poor Subgrade Conditions Phase II: Performance Analysis of Test Sections and Implementation Guidelines
2:00-3:00 PM -- [PDF - 6.78MB] -- Dr. Khaled Sobhan

 

Attenuating Mass Concrete Effects in Drilled Shafts
3:00-3:30 PM -- [PDF - 15.9MB] -- Dr. Gray Mullins

 

Rapid Hydration of Mineral Slurries for Drilled Shafts
3:30-4:30 PM -- [PDF - 2.33MB] -- Dr. Gray Mullins

Day Two -- Friday, August 14, 2009

Please Note: Final report presentations are designated below. All remaining titles are in-progress projects.

 

Enhancement of FDOT's SERF Device and a Study of Erosion Rates of Rock, Sand and Clay Mixtures using FDOT's RETA and SERF Equipment
9:00-9:30 AM -- [PDF - 1.84MB] -- Dr. David Bloomquist

 

Final Report: Measured and Analyze Stress Waves Propagation in EDC Piles
9:30-10:30 AM -- [PDF - 3.44MB] -- Drs. Mike McVay and David Bloomquist

 

Geophysical Testing of Rock and Its Relationship to Physical Properties
10:30-11:00 AM -- [PDF - 3.28MB] -- Dr. Dennis Hiltunen

 

Development of a Calibration System for the Laboratory Proctor (Soil Density) Compaction Hammer
11:00 AM-12:00 PM -- [PDF - 812KB]

 

Base Course Resilient Modulus for the Mechanistic-Empirical Pavement Design Guide
12:00-12:30 PM -- [PDF - 993KB] -- Dr. Dennis Hiltunen