EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State Materials Office

Materials / Publications / Materials Bulletins

Materials Bulletins

FDOT: State Materials Office
 

Materials Bulletins are issued primarily by the Director, Office of Materials. This action is taken when immediate implementation is needed, i.e., such as to implement a mandatory legislative change, FHWA directive, judicial court ruling, Department policy, or other sensitive issue. The document has temporary authority and shall expire one year after the date of issuance unless extended or rescinded by the Director, Office of Materials.

 

No. Subject

File Size

Date

06-16 Buy America Requirements - All Producers

PDF-358KB

07-12-16

05-16 Materials Acceptance and Certification System (MAC) Full Implementation Schedule

PDF-723KB

06-22-16

04-16 Materials Acceptance and Certification System (MAC) Full Implementation Schedule

PDF-386KB

04-13-16

03-16 Cemex Brooksville South Plant (CMT08) [Revised]

PDF-677KB

03-23-16

02-16 Titan America Cement Company Plant (CMT23) [Revised]

PDF-606KB

02-19-16

01-16 Revisions to Specification Section 400 - Concrete Structures [Revised]

PDF-245KB

02-19-16

15-15 Materials Acceptance and Certification System (MAC) Company Profile and MAC Access

PDF-824KB

12-16-15

14-15 Implementation of Vacuum Drying for Determination of Roadway Core Density

PDF-364KB

01-08-16

13-15 Revisions to Specification Section 353 - Concrete Pavement Slab Replacement

PDF-291KB

10-20-15

12-15 Materials Acceptance and Certification System (MAC) Implementation and Contractor Quality Control Plans

PDF-71KB

07-16-15

11-15 Monitor Existing Structures

PDF-1.65MB

07-08-15

10-15 Materials Acceptance and Certification System (MAC) Implementation, Company Profile Training

PDF-937KB

05-26-15

09-15 St. Johns River Power Park Fly Ash - Jacksonville (FA17)

PDF-274KB

04-27-15

08-15 PG 76-22 (ARB) Supply Issues and Changing to PG 76-22 (PMA)

PDF-690KB

03-24-15

07-15 Revisions to Materials Manual Volume II Section 9.2 - Substitution of Materials - Fly Ash

PDF-746KB

03-12-15

06-15 Revisions to Specification Section 346 - Portland Cement Concrete

PDF-275KB

03-02-15

05-15 Emulsions Now Listed on Approved Products List

PDF-315KB

02-20-15

04-15 Protection of Existing Structures

PDF-1.56MB

02-06-15

02-15 Revisions to Specification Section 346 - Portland Cement Concrete

PDF-488KB

02-03-15

01-15 Separation Technologies - Big Bend, Apollo Beach Fly Ash (FA30)

PDF-731KB

01-22-15

15-14 Boral Materials-Bowen Plant, Fly Ash (FA02)

PDF-658KB

11-10-14

14-14 Reduced Sampling Frequency for Cementitious Material and Water Used at the Concrete Production Facilities

PDF-334KB

11-04-14

13-14 Program Changes to the Management of Concrete Production Facility Chloride Data

PDF-720KB

11-10-14

12-14 Approval of Concrete Curing Compounds

PDF-311KB

10-09-14

11-14 Modification to Specification Section 919 - Ground Tire Rubber for Use in Asphalt Binder

PDF-324KB

10-09-14

10-14 Specification Change for Section 200 Rock Base - Adding Pit Proctor

PDF-1.27MB

08-04-14

09-14 Pilot Study to Verify Data Storage of Chloride Concentrations in Concrete Produced by Argos USA and CEMEX Concluded

PDF-333KB

07-21-14

08-14 American Cement Company (CMT40)

PDF-757KB

07-07-14

07-14 Eye Bolts for Span Wire Assembly

PDF-395KB

05-28-14

06-14 Headwaters Orlando, Fly Ash (FA20)

PDF-714KB

05-19-14

05-14 Cemex Brooksville South Cement Plant (CMT08) [Revised]

PDF-609KB

05-08-14

04-14 Data Storage of Chloride Concentrations in Concrete Produced by Argos USA and Cemex, May 1, 2014 to July 1, 2014

PDF-414KB

04-16-14

03-14 Separation Technologies - Jacksonville, Fly Ash (FA17)

PDF-754KB

04-03-14

02-14 Titan America Cement Company Plant (CMT23)

PDF-744KB

03-24-14

01-14 Vulcan Materials

PDF-646KB

03-10-14

15-13 Specification Change for Rip-Rap, Rubble (Bank and Shore)

PDF-352KB

12-05-13

14-13 Conflict of Interest Clarification

PDF-394KB

10-24-13

10-13 Change from ARB-5 and ARB-12 to PG 76-22 (ARB) on Projects Let Prior to July 1, 2013

PDF-522KB

07-03-13

09-13 Revisions to the Construction Training Qualification Manual Requirements for Requalification of Quality Control Manager, Asphalt Mix Designer, and Concrete Lab Level 2 Qualifications [Revised]

PDF-322KB

05-21-13

06-13 End of Asphalt Load Segregation Concerns

PDF-396KB

03-26-13

12-12 Boral Plant Bowen Fly Ash (FA02)

PDF-654KB

12-17-12

11-12 Modifications to Section 916 - Bituminous Materials

PDF-562KB

12-05-12

08-12 Modifications to Section 334 Superpave Asphalt Concrete

PDF-57KB

06-04-12

 

Expired Materials Bulletins | Construction Bulletins | Construction Memorandums