Mandatory Revisions - Critical modifications implemented for the Workbook.
File size ranges from 9 kb to 279 kb.
| SPECIAL PROVISIONS |
SP0000001 |
All Jobs |
EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK.
(REV 12-9-10) (FA 1-27-11) (7-11)
Insert Information Required.
Change(s) to: 2-4. |
SP0020400 |
All Jobs, (add a phone number or e-mail address) |
PREPARATION OF PROPOSALS.
(REV 6-22-04) (FA 7-13-04) (1-05)
Change(s) to: 2-5.1. |
SP0020501AB |
A+B Bidding. (Use with proper authority).
Use with SP0030100AB, SP0030203AB,SP0081300AB and SP0080701AB |
PREPARATION OF PROPOSALS.
(REV 2-21-05) (FA 3-31-05) (1-06)
Insert Information Required.
Change(s) to: 2-5.1. |
SP0020501LR |
Lane Rental. (Use with proper authority).
Use with SP0030100LR, SP0081300LR and SP0081300LRDR |
CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 2-15-07) (7-07)
Change(s) to: 3-1. |
SP0030001 |
Use with proper authority.
Notify Contracts Office on Transmittal Memo. |
AWARD AND EXECUTION OF CONTRACT.
(REV 11-5-97) (FA 1-20-98) (7-00)
Insert Information Required
Change(s) to: 3-1. |
SP0030100AB |
A+B Bidding. (Use with proper authority).
Use with SP0020501AB, SP0030203AB,SP0080701AB and SP0081300AB |
BUDGETARY CONSTRAINTS.
(REV 9-26-06) (FA 10-6-06) (1-07)
Insert Information Required
Change(s) to: 3-1. |
SP0030100BC |
Use with proper authority.
Notify the Contracts Administration Office on the Transmittal Memo. |
AWARD AND EXECUTION OF CONTRACT.
(REV 7-20-10) (8-12-10) (1-11)
Insert Information Required
Change(s) to: 3-1, 3-2.2, 3-5.1. |
SP0030100DC |
District Let Construction Contracts less than
$250,000 and
all Maintenance Contracts, excluding Lump Sum |
AWARD AND EXECUTION OF CONTRACT.
(REV 4-11-97) (FA 5-7-97) (7-00)
Change(s) to: 3-1. |
SP0030100LR |
Lane Rental. (Use with proper authority).
Use with SP0020501LR, SP0081300LR and SP0081300LRDR |
AWARD AND EXECUTION OF CONTRACT.
(REV 8-1-00) (1-01)
Change(s) to: 3-1. |
SP0030100LS |
Lump Sum Projects |
AWARD AND EXECUTION OF CONTRACT.
(REV 7-26-01) (7-10)
Insert Information Required
Change(s) to: 3-2, 3-6, 3-7. |
SP0030200 |
When necessary to change standard “Award and Execution”
Contracts Office must approve. |
AWARD OF CONTRACTS - A+B BIDDING
(REV 8-22-96) (FA 9-3-96) (1-10)
Insert Information Required
Change(s) to: 3-2. |
SP0030203AB |
A+B Bidding. (Use with proper authority).
Use with SP0020501AB, SP0030100AB,SP0080701AB and SP0081300AB |
SCOPE OF THE WORK - INTENT OF
CONTRACT.
(REV 8-19-09) (FA 8-24-09) (1-10)
Insert Information Required.
Change(s) to: 4-1. |
SP0040100 |
All Jobs, excluding Lump Sum. Do not use with SP0040100SLPQ. |
SCOPE OF THE WORK.
(REV 8-24-10) (FA 10-8-10) (7-11)
Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4. |
SP0040100LS |
All Lump Sum Projects.
Do not use with SP0040100SLLS. |
SCOPE OF THE WORK - INTENT AND SCOPE.
(REV 8-24-10) FA 10-8-10) (7-11)
Insert Information Required.
Change(s) to: 4-14-3.1, 4-3.4, 4-3.9.4. |
SP0040100SLLS |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum.
Do not use with SP0040100LS.
|
SCOPE OF THE WORK - INTENT AND SCOPE.
(REV 9-16-09) (FA 11-9-09) (7-10)
Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4. |
SP0040100SLPQ |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity.
Do not use with SP0040100. |
|
UNFORESEEABLE WORK.
(REV 9-28-98) (1-10)
Change(s) to: 4-4. |
SP0040400 |
999-25 |
CONTROL OF THE WORK.
(REV 3-15-02) (1-10)
Change(s) to: 5-1.1, 5-2, 5-7.6. |
SP0050501LS |
Lump Sum Projects |
INSPECTION.
(REV 2-10-94) (1-10)
Insert Information Required.
Change(s) to: 5-9.1 |
SP0050901 |
Long bridge jobs (1500 feet or longer); modify to suit |
CONTROL OF MATERIALS.
(REV 8-17-09) (FA 8-24-09) (1-10)
Change(s) to: 6-1. |
SP0060100LS |
Lump Sum Projects |
REQUIREMENTS FOR FEDERAL JOBS - COMPLIANCE WITH FHWA 1273.
(REV 2-11-10) (FA 2-17-10) (7-10)
Change(s) to: 7-1.1. |
SP0070101 |
All Federal Aid Jobs |
LAWS TO BE OBSERVED.
(REV 3-31-09) (FA 6-17-09) (1-10)
Change(s) to: 7-1.1.1. |
SP0070111ES |
All American Recovery and Reinvestment Act of 2009 Jobs |
PERMITS PROCURED BY THE DEPARTMENT.
(REV 8-7-01) (FA 4-14-05) (1-10)
Change(s) to: 7-2.1. |
SP0070201A |
Jobs with permit(s) procured by DOT |
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S.,
WATERS OF THE U.S. AND WATERS OF THE STATE.
(REV 7-16-09) (FA 7-30-09) (1-10)
Change(s) to: 7-2.2. |
SP0070202 |
When DEP Generic Permit is required |
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC.
(REV 1-9-01) (1-10)
Insert Information Required.
Change(s) to: 7-7.1, 7-13.2, 7-13.3. |
SP0070701DC |
District Let Contracts less than $250,000 and all Maintenance Contracts. |
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY.
(REV 11-5-10) (FA 11-9-10) (7-11)
Change(s) to: 7-11.5. |
SP0071105 |
Projects Involving CSX Transportation. |
UTILITY WORK.
(REV 2-10-94) (1-10)
Change(s) to: 7-11.6.3. |
SP0071163A |
When there are no utility work schedules |
UTILITY SCHEDULES.
(REV 8-27-01) (FA 4-14-05) (1-10)
Change(s) to: 7-11.6.3. |
SP0071163B |
When there are utility work schedules |
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 12-21-09) (FA 12-28-09) (7-10)
Insert Information Required.
Change(s) to: 7-16. |
SP0071600 |
All Federal Aid Jobs |
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-10)
Change(s) to: Section 7-26. |
SP0072600 |
Non-Federal Aid Projects |
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 6-15-10) (9-10)
Change(s) to: Section 7. |
SP0072700 |
Non-Federal Aid Projects - Construction Projects Only |
Mandatory Revision No. 1
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 1-19-11) (2-11)
Change(s) to: Section 7. |
SP0072800 |
All Jobs |
Mandatory Revision No. 1
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (8-11)
Change(s) to: Section 7. |
SP0072800 |
All Jobs |
Mandatory Revision No. 2
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 6-17-11) (7-11)
Change(s) to: Section 7. |
SP0072900 |
All Jobs |
SUBMISSION OF WORKING SCHEDULE.
(REV 6-3-09) (FA 6-10-09) (1-10)
Change(s) to: 8-3.2. |
SP0080302A |
Use only when CPM is authorized by District Construction Engineer. Do not use with SP0080302DC. |
PROSECUTION AND PROGRESS.
(REV 2-27-01) (1-10)
Change(s) to: 8-3.2, 8-8, 8-9.1. |
SP0080302DC |
District Let Construction Contracts (including Lump Sum) less than $250,000,
and all Maintenance Contracts. Do not use with SP0080302A. |
PROSECUTION OF WORK - FLEXIBLE START TIME.
(REV 2-15-10) (FA 2-17-10) (7-10)
Insert Information Required Change(s) to: 8-3.3. |
SP0080303A |
When called for*
*Contracts Office must be notified. |
BEGINNING WORK.
(REV 7-10-95) (1-10)
Insert Information Required
Change(s) to: 8-3.3. |
SP0080303B |
When called for by the District Construction Engineer |
BEGINNING WORK.
(REV 10-22-98) (11-5-98) (1-10)
Insert Information Required.
Change(s) to: 8-3.3. |
SP0080303C |
Only when called for by the District Construction Engineer.
*Contracts Office must be notified. |
PROSECUTION OF WORK - PARTNERING.
(REV 3-4-98) (FA 5-26-98) (1-10)
Insert Information Required. Change(s) to: 8-3.3. |
SP0080306 |
999-16*
*Contracts Office must be notified |
PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-11)
Change(s) to: 8-3. |
SP0080307DRB |
999-20 Items
Contracts Office must be notified |
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-11)
Change(s) to: 8-3. |
SP0080307RDRB |
Jobs without 999-20 Items |
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-11)
Change(s) to: 8-3. |
SP0080308SDRB |
334, 337, 350, 570, 580 or 649 Items. |
PROSECUTION AND PROGRESS.
(REV 8-1-00) (1-10)
Change(s) to: 8-4.1, 8-7.3.1. |
SP0080401LS |
Lump Sum Projects |
LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (1-10)
Change(s) to: 8-4.8. |
SP0080408 |
Jobs on Limited Access Highways |
CONTAMINATED MATERIAL - MERCURY-CONTAINING DEVICES AND LAMPS.
(REV 11-6-95) (FA 12-27-95) (7-11)
Insert Information Required.
Change(s) to: 8-4.9. |
SP0080409 |
Jobs with Lighting* |
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 1-19-99) (1-10)
Insert Information Required. Change(s) to: 8-7.1. |
SP0080701A |
Use when requested by proper authority, (must be modified) |
COMPUTATION OF CONTRACT TIME.
(REV 7-24-96) (FA 9-3-96) (1-10)
Change(s) to: 8-7.1. |
SP0080701AB |
A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030100AB,SP0030203AB and SP0081300AB |
COMPUTATION OF CONTRACT TIME.
(REV 2-14-94) (1-10)
Insert Information Required. Change(s) to: 8-7.1. |
SP0080701B |
Only when called for (must be modified) |
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 2-1-99) (1-10)
Change(s) to: 8-7.1. |
SP0080701C |
Use when requested by proper authority |
DAMAGE RECOVERY.
(REV 2-4-04) (1-10)
Insert Information Required.
Change(s) to: Section 8.
|
SP0081300 |
Use when requested by proper authority (Do not use with Lane Rental) |
PROSECUTION AND PROGRESS.
(REV 7-28-97) (1-10)
Change(s) to: Section 8. |
SP0081300A |
All Jobs with Alternative Bidding. (Use with proper authority |
8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300AB |
A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030100AB, SP0030203AB and SP0080701AB |
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300ABB |
A+B Jobs with Bonus (Use with proper authority) |
8-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300B |
Bonus (Date Specific) (Use with proper authority |
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300BCD |
Bonus (Calendar Days) (Use with proper authority |
8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300ID |
Incentive - Disincentive. (Use with proper authority)
Do not use with SP0081300MID. |
8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300IDLR |
Incentive-Disincentive for Lane Rental Days. (Use with proper authority).
Do not use with SP0081300LR or SP0081300LRDR |
8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300LQS |
Liquated Savings. (Use with proper authority) |
8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300LR |
Lane Rental. (Use with proper authority) Use with SP0020501LR, SP0030100LR and SP0081300LRDR. |
8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300LRDR |
Lane Rental. (Use with proper authority) Use with SP0020501LR, SP0030100LR and SP0081300LR. |
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300MB |
Milestone Bonus (Use with proper authority). Do not use with SP0081300B or SP0081300BCD |
8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)
Insert Information Required.
Change(s) to: 8-13. |
SP0081300MID |
Milestone Incentive-Disincentive. (Use with proper authority). Do not use with SP0081300ID |
MEASUREMENT AND PAYMENT.
(REV 9-9-10) (FA 9-27-10) (7-11)
Change(s) to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11. |
SP0090103LS |
Lump Sum Projects. Do not use with SP0090103SLLS. |
MEASUREMENT AND PAYMENT.
(REV 11-18-10) (FA 1-21-11) (7-11)
Change(s) to: 9-1.3, 9-2, 9-3, 9-5.1, 9-8.1, 9-9. |
SP0090103SLLS |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. Do not use with SP0090103LS. |
MEASUREMENT AND PAYMENT.
(REV 11-18-10) (FA 1-21-11) (7-11)
Change(s) to: 9-1.3.2, 9-2, 9-3.2.3, 9-5.1, 9-8.1, 9-9. |
SP0090103SLPQ |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. |
MEASUREMENT AND PAYMENT.
(REV 10-29-08) (FA 1-16-09) (1-10)
Change(s) to: 9-5.1, 9-5.4, 9-9. |
SP0090501DC |
District Let Contracts. Excluding Lump Sum Projects. Do not use with SP0090103SLPQ. |
PARTIAL PAYMENTS - WITHHOLDING PAYMENT.
(REV 2-11-09) (FA 6-16-09) (1-10)
Change(s) to: 9-5.3. |
SP0090503ES |
All American Recovery and Reinvestment Act of 2009 Jobs |
MEASUREMENT AND PAYMENT - ACCEPTANCE AND FINAL PAYMENT DOCUMENTS.
(REV 11-18-10) (FA 1-21-11) (7-11)
Change(s) to: 9-8.1. |
SP0090801ES |
All American Recovery and Reinvestment Act of 2009 Jobs. Do not use with SP0090801ESSL. |
MEASUREMENT AND PAYMENT - ACCEPTANCE AND FINAL PAYMENT DOCUMENTS.
(REV 5-12-10) (FA 7-29-10) (1-11)
Change(s) to: 9-8.1. |
SP0090801ESSL |
All ARRA of 2009 Projects less than $2,000,000 and less than 2,000 tons of asphalt- Streamline. Do not use with SP0090801ES |
ENGINEER'S FIELD OFFICE.
(REV 2-17-10) (FA 4-26-10) (1-11)
Change(s) to: 109. |
SP1090000 |
109-71 Items |
REMOVAL OF EXISTING STRUCTURES - STRUCTURES TO BE REMOVED.
(REV 9-10-07) (FA 2-15-08) (1-10)
Insert Information Required.
Change(s) to: 110-6.1. |
SP1100601 |
Use when requested by proper authority (Must have signed agreement with Local Agency). |
REMOVAL OF EXISTING STRUCTURES.
(REV 5-13-05) (FA 8-18-05) (1-10)
Change(s) to: 110-6.6. |
SP1100606 |
Use when areas of Asbestos Abatement are identified in the Plans |
MATERIAL FOR REEF ESTABLISHMENT.
(REV 7-10-95) (FA 6-21-99) (1-10)
Change(s) to: 110-11.2, 110-12.7. |
SP1101102 |
110-84 |
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION.
(REV 1-3-94) (FA 6-21-99) (1-10)
Change(s) to: 120-1. |
SP1200100A |
Use when contaminated areas are delineated in the plans |
EXCAVATION AND EMBANKMENT - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-10)
Change(s) to: 120-10.3.1. |
SP1201003SL |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. |
EXCAVATION FOR STRUCTURES AND PIPE - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-10)
Change(s) to: 125-9.3.1. |
SP1250903SL |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. |
STABILIZED SUBBASE UNDER CONCRETE
(REV 1-3-94) (1-10)
Change(s) to: 160-3. |
SP1600300 |
Only when called for |
STABILIZING - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-10)
Change(s) to: 160-4.2.4. |
SP1600402SL |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. |
PREDESIGNED STABILIZED SUBGRADE.
(REV 3-12-07) (FA 3-14-07) (1-10)
Change(s) to: 161. |
SP1610000 |
Non-Traffic and Shoulder-Only Construction. Do Not Use on Widening Projects |
ROCK BASE - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-10)
Change(s) to: 200-7.2.2 |
SP2000702SL |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. |
GRADED AGGREGATE BASE.
(REV 8-8-07) (1-10)
Change(s) to: 204. |
SP2040000 |
Non-FA Jobs with 285 Items |
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-10)
Insert Information Required.
Change(s) to: 327-1, 327-6. |
SP3270100 |
When the plans provide a location for stockpiling milled material.Insert quantity to be retained. Use all, tons, cubic yards |
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 12-1-93) (1-10)
Change(s) to: 327-2. |
SP3270200 |
Use when requested by districts |
PORTLAND CEMENT CONCRETE - ACCEPTANCE SAMPLING AND TESTING.
(REV 6-25-10) (FA 7-8-10) (1-11)
Change(s) to: 346-9.2. |
SP3460902SL |
All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. |
INTEGRAL PILE JACKETS.
(REV 6-20-08) (FA 6-26-08) (1-10)
Change(s) to: 457. |
SP4570000 |
457 Items |
FENCING.
(REV 1-6-98) (1-10)
Change(s) to: 550-2, 550-3.5, 550-6.2. |
SP5500200 |
Type A fencing on non-NHS Projects only |
PAINTED PAVEMENT MARKINGS.
(REV 1-22-10) (FA 1-25-10) (7-10)
Change(s) to: 710-2, 710-4.3, 710-4.5. |
SP7100200 |
Maintenance Projects Only |
MOTORIST AID CALL BOX RELOCATION.
(REV 8-24-10) (1-11)
Change(s) to: 714. |
SP7140000 |
714-1-500 |
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II).
(REV 6-16-99) (FA 7-20-99) (1-10)
Change(s) to: 741. |
SP7410000 |
741-70 Items |
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT.
(REV 6-16-99) (FA 7-20-99) (1-10)
Change(s) to: 743. |
SP7430000 |
743-70 Items |
TRAFFIC MONITORING SITE SOLAR POWER UNIT.
(REV 10-22-10) (FA 11-22-10) (7-11)
Change(s) to: 744. |
SP7440000 |
744-70 Items |
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY.
(REV 6-22-10) (FA 11-22-10) (7-11)
Change(s) to: 745. |
SP7450000 |
745-70 Items |
TRAFFIC MONITORING SITE CABINET.
(REV 5-6-08) (FA 10-14-08) (1-10)
Change(s) to: 746. |
SP7460000 |
746-7A-BCD |
TRAFFIC MONITORING SITE MODEM.
(REV 5-20-99) (FA 7-20-99) (1-10)
Change(s) to: 747. |
SP7470000 |
747-70 Items |
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE
EQUIPMENT AND MATERIALS.
(REV 5-12-99) (FA 7-20-99) (1-10)
Change(s) to: 748. |
SP7480000 |
Jobs with Traffic Monitoring Sites |
TRAFFIC MARKING MATERIALS.
(REV 1-21-10) (FA 1-25-10) (7-10)
Change(s) to: 971-4. |
SP9710400 |
Maintenance Projects Only. |
| |
| Supplemental Specifications |
SS0000001 |
All Jobs |
001 DEFINITIONS AND TERMS -
DEFINITIONS
(6-8-10) (FA 7-29-10) (1-11)
Change(s) to: 1-3. |
SS0010300 |
All Jobs |
002 PREQUALIFICATION OF BIDDERS.
(12-28-10) (FA 1-4-11) (7-11)
Change(s) to: 2-1. |
SS0020100 |
All Jobs |
003 EXECUTION OF CONTRACT BOND.
(REV 8-10-09) (FA 8-13-09) (1-10)
Change(s) to: 3-5.1, 3-6, 3-7. |
SS0030600 |
All Jobs |
004 SCOPE OF WORK.
(REV 7-19-10) (FA 9-20-10) (7-11)
Change(s) to: 4-3.1, 4-3.9, 4-6 |
SS0040301 |
All Jobs |
005 CONTROL OF THE WORK.
(REV 6-16-10) (FA 7-29-10) (1-11)
Change(s) to: 5-1.4.5.6, 5-1.4.8, 5-12.2.2.. |
SS0050104 |
All Jobs |
006 CONTROL OF MATERIALS.
(REV 6-23-10) (FA 7-29-10) (1-11)
Change(s) to: 6-4, 6-5.3. |
SS0060400 |
All Jobs |
007 LEGAL REQUIREMENTS AND RESPONSIBILITY TO
THE PUBLIC.
(REV 11-24-10) (FA 1-21-11) (7-11)
Change(s) to: 7.1.4, 7-2, 7-7.5, 7-11.4, 7-11.6.1, 7-25. |
SS0070104 |
All Jobs |
008 PROSECUTION AND PROGRESS.
(REV 7-22-10) (FA 9-20-10) (7-11)
Change(s) to: 8-3.3, 8-4.9, 8-6.4, 8-7.3.2. |
SS0080303 |
All Jobs |
009 MEASUREMENT AND PAYMENT.
(REV 11-18-10) (FA 1-21-11) (7-11)
Change(s) to: 9-2, 9-8.1. |
SS0090200 |
All Jobs. |
102
MAINTENANCE OF TRAFFIC.
(REV 10-7-10) (FA 10-19-10) (7-11)
Change(s) to: 102. |
SS1020000 |
All Jobs |
104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION
AND WATER POLLUTION.
(REV 11-18-10) (FA 1-21-11) (7-11)
Change(s) to: 104-6, 104-7, 104-8, 104-9, 104-10. |
SS1040000 |
All Jobs |
105 CONTRACTOR QUALITY CONTROL.
(REV 9-17-10) (FA 1-4-11) (7-11)
Change(s) to: 105-3, 105-5, 105-6, 105-8, 104-9, 104-10. |
SS1050301 |
All Jobs |
107 LITTER REMOVAL AND MOWING.
(REV 12-17-09) (FA 1-27-10) (7-10)
Change(s) to: New Section after 105.. |
SS1070000 |
All Jobs |
110 CLEARING AND GRUBBING.
(REV 5-29-09) (FA 7-15-09) (1-10)
Change(s) to 110-6.2.1. |
SS1100602 |
All Jobs |
120 EXCAVATION AND EMBANKMENT.
(REV 7-12-10) (FA 8-16-10) (1-11)
Change(s) to: 120. |
SS1200102 |
All Jobs |
121 FLOWABLE FILL.
(REV 3-12-10) (FA 5-24-10) (1-11)
Change(s) to: 121. |
SS1210000 |
All Jobs |
125 EXCAVATION FOR STRUCTURES AND PIPE.
(REV 6-3-09) (FA 8-13-09) (1-10)
Change(s) to: 125-9.1, 125-9.1.1. |
SS1250901 |
All Jobs |
160 STABILIZING.
(REV 5-20-10) (FA 7-12-10) (1-11)
Change(s) to: 160-3.2, 160-4.3.2. |
SS1600302 |
All Jobs |
200 ROCK BASE.
(REV 10-12-10) (FA 12-10-10) (7-11)
Change(s) to: 200-7.2.1. |
SS2000702 |
All Jobs |
234 SUPERPAVE ASPHALT BASE.
(REV 6-11-10) (FA 8-16-10) (1-11)
Change(s) to: 234-1, 234-5, 234-8. |
SS2340100 |
All Jobs |
300 APPLICATION OF TACK COAT - RATE OF APPLICATION.
(REV 6-10-10) (FA 8-16-10) (1-11)
Change(s) to: 300-8.4. |
SS3000804 |
All Jobs |
320 HOT BITUMINOUS MIXTURES - PLANT, METHODS AND EQUIPMENT.
(REV 1-8-10) (FA 2-2-10) (7-10)
Change(s) to: 320-2.2, 320-5. |
SS3200202 |
All Jobs |
327 MILLING OF EXISTING ASPHALT PAVEMENT - CONSTRUCTION.
(REV 1-26-10) (FA 2-2-10) (7-10)
Change(s) to: 327.3. |
SS3270300 |
All Jobs |
330 HOT BITUMINOUS MIXTURES - GENERAL CONSTRUCTION REQUIREMENTS.
(REV 1-12-11) (FA 1-24-11) (7-11)
Change(s) to: 330. |
SS3300000 |
All Jobs |
334 SUPERPAVE ASPHALT CONCRETE.
(REV 1-10-11) (FA 1-27-11) (7-11)
Change(s) to:334-3.2.6, 334-5.1.2, 334-5.4.4.
| SS3340000 |
All Jobs |
336 ASPHALT RUBBER BINDER.
(REV 5-24-10) (FA 8-16-11) (1-11)
Change(s) to: 336. |
SS3360000 |
All Jobs |
337 ASPHALT CONCRETE FRICTION COURSES.
(REV 7-29-10) (FA 8-16-10) (1-11)
Change(s) to: 337. |
SS3370000 |
All Jobs |
338 VALUE ADDED ASPHALT PAVEMENT.
(REV 2-12-10) (FA 2-17-10) (7-10)
Change(s) to: 338-1, 338-5. |
SS3380100 |
All Jobs |
341 ASPHALT RUBBER MEMBRANE INTERLAYER.
(REV 7-29-09) (FA 8-11-09) (1-10)
Change(s) to: 341-4, 341-5. |
SS3410400 |
All Jobs |
346 PORTLAND CEMENT CONCRETE.
(REV 1-13-11) (FA 1-31-11) (7-11)
Change(s) to: 346. |
SS3460000 |
All Jobs |
347 PORTLAND CEMENT CONCRETE - CLASS NS.
(REV 11-10-10) (FA 11-22-10) (7-11)
Change(s) to: 347-2.1, 347-4.1. |
SS3470201 |
All Jobs |
350 CEMENT CONCRETE PAVEMENT.
(REV 1-12-11) (FA 1-24-11) (7-11)
Change(s) to: 350-1, 350-3.3, 350-5.4, 350-6, 350-.2,
350-9.1, 350-12.4, 350-18. |
SS3500100 |
All Jobs |
352 GRINDING CONCRETE PAVEMENT.
(REV 12-21-10) (FA 1-3-11) (7-11)
Change(s) to: 352. |
SS3520000 |
All Jobs |
353 CONCRETE PAVEMENT SLAB REPLACEMENT.
(REV 12-17-10) (FA 1-3-11) (7-11)
Change(s) to: 353.2, 353-3.1. |
SS3530200 |
All Jobs |
355 VALUE ADDED PORTLAND CEMENT CONCRETE PAVEMENT.
(REV 2-12-10) (FA 2-17-10) (7-10)
Change(s) to: 355-1, 355-4, 355-5. |
SS3550100 |
All Jobs |
370 BRIDGE APPROACH EXPANSION JOINTS.
(REV 6-21-10) (FA 7-29-10) (1-11)
Change(s) to: 370-2. |
SS3700200 |
All Jobs |
400 CONCRETE STRUCTURES.
(REV 6-14-10) (FA 7-29-10) (1-11)
Change(s) to: 400. |
SS4000100 |
All Jobs |
407 THREE-SIDED PRECAST CULVERT.
(REV 6-8-10) (FA 7-29-10) (1-11)
Change(s) to: 407. |
SS4070000 |
407-1 Items |
410 PRECAST CONCRETE BOX CULVERT.
(REV 6-8-10) (FA 7-29-10) (1-11)
Change(s) to: 410-3.1, 410-6.1. |
SS4100301 |
All Jobs |
415 REINFORCING STEEL - BAR SUPPORTS.
(REV 1-4-11) (FA 2-14-11) (7-11)
Change(s) to: 415-5.10, 415-5.13. |
SS4150510 |
All Jobs |
443 FRENCH DRAINS.
(REV 6-4-10) (FA 5-17-10) (1-11)
Change(s) to: 443-2.3, 443-5, 443-6, 443-7. |
SS4430203 |
All Jobs |
446 EDGEDRAIN (DRAINCRETE) - CONTROL OF QUALITY.
(REV 1-15-10) (FA 2-19-10) (7-10)
Change(s) to: 446-3. |
SS4460300 |
All Jobs |
450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION - CONCRETE PLACEMENT.
(REV 7-26-10) (FA 7-29-10) (1-11)
Change(s) to: 450-9.2, 450-10.3.2.3, 450-12.4. |
SS4500902 |
All Jobs |
452 PRECAST SEGMENTAL BRIDGE CONSTRUCTION.
(REV 1-19-11) (FA 2-4-11) (7-11)
Change(s) to: 452. |
SS4520000 |
All Precast Segmental Bridge Jobs |
453 EPOXY JOINTING OF PRECAST SEGMENTS.
(REV 11-18-10) (FA 11-24-10) (7-11)
Change(s) to: 453. |
SS4530000 |
All Precast Segmental Bridge Jobs |
455 STRUCTURES FOUNDATIONS.
(REV 1-13-11) (FA 2-4-11) (7-11)
Change(s) to: 455. |
SS4550510 |
All Jobs |
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS.
(REV 5-18-10) (FA 6-1-10) (1-11)
Change(s) to: 460-7.6. |
SS4600706 |
All Jobs |
462 POST-TENSIONING.
(REV 12-3-10) (FA 12-10-10) (7-11)
Change(s) to: 462. |
SS4620000 |
462 Items |
502 SHEER CONNECTORS.
(REV 2-22-10) (FA 4-15-10) (1-11)
Change(s) to: 502-1. |
SS5020100 |
All Jobs |
522 CONCRETE SIDEWALK.
(REV 7-29-10) (FA 9-20-10) (7-11)
Change(s) to: 522-7.2. |
SS5220702 |
All Jobs |
523 PATTERNED/TEXTURED PAVEMENT.
(REV 6-1-10) (FA 7-29-10) (1-11)
Change(s) to: 523-2. |
SS5230200 |
All Jobs |
524 CONCRETE DITCH AND SLOPE PAVEMENT.
(REV 8-13-09) (FA 10-6-09) (7-10)
Change(s) to: 524-2, 524-9, 524-10. |
SS5240200 |
All Jobs |
527 DETECTABLE WARNINGS ON WALKING SURFACES.
(REV 1-12-11) (FA 1-21-11) (7-11)
Change(s) to: 527. |
SS5270000 |
All Jobs |
534 CONCRETE SOUND BARRIERS.
(REV 12-22-10) (FA 1-3-11) (7-11)
Change(s) to: 534. |
SS5340000 |
All Jobs |
536 GUARDRAIL.
(REV 6-9-10) (FA 7-16-10) (1-11)
Change(s) to: 536-2.4. |
SS5360204 |
All Jobs |
544 CRASH CUSHIONS.
(REV 10-7-10) (FA 10-26-10) (7-11)
Change(s) to: 544. |
SS5440000 |
All Jobs |
546 RUMBLE STRIPS.
(REV 7-6-09) (FA 8-31-09) (1-10)
Change(s) to: 546-2. |
SS5460200 |
All Jobs |
548 RETAINING WALL SYSTEMS.
(REV 1-27-11) (FA 2-4-11) (7-11)
Change(s) to: 548. |
SS5480000 |
All Jobs |
550 FENCING.
(REV 5-14-10) (FA 7-20-10) (1-11)
Change(s) to: 550-3.1. |
SS5500301 |
All Jobs |
555 DIRECTIONAL BORE.
(REV 1-10-11) (FA 1-24-11) (7-11)
Change(s) to: 555. |
SS5550000 |
555 Items |
556 JACK AND BORE.
(REV 6-22-10) (FA 7-29-10) (1-11)
Change(s) to: 556-8. |
SS5560800 |
556 Items |
557 VIBRATORY PLOWING.
(REV 6-22-10) (FA 7-29-10) (1-11)
Change(s) to: 557-6. |
SS5570600 |
557 Items |
560 COATING STRUCTURAL STEEL.
(REV 10-4-10) (FA 11-9-10) (7-11)
Change(s) to: 560. |
SS5600000 |
All Jobs |
561 COATING EXISTING STRUCTURAL STEEL.
(REV 1-27-10) (FA 2-10-10) (7-10)
Change(s) to: New Section 561. |
SS5610000 |
561 Items |
563 ANTI-GRAFFITI COATING SYSTEM - DESCRIPTION.
(REV 4-27-09) (FA 5-27-09) (1-10)
Change(s) to: 563. |
SS5630100 |
All Jobs |
570 PERFORMANCE TURF.
(REV 10-14-09) (FA 12-28-09) (7-10)
Change(s) to: 570 |
SS5700000 |
All Jobs |
580 LANDSCAPE INSTALLATION - PLANT ESTABLISHMENT PERIOD AND CONTRACTOR'S WARRANTY.
(REV 8-9-10) (FA 10-8-10) (7-11)
Change(s) to: 380-5. |
SS5800500 |
All Jobs |
603 GENERAL REQUIREMENTS FOR THE INSTALLATION AND EVALUATION OF TRAFFIC CONTROL SIGNALS AND DEVICES.
(REV 1-20-10) (FA 1-28-10) (7-10)
Change(s) to: 603 |
SS6030000 |
All Jobs. |
608 GUARANTIES FOR TRAFFIC CONTROL SIGNALS AND DEVICES.
(REV 1-20-10) (FA 1-28-10) (7-10)
Change(s) to: 608 |
SS6080000 |
All Jobs. |
611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES.
(REV 6-22-10) (FA 7-26-10) (1-11)
Change(s) to: 611 |
SS6110000 |
All Jobs. |
630 CONDUIT - FIBER OPTIC CABLE LOCATE WIRE.
(REV 11-22-10) (FA 1-6-11) (7-11)
Change(s) to: 630-3.1.2. |
SS6300301 |
All Jobs |
634 SPAN WIRE ASSEMBLY.
(REV 11-4-10) (FA 1-3-11) (7-11)
Change(s) to: 634-2.3, 634-3.3. |
SS6340203 |
All Jobs |
635 PULL AND JUNCTION BOXES.
(REV 7-28-10) (FA 8-3-10) (1-11)
Change(s) to: 635-3. |
SS6350300 |
All Jobs |
649 GALVANIZED STEEL STRAIN POLES, MAST ARMS AND MONOTUBE ASSEMBLIES.
(REV 2-2-11) (FA 2-7-11) (7-11)
Change(s) to: 649-2. |
SS6490200 |
All Jobs |
650 VEHICULAR SIGNAL ASSEMBLIES.
(REV 2-2-11) (FA 2-7-11) (7-11)
Change(s) to: 650-2, 650-3.7 through 650-3.11, 650-4.2, 650-5. |
SS6500200 |
All Jobs |
690 REMOVAL OF EXISTING TRAFFIC CONTROL SIGNALS AND DEVICES.
(REV 6-16-10) (FA 7-26-10) (1-11)
Change(s) to: 690 |
SS6900000 |
All Jobs. |
699 INTERNALLY ILLUMINATED SIGNS.
(REV 11-15-10) (FA 1-4-11) (7-11)
Change(s) to: 699-3. |
SS6990300 |
All Jobs |
700 HIGHWAY SIGNING.
(REV 11-15-10) (FA 1-4-11) (7-11)
Change(s) to: 700. |
SS7000000 |
All Jobs |
701 AUDIBLE AND VIBRATORY PAVEMENT MARKINGS.
(REV 11-4-10) (FA 1-4-11) (7-11)
Change(s) to : 701. |
SS7010000 |
All Jobs |
702 WET WEATHER PAVEMENT MARKINGS.
(REV 11-4-10) (FA 1-4-11) (7-11)
Change(s) to:702. |
SS7020000 |
702 Items |
705 OBJECT MARKERS AND DELINEATORS.
(REV 5-17-10) (FA 7-16-10) (1-11)
Change(s) to: 705-2.1. |
SS7050201 |
All Jobs |
709 TRAFFIC STRIPES AND MARKINGS - TWO REACTIVE COMPONENTS.
(REV 11-4-10) (FA 1-4-11) (7-11)
Change(s) to: 709. |
SS7090000 |
All Jobs |
710 PAINTED PAVEMENT MARKINGS.
(REV 7-9-09) (FA 7-20-09) (1-10)
Change(s) to: 710-2, 710-4.1, 710-4.1.1, 710-4.3. |
SS7100200 |
All Jobs |
711 THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS.
(REV 11-4-10) (FA 1-6-11) (7-11)
Change(s) to: 711. |
SS7110000 |
All Jobs |
713 PERMANENT TAPE STRIPES AND MARKINGS.
(REV 12-22-10) (FA 1-4-11) (7-10)
Change(s) to: 713. |
SS7130000 |
All Jobs |
715 HIGHWAY LIGHTING SYSTEM.
(REV 12-2-10) (FA 1-4-11) (7-11)
Change(s) to: 715-1, 715-6.4, 715-16. |
SS7150100 |
All Jobs |
780 INTELLIGENT TRANSPORTATION SYSTEMS-GENERAL
REQUIREMENTS.
(REV 8-7-06) (FA 8-15-06) (1-10)
Change(s) to: 780. |
SS7800000 |
All ITS Jobs |
781 INTELLIGENT TRANSPORTATION SYSTEMS-MOTORIST
INFORMATION SYSTEMS.
(REV 12-7-10) (FA 1-24-11) (7-11)
Change(s) to: 781. |
SS7810000 |
781 Items |
782 INTELLIGENT TRANSPORTATION SYSTEMS-VIDEO
EQUIPMENT.
(REV 11-10-10) (FA 1-24-11) (7-11)
Change(s) to: 782. |
SS7820000 |
782 Items |
783 INTELLIGENT TRANSPORTATION SYSTEMS-FIBER
OPTIC CABLE AND INTERCONNECT.
(REV 1-27-11) (FA 2-4-11) (7-11)
Change(s) to: 783. |
SS7830000 |
783 Items |
784 INTELLIGENT TRANSPORTATION SYSTEMS-NETWORK
DEVICES.
(REV 11-10-10) (FA 1-24-11) (7-11)
Change(s) to: 784. |
SS7840000 |
784 Items |
785 INTELLIGENT TRANSPORTATION SYSTEMS-INFRASTRUCTURE.
(REV 1-31-11) (FA 2-24-11) (7-11)
Change(s) to: 785. |
SS7850000 |
785 Items |
786 INTELLIGENT TRANSPORTATION SYSTEMS-VEHICLE
DETECTION AND DATA COLLECTION.
(REV 4-26-10) (FA 6-22-10) (1-11)
Change(s) to: 786. |
SS7860000 |
786 Items |
901 COARSE AGGREGATE.
(REV 12-15-09) (FA 12-21-09) (7-10)
Change(s) to: 901-1.4 |
SS9010104 |
All Jobs |
916 BITUMINOUS MATERIALS.
(REV 1-13-11) (FA 1-27-11) (7-11)
Change(s) to: 916-3.2, 916-4. |
SS9160000 |
All Jobs |
919 GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER.
(REV 6-22-09) (FA 6-25-09) (1-10)
Change(s) to: 919-3. |
SS9190300 |
All Jobs |
921 PORTLAND CEMENT AND BLENDED CEMENT.
(REV 10-21-10) (FA 1-4-11) (7-11)
Change(s) to: 921-1. |
SS9210100 |
All Jobs |
923 WATER FOR CONCRETE.
(REV 5-20-10) (FA 6-9-10) (1-11)
Change(s) to: 923. |
SS9230000 |
All Jobs |
926 EPOXY COMPOUNDS.
(REV 1-4-10) (FA 1-14-10) (7-10)
Change(s) to: 926-1, 926-2.2. |
SS9260100 |
All Jobs |
929 POZZOLANS AND SLAG.
(REV 12-17-10) (FA 1-3-11) (7-11)
Change(s) to: 929-2, 929-3.2, 929-4.2, 929-6.3. |
SS9290200 |
All Jobs |
931 METAL ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES.
(REV 3-26-10) (FA 5-26-10) (1-11)
Change(s) to: 931-1.1. |
SS9310101 |
All Jobs |
932 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES.
(REV 8-2-10) (FA 8-12-10) (1-11)
Change(s) to: 932-1. |
SS9320102 |
All Jobs |
938 POST-TENSION GROUT.
(REV 5-1-09) (FA 5-19-09) (1-10)
Change(s) to: 938. |
SS9380000 |
462 Items |
948 MISCELLANEOUS TYPES OF PIPE.
(REV 5-19-10) (FA 6-9-10) (1-11)
Change(s) to: 948-1.7, 948.2.3, 948-4. |
SS9480203 |
All Jobs |
962 STRUCTURAL STEEL
AND MISCELLANEOUS METAL ITEMS (OTHER THAN ALUMINUM).
(REV 2-23-10) (FA 5-4-10) (1-11)
Change(s) to: 962-1.2, 962-8.2, 962-8.4.2. |
SS9620102 |
All Jobs |
971 TRAFFIC MARKING MATERIALS.
(REV 2-15-11) (FA 2-22-11) (7-11)
Change(s) to: 971. |
SS9710000 |
All Jobs |
972 RECYCLED PLASTIC PRODUCTS.
(REV 7-8-10) (FA 7-20-10) (1-11)
Change(s) to: 972-1, 972-3, 972-4, 972-5, 972-6. |
SS9720100 |
All Jobs |
973 STRUCTURAL PLASTICS.
(REV 5-11-09) (FA 6-10-09) (1-10)
Change(s) to: 973. |
SS9730000 |
All Jobs |
975 STRUCTURAL COATING MATERIALS.
(REV 7-20-10) (FA 11-9-10) (7-11)
Change(s) to: 975. |
SS9750000 |
All Jobs |
981 TURF MATERIALS.
(REV 7-1-10) (FA 8-16-10) (1-11)
Change(s) to: 981. |
SS9810100 |
All Jobs |
987 PREPARED SOIL LAYER MATERIALS.
(REV 1-15-10) (FA 2-17-10) (7-10)
Change(s) to: 987-1. |
SS9870100 |
All Jobs |
990 TEMPORARY TRAFFIC CONTROL DEVICE MATERIALS.
(REV 11-22-10) (FA 12-10-10) (7-11)
Change(s) to: 990. |
SS9900000 |
All Jobs |
993 OBJECT MARKERS AND DELINEATORS.
(REV 7-8-10) (FA 7-16-10) (1-11)
Change(s) to: 993-1.4, 993-2.3.1. |
SS9930104 |
All Jobs |
994 RETROREFLECTIVE AND NONREFLECTIVE SHEETING FOR TRAFFIC CONTROL DEVICES.
(REV 2-8-10) (FA 2-10-10) (7-10)
Change(s) to: 994. |
SS9940000 |
All Jobs |
|
TECHNICAL SPECIAL PROVISIONS.
The following Technical Special Provisions are individually
signed and sealed but are included as part of this
Specifications Package.
Insert # ________ |
TSPs |
Jobs with TSPs |
|
|
|