Specifications and Estimates
Implemented Modifications to the 2004 Standard Specifications
July 2005 Workbook
for Lettings Effective July 2005 - December 2005
Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Change Table - Shows all changes made to the Specifications within this workbook.
History of Revisions - To review the History of revisions for this Workbook.
Note: These files are in Adobe Acrobat (PDF) format.
File size ranges from 9 kb to 279 kb.
| SPECIAL PROVISIONS | SP0000001 | All Jobs |
|---|---|---|
| INTENT AND SCOPE. ARTICLE 4-1 (Page 19) is expanded by the following: The Improvements under this Contract consist of (Place description here).Insert # ________ The summary of pay items for this project is listed in the plans. |
SP0000041 | All Jobs, except Lump Sum |
|
INTENT AND SCOPE. ARTICLE 4-1 (Page 17) is deleted and the following substituted: Insert # _________ |
00401LSSP | All Lump Sum Projects |
|
(REV 8-22-96) (FA 9-3-96) (7-00) For this Contract, the Department will reject any bid in which the bidder submits proposed Contract time in excess of _________ calendar days. Insert # _________ |
0040091SP | A+B Bidding. (Use with proper authority). Use with 00200ABSP, 00300ABSP, 00800ASP and 00800ABSP |
|
(REV 2-8-94) (7-00) It is anticipated that construction by others will be underway at each end and within this project during the life of this Contract. Coordinate construction operations with those of other Contractors as necessary. |
0040010SP | When other Contractors are working in the vicinity |
|
EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND SITE
OF WORK. (REV 4-19-99) (1-02) ARTICLE 2-4 (of the Supplemental Specifications) is expanded by the following: Insert # __________ |
0020024SP | All Jobs, (add a phone number or e-mail address) |
|
PREPARATION OF PROPOSALS. (REV 6-22-04) (FA 7-13-04) (1-05) SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded by the following: |
00200ABSP | A+B Bidding. (Use with proper authority). Use with 00300ABSP, 040091SP, 00800ABSP and 008007ASP |
|
PREPARATION OF PROPOSALS. (REV 6-22-04) (FA 7-13-04) (1-05) SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded by the following: Insert # __________ |
00200LRSP | Lane Rental. (Use with proper authority). Use with 00300LRSP, 00800LRSP and 00801LRSP |
|
AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) ARTICLE 3-1 (Page 16). The first and second sentences are deleted and the following substituted: Insert # _________ |
00300ABSP | A+B Bidding. (Use with proper authority). Use with 00200ABSP, 0040091SP,008007ASP and 00800ABSP |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-27-00) (1-01) ARTICLE 3-1 (Pages 14 and 15). The first paragraph is expanded by the following: Insert # _________ |
00300DCSP | All District Let and Maintenance Contracts excluding Lump Sum |
|
AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) ARTICLE 3-1 (Pages 14 and 15). The first paragraph is deleted and the following substituted: |
00300LSSP | Lump Sum Projects |
|
AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) ARTICLE 3-1 (Page 14 and 15). The first and second sentences are deleted and the following substituted: |
00300LRSP | Lane Rental. (Use with proper authority). Use with 00200LRSP, 00800LRSP and 00801LRSP |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (1-02) ARTICLE 3-2 (Page 15) is expanded by the following: Insert # _________ *Contracts Office must approve |
0032000SP | When necessary to change standard “Award and Execution”* |
| AWARD AND EXECUTION OF CONTRACT. (REV 2-7-97) (7-00) SUBARTICLE 3-2.1 (Page 15) is deleted and the following substituted: |
00300003SP | Bid Average Method (Use with proper authority) |
| ALTERATION OF PLANS OR OF CHARACTER OF WORK. (REV 8-1-00) (1-01) SUBARTICLE 4-3.1 (Pages 19 and 20) is deleted and the following substituted: |
00403LSSP | Lump Sum Projects |
|
VALUE ENGINEERING INCENTIVE. (REV 8-12-96) (FA 7-2-97) (7-00) SUBARTICLE 4-3.9 (Pages 22-25) is deleted. |
00400DCSP | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
| UNFORESEEABLE WORK. (REV 9-28-98) (7-00) ARTICLE 4-4 (Page 25) is deleted and the following substituted: |
0040004SP | 999-25 2999-25 |
|
CONTROL OF THE WORK. (REV 3-15-02) (1-03) SUBARTICLE 5-1.1 (Page 26) is expanded by the following: |
00500LSSP | Lump Sum Projects |
| INSPECTION. (REV 2-10-94) (7-00) SUBARTICLE 5-9.1 (Page 38) is expanded by the following: Insert # __________ |
0050091SP | Long bridge jobs (1500 feet [450 m] or longer); modify to suit |
| CONTROL OF MATERIALS. (REV 1-9-01) (7-01) ARTICLE 6-1 (of the Supplemental Specifications) is expanded by the following new Subarticles: |
00600LSSP | Lump Sum Projects |
|
LAWS TO BE OBSERVED. (REV 5-13-04) (FA 5-20-04) (1-05) SUBARTICLE 7-1.1 (of the Supplemental Specifications) is expanded by the following: |
0070011SP | All Federal Aid Jobs |
|
ENDANGERED SPECIES. (REV 2-10-94) (7-00) SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following: |
0070010SP | When called for (woodpecker) |
|
ENDANGERED SPECIES. (REV 2-27-96) (FA 3-26-96) (1-03) SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following: |
0070014SP | When called for (Manatees and/or turtles) |
| PERMITS PROCURED BY THE DEPARTMENT. (REV 8-7-01) (7-02) SUBARTICLE 7-2.1 (Page 59) is expanded by the following: |
0070021SP | Jobs with permit(s) procured by DOT |
| PERMITS PROCURED BY THE CONTRACTOR. (REV 12-18-00) (1-01) SUBARTICLE 7-2.1 (Page 65) is expanded by the following: |
0070022SP | Jobs with buildings |
| DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S.,
WATERS OF THE U.S. AND WATERS OF THE STATE. (REV 6-9-03) (FA 6-12-03) (1-04) SUBARTICLE 7-2.2 (Page 59) is expanded by the following: |
0070002SP | When DEP Generic Permit is required |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 1-9-01) (1-04) SUBARTICLE 7-7.1 (Page 60) is expanded by the following: Insert # ________ |
00700DCSP | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
|
STRUCTURES OVER NAVIGATABLE WATERS. (REV 2-10-94) (7-00) ARTICLE 7-8 (Page 62) is expanded by the following: |
0070080SP | When work platforms are indicated in the permit for construction |
|
USE OF EXPLOSIVES. (REV 9-26-94) (7-00) ARTICLE 7-9 (Pages 68 and 69) is deleted and the following substituted: |
0070008SP | When explosives are prohibited |
|
UTILITY WORK. (REV 2-10-94) (7-02) SUBARTICLE 7-11.6.3 (Page 66) is expanded by the following: |
0071164SP | When there are no utility work schedules |
|
UTILITY SCHEDULES. (REV 8-27-01) ((7-02) SUBARTICLE 7-11.6.3 (Page 66) is expanded by the following: |
0070116SP | When there are utility work schedules |
|
WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 1-3-03) (FA 5-16-03) (1-04) ARTICLE 7-16 (of the Supplemental Specifications) is expanded by the following: Insert # ________ |
0070160SP | All Federal Aid Jobs |
|
DISADVANTAGED BUSINESS ENTERPRISE PROGRAM. (REV 6-6-02) (FA 7-17-02) (1-03) SECTION 7 (Pages 55-71) is expanded by the following: |
0070024SP | All Jobs |
|
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS. (REV 4-25-02) (FA 7-17-02) (1-03) SECTION 7 (Pages 55-71) is expanded by the following: |
0070025SP | Non-Federal Aid Projects |
|
ON-THE-JOB TRAINING. (REV 6-20-02) (1-04) SECTION 7 (Pages 55-71) is expanded by the following: |
0070026SP | All Jobs |
|
SUBLETTING CONTRACTS. (REV 2-14-94) (7-00) SUBARTICLE 8-1.1 (of he Supplemental Specifications) is expanded by the following: |
0080010SP | Pressure Epoxy Grouting pay item “Injecting and Sealing Prestressed Beams” |
|
PROSECUTION AND PROGRESS. (REV 8-1-00) (1-03) SUBARTICLE 8-1.2 (Pages 72 and 73) is deleted. |
00800LSSP | Lump Sum Projects |
|
SUBMISSION OF WORKING SCHEDULE. (REV 5-30-02) (FA 7-24-02) (1-03) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted: |
0080032SP | Use only when CPM is authorized by District Construction Engineer. Do not use with 0080039SP or 00800DCSP |
|
SUBMISSION OF WORKING SCHEDULE. (REV 5-30-02) (FA 7-24-02) (1-03) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted: |
0080039SP | Use only when CPM is authorized by District Construction Engineer. Do not use with 0080032SP or 00800DCSP |
|
PROSECUTION AND PROGRESS. (REV 2-27-01) (1-03) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted. |
00800DCSP | District Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts. Do not use with 0080032SP, 0080039SP, or 0080050SP |
|
PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 2-24-04) (FA 4-23-04) (1-05) SUBARTICLE 8-3.3 (Page 74) is deleted and the following substituted: Insert # ________ *Contracts Office must be notified |
0080083SP | When called for* |
|
BEGINNING WORK. (REV 7-10-95) (7-00) SUBARTICLE 8-3.3 (Page 74). The last sentence is deleted and the following substituted: Insert # ________ |
0080330SP | Only when called for by the District Construction Engineer |
|
BEGINNING WORK. (REV 10-22-98) (FA 11-5-98) (7-00) SUBARTICLE 8-3.3 (Page 74) is expanded by the following substituted: Insert # ________ *Contracts Office must be notified |
0080033SP | Only when called for by the District Construction Engineer |
|
PROSECUTION OF WORK – PARTNERING. (REV 3-4-98) (FA 5-26-98) (7-00) ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle: Insert # _______ *Contracts Office must be notified |
0080036SP | 999-16* 2999-16* |
|
PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 11-19-02) (FA 3-5-03) (1-04) ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle: |
0080037SP | 999-20* 2999-20* |
|
PROSECUTION OF WORK – REGIONAL DISPUTES REVIEW BOARD. (REV 4-1-02) (FA 12-12-02) (7-03) ARTICLE 8-3 (Pages 73-5) is expanded by the following new Subarticle: |
0080370SP | Jobs without 999-20;
2999-20 |
|
PROSECUTION OF WORK – STATEWIDE DISPUTES REVIEW BOARD. (REV 6-23-03) (FA 8-1-03) (1-04) ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle: |
0083700SP | Jobs with Asphalt Pavement, concrete pavement, landscape installation |
|
LIMITATIONS OF OPERATIONS. (REV 2-14-04) (7-00) SUBARTICLE 8-4.1 (Page 75) is expanded by the following: Insert#______________ |
0080048SP | When certain night work hours are required. Must be modified to show work hours. (Use when requested by proper authority). Do NOT use with 00800DCSP |
|
LIMITATIONS OF OPERATIONS. (REV 2-14-04) (7-00) SUBARTICLE 8-4.1 (Page 75) is expanded by the following: |
0080050SP | Modify as appropriate (use only when required). Do NOT use with 00800DCSP |
|
HAZARDOUS OR TOXIC WASTE – MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (7-00) SUBARTICLE 8-4.9 (Pages 76 and 77) is expanded by the following: Insert # ________ *Insert Hazardous Waste Coordinator and contact number |
0080049SP | Jobs with Lighting* |
|
COMPUTATION OF CONTRACT TIME. (REV 7-24-96) (FA 9-3-96) (7-00) SUBARTICLE 8-7.1 (Page 79) is deleted and the following substituted: |
008007ASP | A+B Bidding. (Use with proper authority). Use with 00200ABSP, 00300ABSP,0040091SP and 00800ABSP |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (7-00) SUBARTICLE 8-7.1 (Page 79) is expanded by the following: Insert # ________ |
0080072SP | Use when requested by proper authority, (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (7-00) SUBARTICLE 8-7.1 (Page 79) is expanded by the following: Insert # _______ |
0080076SP | Only when called for (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (7-00) SUBARTICLE 8-7.1 (Page 79) is expanded by the following: |
0080700SP | Use when requested by proper authority |
|
DAMAGE RECOVERY. (REV 2-4-04) (7-04) SECTION 8 (Pages 71-86) is expanded by the following: Insert # _______ |
0080013SP | Use when requested by proper authority (Do not use with Lane Rental) |
|
PROSECUTION AND PROGRESS. (REV 7-28-97) (7-00) SECTION 8 (Pages 71-86) is expanded by the following new Article: |
00800D0SP | All Jobs with Alternative Bidding. (Use with proper authority) |
|
8-13. Incentive – Disincentive for A+B. (REV 7-27-04) (FA 7-28-04) (1-05) Insert # _________ |
00800ABSP | A+B Bidding. (Use with proper authority). Use with 00200ABSP, 003000ABSP,0040091SP and 008007ASP |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 5-19-04) (FA 7-13-04) (1-05) Insert # _________ |
00813ABSP | A+B Jobs with Bonus (Use with proper authority) |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert # _________ |
0080016SP | Bonus (Date Specific) (Use with proper authority |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert # _________ |
0080D16SP | Bonus (Calendar Days) (Use with proper authority |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 12-15-03) (FA 1-8-04) (7-04) Insert # _________ |
00800MSSP | Milestone Bonus (Use with proper authority). Do not use with 0081600SP or 0080D16SP |
|
8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert # _________ |
0080017SP | Liquated Savings. (Use with proper authority) |
|
8-13. Incentive - Disincentive. (REV 7-27-04) (FA 7-28-04) (1-05) Insert # _________ |
00800IDSP | Incentive – Disincentive. (Use with proper authority) |
|
8-13. Incentive - Disincentive. (REV 12-15-03) (FA 1-8-04) (7-04) Insert # _________ |
008IDMSSP | Milestone Incentive-Disincentive. (Use with proper authority). Do not use with 00800IDSP |
|
8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) |
00800LRSP | Lane Rental. (Use with proper authority) |
|
8-13. Damage Recovery. (REV 9-25-03) (FA 12-24-03) (7-04) Insert # __________ |
00801LRSP | Lane Rental. (Use with proper authority) |
|
8-13. Incentive – Disincentive for Lane Rental Days. (REV 9-25-03) (FA 12-24-03) (7-04) Insert # __________ |
008IDLRSP | Incentive-Disincentive for Lane Rental Days. (Use with proper authority). Do not use with 00800LRSP or 00801LRSP |
|
MEASUREMENT AND PAYMENT. (REV 11-1-04) (1-05) SUBARTICLE 9-1.3 (Page 87) is deleted and the following substituted: |
00900LSSP | Lump Sum Projects |
|
SCOPE OF PAYMENTS. (REV 11-1-04) (1-05) ARTICLE 9-2 (Page 87) is deleted and the following substituted: |
0090021SP | All Jobs. Excluding Lump Sum Projects |
|
MEASUREMENT AND PAYMENT. (REV 4-7-04) (6-04) SUBARTICLE 9-5.1 (Pages 92) is expanded by the following: |
00900DCSP | District Let Contracts. Excluding Lump Sum Projects |
|
ENGINEER’S FIELD OFFICE. (REV 5-1-02) (FA 5-14-02) (1-03) PAGE 138. The following new Section is added after Section 105: |
1090000SP | 109-7; 2109-7 |
|
REMOVAL OF EXISTING BULKHEAD. (REV 7-10-95) (FA 6-21-99) (7-00) ARTICLE 110-1 (Page 139) is expanded by the following: |
1100073SP | 110-73; 2110-73 |
|
REMOVAL AND DISPOSAL OF FENDER SYSTEM. (REV 3-18-94) (FA 6-21-99) (7-00) SUBARTICLE 110-6.1 (Page 141) is expanded by the following: |
1100001SP | 110-71-1; 2110-71-1. Modify to suit |
|
MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (7-00) SUBARTICLE 110-11.2 (Page 144) is expanded by the following: |
1100113SP | 110-84; 2110-84 |
|
EXCAVATION – IDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (1-03) ARTICLE 120-1 (Pages 147 and 148) is expanded by the following: |
1200003SP | Use when contaminated areas are delineated in the plans |
|
FILL GRAVEL. (REV 3-11-96) (1-04) ARTICLE 120-1 (Pages 147 and 148) is expanded by the following: |
1200123SP | 120-72; 2120-72; plan details required |
|
FILL SAND. (REV 1-3-94) (7-00) PAGE 176. The following new Section is added after Section 125: |
1420000SP | 142-70; 2142-70; (Plans to cover Material and Placement) |
|
STABILIZED SUBBASE UNDER CONCRETE PAVEMENT. (REV 1-3-94) (7-00) ARTICLE 160-3 (Page 181) is expanded by the following: |
1600003SP | Only when called for |
|
ORGANIC SOIL LAYER. (REV 1-19-00) (FA 1-25-00) (7-00) PAGE 190. The following new Section is added after Section 162: |
162A0000SP | 162-4; 2162-4 |
|
STABILIZED SUBBASE. (REV 1-3-94) (7-00) PAGE 192. The following new Section is added after Section 175: |
1800000SP | 180-70; 2180-70 180-71; 2180-71 |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-01) ARTICLE 327-1 (Page 226). The third paragraph is deleted and the following substituted: Insert # ________ |
3270001SP | When the plans provide a location for stockpiling milled material.Insert quantity to be retained. Use all, tons, metric tons, cubic yards or cubic meters |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (7-00) ARTICLE 327-2 (Pages 226 and 227) is expanded by the following: |
3270004SP | Use when requested by districts |
|
SURFACE REQUIREMENTS. (REV 9-23-02) (FA 10-21-02) (7-03) ARTICLE 330-12 (Pages 239-242) is expanded by the following new Subarticle: |
3300126SP | When the design speed is equal to or greater than 50 miles per hour [80 km per hour] |
|
PORTLAND CEMENT CONCRETE. (REV 8-8-03) (1-04) ARTICLE 346-1 (Page 283) is deleted and the following substituted: |
3460001SP | Jobs with Concrete |
|
COMPOSITE PANEL SUPPORT REPAIR. (REV 12-10-93) (7-00) SECTION 400 (of the Supplemental Specifications) is expanded by the following: |
4000003SP | 400-128; 2400-128 |
| PRECAST BULKHEAD PANELS. (REV 7-10-95) (7-00) SUBARTICLE 400-22.1 (of the Supplemental Specifications) is expanded by the following: |
4000217SP | 400-72; 2400-72 (requires plan details) |
| REPLACE GRATES. (REV 2-3-94) (7-00) ARTICLE 425-1 (Page 386) is expanded by the following: |
4250010SP |
425-82; 2425-82 (requires plan details) |
|
DESILTING PIPE. (REV 6-13-95) (FA 6-21-95) (7-00) SECTION 430 (Pages 390-401) is expanded by the following: |
4300094SP | 430-94; 2430-94 |
|
DESILTING CONCRETE BOX CULVERTS. (REV 11-9-93) (7-03) SUBARTICLE 430-12.9(Page 401) is expanded by the following: |
4300013SP | 430-950; 2430-950 |
| DEEP DRAINAGE WELLS. (REV 11-9-93) (7-00) PAGE 409. The following new Section is added after Section 443: |
4440000SP | 444-70; 2444-70 444-71; 2444-71 |
|
PILE INSTALLATION. (REV 1-21-05) (7-05) ARTICLE 455-44 (Pages 530-531). The Last paragraph is deleted and the following substituted: |
4550044SP | Jobs with Structure Foundations |
| INTEGRAL PILE JACKETS. (REV 9-12-94) (7-00) PAGE 533. The following new Section is added after Section 455: |
4570001SP | 457-70; 2457-70 |
| BARRIER WALL REMOVAL (CONCRETE). (REV 7-10-95) (7-00) ARTICLE 521-1 (of the Supplemental Specifications) is expanded by the following: |
5210073SP | 521-73; 2521-73 (plan details required) |
|
OPAQUE VISUAL BARRIER. (REV 4-13-94) (7-00) PAGE 613. The following new Section is added after Section 538: |
5390000SP | 539-80; 2539-80 (requires plan details) |
|
FENCING. (REV 1-6-98) (7-00) ARTICLE 550-2 (of the Supplemental Specifications) is deleted and the following substituted: |
5500021SP | Type A fencing on non-NHS Projects only |
|
COAL TAR-EPOXY COATING OF PERMANENT BULKHEAD SHEET PILES. (REV 1-3-94) (FA 6-21-99 (7-00) ARTICLE 560-11 (Page 655) is expanded to the following new Subarticle: |
5600115SP | Only when called for |
|
PLASTIC EROSION MAT. (REV 1-5-00) (FA 1-12-00) (7-02) Page 668.The following new Section is added after Section 570: |
5710000SP | 571-1; 2571-1 |
|
REWORKING SHOULDERS. (REV 6-15-99) (1-04) Page 670.The following new Section is added after Section 575: |
5770000SP | 577; 2577 Items |
|
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 766. The following new Section is added after Section 715: |
7410000SP | 741-70; 2741-70 |
|
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 766. The following new Section is added after Section 715: |
7430000SP | 743-70; 2743-70 |
|
TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 766. The following new Section is added after Section 715: |
7440000SP | 744-70; 744-70 |
|
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 10-25-01) (FA 12-21-01) (7-02) PAGE 766. The following new Section is added after Section 715: |
7450000SP | 745-70; 2745-70 |
|
TRAFFIC MONITORING SITE CABINET. (REV 6-21-99) (FA 7-20-99) (7-02) PAGE 766. The following new Section is added after Section 715: |
7460000SP | 746-7; 2746-7 |
|
TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (7-00) PAGE 766. The following new Section is added after Section 715: |
7470000SP | 747; 2747 Items |
|
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE
EQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (7-00) PAGE 766. The following new Section is added after Section 715: |
7480000SP | Jobs with Traffic Monitoring Sites |
|
POLE CABLE DISTRIBUTION SYSTEM. (REV 2-3-05) (7-05) ARTICLE 992-12 (Pages 940-944 155) is deleted and the following substituted: |
9920012SP | Jobs with Lighting |
|
TRANSPORTATION ENHANCEMENT PROJECTS. (REV 8-6-96) (FA 12-10-96) (1-04) SUBARTICLE 120-9.2 (Page 155) is expanded by the following: |
ENHANCESP | For non-vehicular enhancement projects only |
| Supplemental Specifications | SS0000001 | All Jobs |
|
001 DEFINITIONS.
(REV 6-28-04) (FA 7-13-04) (1-05)
ARTICLE 1-3, (Pages 2-9) is deleted and the following substituted: |
0010003SS | All Jobs |
|
002 PROPOSAL REQUIREMENTS AND CONDITIONS.
(REV 11-23-04) (FA 12-8-04) (7-05)
SECTION 2, (Pages 9-14) is deleted and the following substituted: |
0020000SS | All Jobs |
|
004 SCOPE OF WORK.
(REV 7-27-04) (FA 7-28-04) (1-05)
SUBARTICLE 4-3.2, (Pages 18-20) is deleted and the following substituted: |
0040032SS | All Jobs |
|
005 CONTROL OF THE WORK.
(REV 7-27-04) (FA 7-28-04) (1-05)
SUBARTICLE 5-1.4.4.1, (Pages 28 and 29) is deleted and the following substituted: |
0051441SS | All Jobs |
|
006 CONTROL OF MATERIALS (REV 11-12-04) (FA 1-14-05) (7-05) SECTION 6 (Pages 47-54) is deleted and the following substituted: |
0060000SS | All Jobs |
|
007 LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 11-3-04) (FA 1-14-05) (7-05) SUBARTICLE 7-1.1 (Pages 55 and 56) is deleted and the following substituted: |
0070001SS | All Jobs |
|
007 WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 2-25-03) (FA 5-16-03) (1-04) ARTICLE 7-16 (Page 69) is deleted and the following substituted: |
0070016SS | All Federal Aid Jobs |
|
008 PROSECUTION AND PROGRESS-SUBLETTING OR ASSIGNING OF CONTRACTS. (REV 10-6-03) (FA 12-22-03) (7-04) ARTICLE 8-1(Pages 71-73) is deleted and the following substituted: |
0080001SS | All Jobs |
|
008 LIMITATIONS OF OPERATIONS-FENCING. (REV 6-17-04) (FA 7-13-04) (1-05) SUBARTICLE 8-4.8 (Page 76) is deleted and the following substituted: |
0080480SS | Jobs on Limited Access Highways |
|
101 BASIS OF PAYMENT-PARTIAL PAYMENTS. (REV 5-10-04) (FA 7-13-04) (1-05) SUBARTICLE 101-2.2 (Page 100) is deleted and the following substituted: |
1010022SS | All Jobs |
|
102 MAINTENANCE OF TRAFFIC. (REV 2-16-04) (FA 2-23-04) (1-05) SUBARTICLE 102-9.3 (Page 107) The second paragraph is deleted and the following substituted: |
1020093SS | All Jobs |
|
102 TEMPORARY VEHICULAR IMPACT ATTENUATOR/CRASH
CUSHION. (REV 1-12-04) (FA 2-24-04) (1-05) SUBARTICLE 102-9.6 (Page 108) is deleted and the following substituted: |
1020096SS |
102-81, 2102-81 102-89, 2102-89 |
|
104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION
AND WATER POLLUTION. (REV 5-24-04) (FA 7-13-04) (1-05) ARTICLE 104-5 (Pages 123–125) is deleted and the following substituted: |
1040005SS | All Jobs |
|
105 CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS. (REV 10-29-04) (FA 11-18-04) (7-05) ARTICLE 105-5 (Pages 133-138) are deleted and the following substituted: |
1050050SS | All Jobs |
|
110 CLEARING AND GRUBBING-MAILBOXES. (REV 10-1-03) (FA 11-6-03) (7-04) SUBARTICLE 110-10.4 (Page 144) is deleted and the following substituted: |
1100104SS | 110-7; 2110-7 |
|
120 EXCAVATION AND EMBANKMENT. (REV 6-25-04) (FA 6-29-04) (1-05) SUBARTICLE 120-9.4 (Page 156) is deleted and the following substituted: |
1200094SS | All Jobs |
|
120 ACCEPTANCE PROGRAM. (REV 6-25-04) (FA 6-29-04) (1-05) ARTICLE 120-10 (Pages 156-159) is deleted and the following substituted: |
1200010SS | All Jobs |
|
125 PIPE TRENCH EXCAVATION. (REV 3-24-04) (FA 4-13-04) (1-05) SUBARTICLE 125-4.4 (Pages 168 and 169) is expanded by the following: |
1250044SS | 430 Items |
|
125 ACCEPTANCE PROGRAM -EXCAVATION
FOR STRUCTURES AND PIPE. (REV 6-25-04) (FA 8-3-04) (7-05) SUBARTICLE 125-8.1.1 (Page 169) is deleted and the following substituted: |
1250081SS | All Jobs |
|
160 ACCEPTANCE PROGRAM. (REV 6-25-04) (FA 6-29-04) (1-05) ARTICLE 160-7 (Pages 184-187) is deleted and the following substituted: |
1600007SS | All Jobs |
|
162 FINISH SOIL LAYER-SPREADING AND MIXING. (REV 8-28-03) (FA 10-14-03) (7-04) SUBARTICLE 162-4.2 (Page 189) is deleted and the following substituted: |
1620042SS | 162-3; 2162-3 |
|
MANDATORY REVISION NO. 2 DELETE THIS SUPPLEMENTAL SPECIFICATION 200 ROCK BASE. (REV 6-25-04) (FA 6-29-04) (1-05) ARTICLE 200-6 (Pages 194-195) is deleted and the following substituted: |
2000006SS | All Jobs |
|
MANDATORY REVISION NO. 2 ADD THIS SUPPLEMENTAL SPECIFICATION 200 ROCK BASE. (REV 8-2-05) (FA 8-3-05) (1-05) ARTICLE 200-6 (Pages 194-195) is deleted and the following substituted: |
2000006SS | All Jobs |
|
200 ROCK BASE-PRIMING. (REV 5-6-04) (FA 6-29-04) (1-05) SUBARTICLE 200-8.1 (Page 198) is deleted and the following substituted: |
2000081SS | 285; 2285 Items |
|
204 METHOD OF MEASUREMENT-AUTHORIZED VARIABLE THICKNESS
BASE. (REV 6-6-03) (FA 6-10-03) (1-04) SUBARTICLE 204-11.3 (Page 201) is deleted and the following substituted: |
2040113SS | 285-7xx; 2285-7xx |
|
283 RECLAIMED ASPHALT PAVEMENT BASE-COMPACTING AND FINISHING
BASE. (REV 5-19-03) (FA 5-20-03) (1-04) ARTICLE 283-4 (Pages 209 and 210) is deleted and the following substituted: |
2830004SS | 285-7xx; 2285-7xx |
|
287 ASPHALT TREATED PERMEABLE BASE. (REV 7-14-03) (FA 8-1-03) (7-04) PAGE 214. The following new Section is added after Section 286: |
2870000SS | 287; 2287 Items |
|
288 CEMENT TREATED PERMEABLE BASE. (REV 11-5-01) (FA 1-3-02) (7-04) PAGE 214. The following new Section is added after Section 286: |
2880000SS | 288; 2288 Items |
|
300 PRIME AND TACK COATS FOR BASE COURSES. (REV 5-6-04) (FA 6-29-04) (1-05) SUBARTICLE 300-7.1 (Page 218) is deleted and the following substituted: |
3000071SS | Asphalt Jobs |
|
320 HOT BITUMINOUS MIXTURES-COLD FEED. (REV 11-3-04) (FA 1-3-05) (7-05) SUBARTICLE 320-2.4 (Page 223) is deleted and the following substituted: |
3200024SS | Asphalt Jobs |
|
334 SUPERPAVE ASPHALT CONCRETE. (REV 12-20-04) (FA 1-6-05) (7-05) SECTION 334 (Pages 243-266) is deleted and the following substituted: |
3340000SS | 334; 2334 Items |
|
337 ASPHALT CONCRETE FRICTION COURSES. (REV 6-22-04) (FA 7-1-04) (1-05) SECTION 337 (Pages 269-278) is deleted and the following substituted: |
3370000SS | 337; 2337 Items |
|
338 VALUE ADDED ASPHALT PAVEMENT. (REV 7-14-03) (FA 8-1-03) (1-04) PAGE 278. The following new Section is added after Section 337: |
3380000SS | Jobs with Asphalt (use with 0083700SP) |
|
341 ASPHALT RUBBER MEMBRANE INTERLAYER-PLACEMENT OF ASPHALT
CONCRETE OVERLAY. (REV 10-30-03) (FA 1-12-04) (7-04) ARTICLE 341-8 (Page 282) is deleted and the following substituted: |
3410008SS | 341; 2341 Items |
|
346 PORTLAND CEMENT CONCRETE. (REV 6-23-04) (FA 6-30-04) (1-05) SUBARTICLE 346-2.5.3 (Pages 285) is deleted and the following substituted: |
3460025SS | Jobs with Portland Cement Concrete |
|
350 CEMENT CONCRETE PAVEMENT. (REV 2-3-04) (FA 2-4-04) (7-04) SECTION 350 (Pages 304-322) is deleted and the following substituted: |
3500000SS | Jobs with Cement Concrete Pavement |
|
352 GRINDING CONCRETE PAVEMENT. (REV 2-3-04) (FA 2-4-04) (7-04) SECTION 352 (Pages 322-326) is deleted and the following substituted: |
3520000SS | 352-70; 2352-70 |
|
353 CONCRETE PAVEMENT SLAB REPLACEMENT. (REV 2-3-03) (FA 2-4-04) (7-04) SECTION 353 (Pages 326-331) is deleted and the following substituted: |
3530000SS | 353-70; 2353-70 |
|
355 VALUE ADDED PORTLAND CEMENT CONCRETE PAVEMENT. (REV 10-8-04) (FA 11-18-04) (7-05) PAGE 331. The following Section is added after 353: |
3550000SS | 350; 2350 Items (use with 0083700SP) |
|
400 CONCRETE STRUCTURES. (REV 7-29-04) (FA 7-30-04) (1-05) SECTION 400 (Pages 333-367) is deleted and the following substituted: |
4000000SS | Jobs with Concrete Structures |
|
407 THREE-SIDED PRECAST CULVERT. (REV 5-9-02) (FA 7-11-02) (1-04) ARTICLE 407-1 (Page 367) is deleted and the following substituted: |
4070002SS | Jobs with Box Culverts |
|
410 PRECAST CONCRETE BOX CULVERT. (REV 4-19-04) (FA 4-22-04) (1-05) SECTION 410 (Pages 369-371) is deleted and the following substituted: |
4100000SS | Jobs with Concrete Box Culverts |
|
415 REINFORCING STEEL. (REV 4-19-04) (FA 4-22-04) (1-05) SECTION 410 (Pages 369-371) is deleted and the following substituted: |
4150000SS | Jobs with Reinforcing Steel |
|
430 FINAL PIPE INSPECTION. (REV 6-17-04) (FA 6-29-04) (1-05) SUBARTICLE 430-4.8 (Page 393) is deleted and the following substituted: |
4300048SS | Jobs with Pipe |
|
436 TRENCH DRAIN. (REV 7-21-03) (FA 8-6-03) (1-04) PAGE 405. The following new Section is added after Section 435: |
4360000SS | 436-1; 2436-1 |
|
446 EDGEDRAIN (DRAINCRETE)- BASIS OF PAYMENT. (REV 10-17-03) (FA 10-21-03) (7-04) ARTICLE 446-7 (Page 411) is deleted and the following substituted: |
4460007SS | 446-1; 2446-1; 446-71 and 2446-71 |
|
449 PRECAST CONCRETE DRAINAGE PRODUCTS. (REV 5-29-03) (FA 10-23-03) (7-04) ARTICLE 449-1 (Pages 411). The fourth paragraph is deleted and the following substituted: |
4490001SS | All Jobs |
|
450 MATERIAL ACCEPTANCE AND TESTING- CONCRETE. (REV 5-2-03) (FA 6-19-03) (1-04) SUBARTICLE 450-4.1. (Page 420) is deleted and the following substituted: |
4500041SS |
450 Items 2450 Items |
|
452 PRECAST SEGMENTAL BRIDGE CONSTRUCTION. (REV 6-14-04) (FA 7-30-04) (7-05) PAGE 462. The following new Section is added after Section 451: |
4520000SS | All Precast Segmental Bridge Jobs |
|
453 EPOXY JOINTING OF PRECAST SEGMENTS. (REV 1-28-03) (FA 2-6-03) (1-04) PAGE 490. The following new Section is added after Section 451: |
4530000SS | Jobs with Segmental Bridges |
|
455 STRUCTURES FOUNDATIONS. (REV 6-3-04) (FA 7-1-04) (1-05) ARTICLE 455-1 (Pages 462-465) is expanded by the following: |
4550001SS | Jobs with Structures Foundations |
|
455 CONCRETE PLACEMENT-GENERAL. (REV 9-23-03) (FA 11-6-03) (7-04) SUBARTICLE 455-17.1 (Pages 515 and 516) is deleted and the following substituted: |
4550171SS | Jobs with Concrete Drilled Shafts |
|
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS. (REV 7-27-04) (FA 7-28-04) (1-05) SUBARTICLE 460-2.1 (Page 535) is deleted and the following substituted: |
4600021SS | Jobs with Structural Steel |
|
461 MULTIROTATIONAL BEARINGS. (REV 4-3-03) (FA 5-20-03) (1-04) SECTION 461 (Pages 554-557) is deleted and the following substituted: |
4610000SS |
461-113; 2461-113 461-114; 2461-114 |
|
508 ELECTRICAL CONSTRUCTION FOR MOVABLE BRIDGES. (REV 7-27-04) (FA 7-28-04) (1-05) SECTION 508 (Pages 567-583) is deleted. |
5080000SS | Jobs with Movable Bridges |
|
510 NAVIGATION LIGHTS FOR FIXED BRIDGES. (REV 7-27-04) (FA 7-28-04) (1-05) ARTICLE 510-2 (PAGE 583) is deleted and the following substituted: |
5100002SS | 510-1; 2510-1 |
|
521 CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS. (REV 9-21-04) (FA 12-8-04) (7-05) SECTION 521 (Pages 589-591) is deleted and the following substituted: |
5210000SS | All Jobs |
|
526 ARCHITECTURAL PAVERS. (REV 10-19-04) (FA 12-16-04) (7-05) SECTION 526 (Pages 595-597) is deleted and the following substituted: |
5260000SS | 526; 2526 Items |
|
527 CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS. (REV 11-23-04) (FA 12-14-04) (7-05) PAGE 597. The following Section is added after Section 526: |
5270000SS |
522-1; 2522-1 527-1; 2527-1 |
|
534 SOUND BARRIERS. (REV 11-20-03) (FA 12-22-03) (7-04) SECTION 534 (Page 603-607) is deleted and the following substituted: |
5340000SS | 534-72; 2534-72 |
|
536 GUARDRAIL - REFLECTOR ELEMENTS. (REV 9-21-04) (FA 11-30-04) (7-05) SUBARTICLE 536-2.5 (Page 609) is deleted and the following substituted: |
5360025SS | All Jobs |
|
536 REMOVAL OF EXISTING GUARDRAIL- BASIS OF PAYMENT. (REV 8-29-03) (FA 9-18-03) (7-04) SUBARTICLE 536-7.7 (Page 611) is deleted and the following substituted: |
5360007SS | 536-73; 2536-73 |
|
548 RETAINING WALLS SYSTEMS. (REV 12-1-03) (FA 12-22-03) (7-04) SECTION 548 (Pages 616-623) is deleted and the following substituted: |
5480000SS | All Jobs |
|
550 FENCING. (REV 3-15-04) (FA 3-29-04) (7-04) SECTION 550 (Pages 623-628) is deleted and the following substituted: |
5500000SS |
550-10; 2550-10 550-60; 2550-60 |
|
561 SELF-CURING INORGANIC ZINC COATING SYSTEMS. (REV 3-18-03) (FA 5-15-03) (1-04) ARTICLE 561-2 (Pages 657 and 658) is deleted and the following substituted: |
5610002SS | 561-1; 2561-1 |
|
575 SODDING. (REV 1-5-04) (FA 1-8-04) (7-04) SECTION 575 (Pages 668-670) is deleted and the following substituted: |
5750000SS | All Jobs |
|
580 LANDSCAPING INSTALLATION. (REV 6-23-03) (FA 6-24-03) (1-04) SECTION 580 (Pages 670-675) is deleted and the following substituted: |
5800000SS | Landscaping Jobs (with 0083700 SP) |
|
611 ACCEPTANCE OF SIGNAL INSTALLATIONS-SUBMITTAL REQUIREMENTS. (REV 1-14-03) (FA 3-22-04) (1-05) SUBARTICLE 611-2.3.1 (Page 680) is deleted and the following substituted: |
6110231SS | Signal Jobs |
|
620 SIGNAL INSTALLATION GROUNDING. (REV 7-12-01) (FA 1-3-02) (1-04) SUBARTICLE 620-3.1 (Page 685). The first paragraph is deleted and the following substituted: |
6200031SS | All Jobs |
|
641 PRESTRESSED CONCRETE POLES. (REV 2-24-04) (FA 3-22-04) (1-05) SECTION 641 (Pages 702-703) is deleted and the following substituted: |
6410000SS | All Jobs |
|
700 HIGHWAY SIGNING. (REV 9-20-04) (FA 11-18-04) (7-05) SECTION 700 (Pages 727-37) is deleted and the following substititued: |
7000000SS | All Jobs |
|
706 RAISED RETRO-REFLECTIVE PAVEMENT MARKERS AND BITUMINOUS ADHESIVE-METHOD OF MEASUREMENT. (REV 6-10-03) (FA 6-12-03) (1-04) ARTICLE 706-7 (Page 748) is deleted and the following substituted: |
7060007SS | Jobs with RPMs |
|
709 TRAFFIC STRIPES AND MARKINGS-TWO REACTIVE
COMPONENTS.
(REV 8-27-01) (FA 12-19-01) (1-04) PAGE 748. The following new Section is added after 706: |
7090000SS | 709, 2709 Items |
|
710 PAINTED PAVEMENT MARKINGS. (REV 6-10-03) (FA 7-16-03) (1-04) SECTION 710 (Pages 748-752) is deleted and the following substituted: |
7100000SS | 710; 2710 Items |
|
713 PREFORMED PAVEMENT STRIPES AND MARKINGS. (REV 9-17-01) (FA 12-19-01) (7-02) SECTION 713 (Pages 758-760) is deleted and the following substituted: |
7130041SS | 713; 2713 Items |
|
714 MOTORIST AID CALL BOX RELOCATION. (REV 11-30-00) (FA 2-2-01) (7-01) PAGE 760. The following new Section is added after Section 713: |
7140000SS | 714-1, 2714-1; 400-2, 2400-2 (requires plan details) |
|
916 BITUMINOUS MATERIALS. (REV 7-28-03) (FA 1-13-04) (7-04) SECTION 916 (Pages 785-797) is deleted and the following substituted: |
9160000SS | Asphalt Jobs |
|
926 EPOXY COMPOUNDS. (REV 3-18-05) (FA 4-13-05) (1-06) ARTICLE 926-1 (Pages 808 and 809) is deleted and the following substituted: |
9260001SS | Jobs with Concrete |
|
937 ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS. (REV 7-15-03) (FA 8-6-03) (1-04) SECTION 937 (Pages 844-846) is deleted and the following substituted: |
9370000SS | All Jobs |
|
938 POST-TENSION GROUT. (REV 11-10-03) (FA 11-25-03) (7-04) PAGE 846.The following new Section is added after 937: |
9380000SS | Post-Tensioning Jobs and Jobs with cylinder piles |
|
MANDATORY REVISION NO. 2 ADD THIS SUPPLEMENTAL SPECIFICATION 948 MISCELLANEOUS TYPE OF PIPE-CORRUGATED POLYETHYLENE PIPE. (REV 2-8-05) (FA 3-3-05) (7-05) ARTICLE 948-2 (Page 859) is deleted and the following substituted: |
9480002SS | All Jobs |
|
948 PIPE LINER-MACHINE SPIRAL WOUND PIPE LINER. (REV 11-12-03) (FA 2-4-04) (7-04) SUBARTICLE 948-4.4 (Page 861) is expanded by the following: |
9480044SS | Jobs with Pipe |
|
971 COATINGS AND TRAFFIC MARKING MATERIALS-QUALIFIED
PRODUCTS LIST. (REV 1-7-05) (FA 1-11-05) (7-04) SUBARTICLE 971-1.4 (Pages 882) is deleted and the following substituted: |
9710014SS | All Jobs |
|
972 RECYCLED PLASTIC PRODUCTS-MATERIALS. (REV 10-19-04) (FA 12-16-04) (7-05) ARTICLE 972-3 (Pages 915 and 916) is deleted and the following substituted: |
9720033SS | Jobs with Reinforcing Steel |
|
975 ELASTOMERIC COATING SYSTEMS. (REV 8-28-03) (FA 11-13-03) (7-04) ARTICLE 975-2 (Pages 918) is deleted and the following substituted: |
9750002SS | All Post-Tensioning Jobs |
|
987 FINISH SOIL LAYER MATERIALS-DESCRIPTION. (REV 9-2-03) (FA 1-8-04) (7-04) ARTICLE 987-1 (Page 924) is deleted and the following substituted: |
9870001SS | All Jobs |
|
993 REFLECTOR UNITS FOR GUARDRAIL. (REV 9-21-04) (FA 11-18-04) (7-05) ARTICLE 993-5 (Pages 947) is deleted and the following substituted: |
9930050SS | All Jobs |
|
994 RETROREFLECTIVE AND NONRETROREFLECTIVE SIGN SHEETING. (REV 12-1-04) (FA 1-13-04) (7-05) ARTICLE 994-3 (Pages 948 and 949) is deleted and the following substituted: |
9940033SS | All Jobs |