EMERGENCY INFORMATION - To be displayed on a situational basis. Hidden otherwise. Due to weather conditions, the Florida Highway Patrol has closed the Sunshine Skyway Bridge. More…

Specifications and Estimates

Specifications and Estimates / Specifications

July 2004 Workbook

Specifications and Estimates

Implemented Modifications to the 2004 Standard Specifications

July 2004 Workbook

for Lettings Effective July 2004 - December 2004


Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.

Supplemental Specifications - Additions or revisions to the Standard Specifications.

Change Table - Shows all changes made to the Specifications within this workbook.

History of Revisions - To review the History of revisions for this Workbook.


Note: These files are in Adobe Acrobat (PDF) format.

File size ranges from 9 kb to 279 kb.


SPECIAL PROVISIONS SP0000001 All Jobs
INTENT AND SCOPE.

ARTICLE 4-1 (Page 17) is expanded by the following:
The Improvements under this Contract consist of (Place description here).

The summary of pay items for this project is listed in the plans.
Insert # ________

The summary of pay items for this project is listed in the plans.
0040002SP All Jobs, except Lump Sum
INTENT AND SCOPE.

ARTICLE 4-1 (Page 17) is deleted and the following substituted:

Insert # _________
00401LSSP All Lump Sum Projects
(REV 8-22-96) (FA 9-3-96) (7-00)
For this Contract, the Department will reject any bid in which the bidder submits proposed Contract time in excess of _________ calendar days.

Insert # _________
0040091SP 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with 00200ABSP, 00300ABSP, 00800ASP and 00800ABSP
(REV 2-8-94) (7-00)

It is anticipated that construction by others will be underway at each end and within this project during the life of this Contract. Coordinate construction operations with those of other Contractors as necessary.
0040010SP When other Contractors are working in the vicinity
EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND SITE OF WORK.
(REV 4-19-99) (1-02)

ARTICLE 2-4 (of the Supplemental Specifications) is expanded by the following:

Insert # __________
0020024SP All Jobs, (add a phone number or e-mail address)
PREPARATION OF PROPOSALS.
(REV 11-5-97) (FA 1-25-98) (7-00)

SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded by the following:
00200ABSP 999-10, 2999-10;A+B Bidding. (Use with proper authority). Use with 00300ABSP, 040091SP, 00800ABSP and 008007ASP 
PREPARATION OF PROPOSALS.
(REV 4-29-97) (FA 5-7-97) (7-00)

SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded by the following:

Insert # __________
00200LRSP 999-5, 2999-5;Lane Rental. (Use with proper authority). Use with 00300LRSP, 00800LRSP and 00801LRSP
AWARD AND EXECUTION OF CONTRACT.
(REV 11-5-97) (FA 1-20-98) (7-00)

ARTICLE 3-1 (Page 16). The first and second sentences are deleted and the following substituted:

Insert # _________
00300ABSP 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with 00200ABSP, 0040091SP,008007ASP and 00800ABSP
AWARD AND EXECUTION OF CONTRACT.
(REV 7-27-00) (1-01)

ARTICLE 3-1 (Pages 14 and 15). The first paragraph is expanded by the following:

Insert # _________
00300DCSP All District Let and Maintenance Contracts excluding Lump Sum
AWARD AND EXECUTION OF CONTRACT.
(REV 8-1-00) (1-01)

ARTICLE 3-1 (Pages 14 and 15). The first paragraph is deleted and the following substituted:
00300LSSP Lump Sum Projects
AWARD AND EXECUTION OF CONTRACT.
(REV 4-11-97) (FA 5-7-97) (7-00)

ARTICLE 3-1 (Page 14 and 15). The first and second sentences are deleted and the following substituted:
00300LRSP 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with 00200LRSP, 00800LRSP and 00801LRSP 
AWARD AND EXECUTION OF CONTRACT.
(REV 7-26-01) (1-02)

ARTICLE 3-2 (Page 15) is expanded by the following:

Insert # _________
*Contracts Office must approve
0032000SP When necessary to change standard “Award and Execution”*
AWARD AND EXECUTION OF CONTRACT.
(REV 2-7-97) (7-00)

SUBARTICLE 3-2.1 (Page 15) is deleted and the following substituted:
00300003SP Bid Average Method (Use with proper authority)
ALTERATION OF PLANS OR OF CHARACTER OF WORK.
(REV 8-1-00) (1-01)

SUBARTICLE 4-3.1 (Page 18) is deleted and the following substituted:
00403LSSP Lump Sum Projects
VALUE ENGINEERING INCENTIVE.
(REV 8-12-96) (FA 7-2-97) (7-00)

SUBARTICLE 4-3.9 (Pages 22-25) is deleted.
00400DCSP District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum
UNFORESEEABLE WORK.
(REV 9-28-98) (7-00)

ARTICLE 4-4 (Page 25) is deleted and the following substituted:
0040004SP 999-25
2999-25
MANDATORY REVISION NO. 2

ADD THIS SPECIAL PROVISION

NOTICE OF INTELLECTUAL PROPERTY INTERESTS AND DEPARTMENT'S FUTURE RIGHTS TO A VECP.
(REV 1-29-04) (7-04)

SUBARTICLE 4-3.9.8 (Page 25) is deleted and the following substituted:
0040398SP All Jobs 
MANDATORY REVISION NO. 2

DELETE THIS SPECIAL PROVISION

DESIGN STANDARDS (ENGLISH UNITS).
(REV 2-5-04) (7-04)

SUBARTICLE 5-1.1 (Page 26). The "Design Standards" booklet for English Units, dated January 2002, is modified as follows:
005011ESP All English Jobs 
MANDATORY REVISION NO. 2

ADD THIS SPECIAL PROVISION

DESIGN STANDARDS (ENGLISH UNITS).
(REV 4-2-04) (7-04)

SUBARTICLE 5-1.1 (Page 26). The "Design Standards" booklet for English Units, dated January 2004, is modified as follows:
005011ESP All English Jobs 
MANDATORY REVISION NO. 2

DELETE THIS SPECIAL PROVISION

DESIGN STANDARDS (METRIC UNITS).
(REV 2-5-04) (7-04)

SUBARTICLE 5-1.1 (Page 26). The "Roadway and Traffic Design Standards" booklet for Metric Units, dated January 2000, is modified as follows:
005011MSP All Metric Jobs 
MANDATORY REVISION NO. 2

ADD THIS SPECIAL PROVISION

DESIGN STANDARDS (METRIC UNITS).
(REV 4-2-04) (7-04)

SUBARTICLE 5-1.1 (Page 26). The "Roadway and Traffic Design Standards" booklet for Metric Units, dated January 2000, is modified as follows:
005011MSP All Metric Jobs 
CONTROL OF THE WORK.
(REV 3-15-02) (1-03)

SUBARTICLE 5-1.1 (Page 26) is expanded by the following:
00500LSSP Lump Sum Projects
INSPECTION.
(REV 2-10-94) (7-00)

SUBARTICLE 5-9.1 (Page 38) is expanded by the following:

Insert # __________
0050091SP Long bridge jobs (1500 feet [450 m] or longer); modify to suit
CONTROL OF MATERIALS.
(REV 1-9-01) (7-01)

ARTICLE 6-1 (of the Supplemental Specifications) is expanded by the following new Subarticles:
00600LSSP Lump Sum Projects
LAWS TO BE OBSERVED.
(REV 2-1-02) (1-04)

SUBARTICLE 7-1.1 (of the Supplemental Specifications) is expanded by the following:
0070011SP All Federal Aid Jobs
ENDANGERED SPECIES.
(REV 2-10-94) (7-00)

SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following:
0070010SP When called for (woodpecker) 
ENDANGERED SPECIES.
(REV 2-27-96) (FA 3-26-96) (1-03)

SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following:
0070014SP When called for (Manatees and/or turtles) 
PERMITS PROCURED BY THE DEPARTMENT.
(REV 8-7-01) (7-02)

SUBARTICLE 7-2.1 (Page 59) is expanded by the following:
0070021SP Jobs with permit(s) procured by DOT
PERMITS PROCURED BY THE CONTRACTOR.
(REV 12-18-00) (1-01)

SUBARTICLE 7-2.1 (Page 65) is expanded by the following:
0070022SP Jobs with buildings
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE.
(REV 6-9-03) (FA 6-12-03) (1-04)

SUBARTICLE 7-2.2 (Page 59) is expanded by the following:
0070002SP When DEP Generic Permit is required
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC.
(REV 1-9-01) (1-04)

SUBARTICLE 7-7.1 (Page 60) is expanded by the following:

Insert # ________
00700DCSP District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum
STRUCTURES OVER NAVIGATABLE WATERS.
(REV 2-10-94) (7-00)

ARTICLE 7-8 (Page 62) is expanded by the following:
0070080SP When work platforms are indicated in the permit for construction
USE OF EXPLOSIVES.
(REV 9-26-94) (7-00)

ARTICLE 7-9 (Pages 68 and 69) is deleted and the following substituted:
0070008SP When explosives are prohibited
UTILITY WORK.
(REV 2-10-94) (7-02)

SUBARTICLE 7-11.6.3 (Page 66) is expanded by the following:
0071164SP When there are no utility work schedules
UTILITY SCHEDULES.
(REV 8-27-01) (7-02)

SUBARTICLE 7-11.6.3 (Page 66) is expanded by the following:
0070116SP When there are utility work schedules
WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 1-3-03) (FA 5-16-03) (1-04)

ARTICLE 7-16 (of the Supplemental Specifications) is expanded by the following:

Insert # ________
0070160SP All Federal Aid Jobs
DISADVANTAGED BUSINESS ENTERPRISE PROGRAM.
(REV 6-6-02) (FA 7-17-02) (1-03)

SECTION 7 (Pages 55-71) is expanded by the following:
0070025SP All Jobs 
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-03)

SECTION 7 (Pages 55-71) is expanded by the following:
0070026SP Non-Federal Aid Projects 
ON-THE-JOB TRAINING.
(REV 6-20-02) (1-04)
SECTION 7 (Pages 55-71) is expanded by the following:
0070027SP All Jobs 
SUBLETTING CONTRACTS.
(REV 2-14-94) (7-00)

SUBARTICLE 8-1.1 (of he Supplemental Specifications) is expanded by the following:
0080010SP Pressure Epoxy Grouting pay item “Injecting and Sealing Prestressed Beams”
PROSECUTION AND PROGRESS.
(REV 8-1-00) (1-03)

SUBARTICLE 8-1.2 (Pages 72 and 73) is deleted.
00800LSSP Lump Sum Projects
SUBMISSION OF WORKING SCHEDULE.
(REV 5-30-02) (FA 7-24-02) (1-03)

SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted:
0080032SP Use only when CPM is authorized by District Construction Engineer. Do not use with 0080039SP or 00800DCSP 
SUBMISSION OF WORKING SCHEDULE.
(REV 5-30-02) (FA 7-24-02) (1-03)

SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted:
0080039SP Use only when CPM is authorized by District Construction Engineer. Do not use with 0080032SP or 00800DCSP 
PROSECUTION AND PROGRESS.
(REV 2-27-01) (1-03)

SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted.
00800DCSP District Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts. Do not use with 0080032SP, 0080039SP, or 0080050SP 
PROSECUTION OF WORK - FLEXIBLE START TIME.
(REV 8-2-96) (FA 9-4-96) (1-03)

SUBARTICLE 8-3.3 (Page 74) is deleted and the following substituted:

Insert # ________
*Contracts Office must be notified
0080083SP When called for*
BEGINNING WORK.
(REV 7-10-95) (7-00)

SUBARTICLE 8-3.3 (Page 74). The last sentence is deleted and the following substituted:

Insert # ________
0080330SP Only when called for by the District Construction Engineer
BEGINNING WORK.
(REV 10-22-98) (FA 11-5-98) (7-00)

SUBARTICLE 8-3.3 (Page 74)  is expanded by the following substituted:

Insert # ________
*Contracts Office must be notified
0080033SP Only when called for by the District Construction Engineer
PROSECUTION OF WORK - PARTNERING.
(REV 3-4-98) (FA 5-26-98) (7-00)

ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle:

Insert # _______
*Contracts Office must be notified
0080036SP 999-16*
2999-16*
PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 11-19-02) (FA 3-5-03) (1-04)

ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle:
0080037SP 999-20*
2999-20*
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 4-1-02) (FA 12-12-02) (7-03)

ARTICLE 8-3 (Pages 73-5) is expanded by the following new Subarticle:
0080370SP Jobs without 999-20;
2999-20 
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 6-23-03) (FA 8-1-03) (1-04)

ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle:
0083700SP Jobs with Asphalt Pavement, concrete pavement, landscape installation
LIMITATIONS OF OPERATIONS.
(REV 2-14-04) (7-00)

SUBARTICLE 8-4.1 (Page 75) is expanded by the following:Insert#______________
0080048SP When certain night work hours are required. Must be modified to show work hours. (Use when requested by proper authority). Do NOT use with 00800DCSP 
LIMITATIONS OF OPERATIONS.
(REV 2-14-04) (7-00)

SUBARTICLE 8-4.1 (Page 75) is expanded by the following:
0080050SP Modify as appropriate (use only when required). Do NOT use with 00800DCSP 
HAZARDOUS OR TOXIC WASTE - MERCURY-CONTAINING DEVICES AND LAMPS.
(REV 11-6-95) (FA 12-27-95) (7-00)

SUBARTICLE 8-4.9 (Pages 76 and 77) is expanded by the following:

Insert # ________ *Insert Hazardous Waste Coordinator and contact number
0080049SP Jobs with Lighting*
COMPUTATION OF CONTRACT TIME.
(REV 7-24-96) (FA 9-3-96) (7-00)

SUBARTICLE 8-7.1 (Page 79) is deleted and the following substituted:
008007ASP 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with 00200ABSP, 00300ABSP,0040091SP and 00800ABSP
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 1-19-99) (7-00)

SUBARTICLE 8-7.1 (Page 79) is expanded by the following:

Insert # ________
0080072SP Use when requested by proper authority, (must be modified)
COMPUTATION OF CONTRACT TIME.
(REV 2-14-94) (7-00)

SUBARTICLE 8-7.1 (Page 79) is expanded by the following:

Insert # _______
0080076SP Only when called for (must be modified)
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 2-1-99) (7-00)

SUBARTICLE 8-7.1 (Page 79) is expanded by the following:
0080700SP Use when requested by proper authority
DAMAGE RECOVERY.
(REV 2-4-04) (7-04)

SECTION 8 (Pages 71-86) is expanded by the following:

Insert # _______
0080013SP Use when requested by proper authority (Do not use with Lane Rental)
PROSECUTION AND PROGRESS.
(REV 7-28-97) (7-00)

SECTION 8 (Pages 71-86) is expanded by the following new Article:
00800D0SP All Jobs with Alternative Bidding. (Use with proper authority)
8-13. Incentive - Disincentive for A+B.
(REV 12-17-03) (FA 1-8-04) (7-04)

Insert # _________
00800ABSP 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with 00200ABSP, 003000ABSP,0040091SP and 008007ASP 
8-13. “Bonus” Payment and Waiver of Contractor Claims.
(REV 12-16-03) (FA 1-8-04) (7-04)

Insert # _________
0080016SP Bonus (Date Specific) (Use with proper authority
8-13. “Bonus” Payment and Waiver of Contractor Claims.
(REV 12-16-03) (FA 1-8-04) (7-04)


Insert # _________
0080D16SP Bonus (Calendar Days) (Use with proper authority
8-13. “Bonus” Payment and Waiver of Contractor Claims.
(REV 12-15-03) (FA 1-8-04) (7-04)

Insert # _________
00800MSSP Milestone Bonus (Use with proper authority). Do not use with 0081600SP or 0080D16SP
8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)

Insert # _________
0080017SP Liquated Savings. (Use with proper authority)
8-13. Incentive - Disincentive.
(REV 12-15-03) (FA 1-8-04) (7-04)
Insert # _________
00800IDSP Incentive - Disincentive. (Use with proper authority)
8-13. Incentive - Disincentive.
(REV 12-15-03) (FA 1-8-04) (7-04)

Insert # _________
008IDMSSP Milestone Incentive-Disincentive. (Use with proper authority). Do not use with 00800IDSP
8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)
00800LRSP 999-5, 2999-5; Lane Rental. (Use with proper authority)
8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert # __________
00801LRSP 999-5, 2999-5; Lane Rental. (Use with proper authority)
8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert # __________
008IDLRSP Incentive-Disincentive for Lane Rental Days. (Use with proper authority). Do not use with 00800LRSP or 00801LRSP
MANDATORY REVISION NO. 1

DELETE THIS SPECIAL PROVISION

MEASUREMENT AND PAYMENT.
(REV 10-1-03) (FA 10-14-03 (7-04)

SUBARTICLE 9-1.3 (Page 87) is deleted and the following substituted:
00900LSSP Lump Sum Projects
MANDATORY REVISION NO. 1

ADD THIS SPECIAL PROVISION

SCOPE OF PAYMENTS.
(REV 3-19-04) (7-04)

SUBARTICLE 9-1.3 (Page 87) is deleted and the following substituted:
00900LSSP Lump Sum Projects
MANDATORY REVISION NO. 1

DELETE THIS SPECIAL PROVISION

MEASUREMENT AND PAYMENT.
(REV 5-7-97) (FA 7-2-97) (1-03)

SUBARTICLES 9-2.1.1 and 9-2.1.2 (Pages 88 and 89) are deleted.
00900DCSP District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum Projects
MANDATORY REVISION NO. 2

ADD THIS SPECIAL PROVISION

MEASUREMENT AND PAYMENT.
(REV) (7-04)

SUBARTICLES 9-2.1.1 and 9-2.1.2 (Pages 88 and 89) are deleted.
00900DCSP District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum Projects
MANDATORY REVISION NO. 2

ADD THIS SPECIAL PROVISION

SCOPE OF PAYMENTS.
(REV 3-19-04) (7-04)

ARTICLE 9-2 (Pages 88 and 89) is deleted and the following substituted:
0090021SP All Jobs
TEMPORARY VEHICULAR IMPACT ATTENUATOR/CRASH CUSHION.
(REV 10-15-03) (7-04)

SUBARTICLE 102-9.6 (Page 108) is deleted and the following substituted:
1020096SP 102-81; 2102-81; 102-89; 2102-89
ENGINEER’S FIELD OFFICE.
(REV 5-1-02) (FA 5-14-02) (1-03)

PAGE 138. The following new Section is added after Section 105:
1090000SP 109-71; 2109-71
REMOVAL OF EXISTING BULKHEAD.
(REV 7-10-95) (FA 6-21-99) (7-00)

ARTICLE 110-1 (Page 139) is expanded by the following:
1100073SP 110-73; 2110-73
REMOVAL AND DISPOSAL OF FENDER SYSTEM.
(REV 3-18-94) (FA 6-21-99) (7-00)

SUBARTICLE 110-6.1 (Page 141) is expanded by the following:
1100001SP 110-71-1; 2110-71-1. Modify to suit
MATERIAL FOR REEF ESTABLISHMENT.
(REV 7-10-95) (FA 6-21-99) (7-00)

SUBARTICLE 110-11.2 (Page 144) is expanded by the following:
1100113SP 110-84; 2110-84
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION.
(REV 1-3-94) (FA 6-21-99) (1-03)

ARTICLE 120-1 (Pages 147 and 148) is expanded by the following:
1200003SP Use when contaminated areas are delineated in the plans
FILL GRAVEL.
(REV 3-11-96) (1-04)

ARTICLE 120-1 (Pages 147 and 148) is expanded by the following:
1200123SP 120-72; 2120-72; plan details required
FILL SAND.
(REV 1-3-94) (7-00)

PAGE 176. The following new Section is added after Section 125:
1420000SP 142-70; 2142-70; (Plans to cover Material and Placement)
STABILIZED SUBBASE UNDER CONCRETE PAVEMENT.
(REV 1-3-94) (7-00)

ARTICLE 160-3 (Page 181) is expanded by the following:
1600003SP Only when called for
ORGANIC SOIL LAYER.
(REV 1-19-00) (FA 1-25-00) (7-00)

PAGE 190. The following new Section is added after Section 162:
162A0000SP 162-4; 2162-4
STABILIZED SUBBASE.
(REV 1-3-94) (7-00)

PAGE 192. The following new Section is added after Section 175:
1800000SP 180-70; 2180-70
 180-71; 2180-71
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-01)

ARTICLE 327-1 (Page 226). The third paragraph is deleted and the following substituted:

Insert # ________
3270001SP When the plans provide a location for stockpiling milled material.Insert quantity to be retained. Use all, tons, metric tons, cubic yards or cubic meters 
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 12-1-93) (7-00)

ARTICLE 327-2 (Pages 226 and 227) is expanded by the following:
3270004SP Use when requested by districts
SURFACE REQUIREMENTS.
(REV 9-23-02) (FA 10-21-02) (7-03)

ARTICLE 330-12 (Pages 239-242) is expanded by the following new Subarticle:
3300126SP When the design speed is equal to or greater than 50 miles per hour [80 km per hour]
SUPERPAVE ASPHALT CONCRETE.
(REV 8-14-03) (1-04)

ARTICLE 334-2.5.1 (Pages 246-247) are deleted and the following substituted:
3340251SP 334; 2334 Items
PORTLAND CEMENT CONCRETE.
(REV 8-8-03) (1-04)

ARTICLE 346-1 (Page 283) is deleted and the following substituted:
3460001SP Jobs with Concrete
COMPOSITE PANEL SUPPORT REPAIR.
(REV 12-10-93) (7-00)

SECTION 400 (of the Supplemental Specifications) is expanded by the following:
4000003SP 400-128; 2400-128
PRECAST BULKHEAD PANELS.
(REV 7-10-95) (7-00)

SUBARTICLE 400-22.1 (of the Supplemental Specifications) is expanded by the following:
4000217SP 400-72; 2400-72 (requires plan details)
REPLACE GRATES.
(REV 2-3-94) (7-00)

ARTICLE 425-1 (Page 386) is expanded by the following:
4250010SP 425-82; 2425-82 
(requires plan details)
DESILTING PIPE.
(REV 6-13-95) (FA 6-21-95) (7-00)

SECTION 430 (Pages 390-401)  are expanded by the following:
4300094SP 430-94; 2430-94 
DESILTING CONCRETE BOX CULVERTS.
(REV 11-9-93) (7-03)

SUBARTICLE 430-12.9(Page 401)  is expanded by the following:
4300013SP 430-950; 2430-950
DEEP DRAINAGE WELLS.
(REV 11-9-93) (7-00)

PAGE 409. The following new Section is added after Section 443:
4440000SP 444-70; 2444-70
444-71; 2444-71
INTEGRAL PILE JACKETS.
(REV 9-12-94) (7-00)

PAGE 533. The following new Section is added after Section 455:
4570001SP 457-70; 2457-70
BARRIER WALL REMOVAL (CONCRETE).
(REV 7-10-95) (7-00)

ARTICLE 521-1 (of the Supplemental Specifications) is expanded by the following:
5210073SP 521-73; 2521-73 (plan details required)
COLORING CONCRETE SURFACES.
(REV 4-1-99) (7-00)

PAGE 593. The following new Section is added after Section 522:
5230000SP 523-70; 2523-70
OPAQUE VISUAL BARRIER.
(REV 4-13-94) (7-00)

PAGE 613. The following new Section is added after Section 538:
5390000SP 539-80; 2539-80 (requires plan details)
FENCING.
(REV 1-6-98) (7-00)

ARTICLE 550-2 (Page 623) is deleted and the following substituted:
5500021SP Type A fencing on non-NHS Projects only
COAL TAR-EPOXY COATING OF PERMANENT BULKHEAD SHEET PILES.
(REV 1-3-94) (FA 6-21-99 (7-00)

ARTICLE 560-11 (Page 655) is expanded to the following new Subarticle:
5600115SP Only when called for 
PLASTIC EROSION MAT.
(REV 1-5-00) (FA 1-12-00) (7-02)

Page 668.The following new Section is added after Section 570:
5710000SP 571-1; 2571-1
REWORKING SHOULDERS.
(REV 6-15-99) (1-04)

Page 670.The following new Section is added after Section 575:
5770000SP 577; 2577 Items
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II).
(REV 6-16-99) (FA 7-20-99) (7-02)

PAGE 766. The following new Section is added after Section 715:
7410000SP 741-70;  2741-70
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT.
(REV 6-16-99) (FA 7-20-99) (7-02)

PAGE 766. The following new Section is added after Section 715:
7430000SP 743-70; 2743-70
TRAFFIC MONITORING SITE SOLAR POWER UNIT.
(REV 6-16-99) (FA 7-20-99) (7-02)

PAGE 766. The following new Section is added after Section 715:
7440000SP 744-70; 744-70 
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY.
(REV 10-25-01) (FA 12-21-01) (7-02)

PAGE 766. The following new Section is added after Section 715:
7450000SP 745-70; 2745-70 
TRAFFIC MONITORING SITE CABINET.
(REV 6-21-99) (FA 7-20-99) (7-02)

PAGE 766. The following new Section is added after Section 715:
7460000SP 746-7;  2746-7
TRAFFIC MONITORING SITE MODEM.
(REV 5-20-99) (FA 7-20-99) (7-00)

PAGE 766. The following new Section is added after Section 715:
7470000SP 747; 2747 Items
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE EQUIPMENT AND MATERIALS.
(REV 5-12-99) (FA 7-20-99) (7-00)

PAGE 766. The following new Section is added after Section 715:
7480000SP Jobs with Traffic Monitoring Sites
TRANSPORTATION ENHANCEMENT PROJECTS.
(REV 8-6-96) (FA 12-10-96) (1-04)

SUBARTICLE 120-9.2 (Page 155) is expanded by the following:
ENHANCESP For non-vehicular enhancement projects only
 
Supplemental Specifications SS0000001 All Jobs
001       DEFINITIONS.
(REV 1-6-04) (FA 1-8-04) (7-04)

 

ARTICLE 1-3, (Pages 2-9) are deleted and the following substituted:

0010003SS All Jobs
002       PROPOSAL REQUIREMENTS AND CONDITIONS.
( REV 12-22-03) (FA 2-4-04) (7-04)

 

SECTION 2, (Pages 9-14) are deleted and the following substituted:

0020000SS All Jobs
004       INCREASE, DECREASE OR ALTERATION IN THE WORK.
( REV 12-22-03) (FA 1-8-04) (7-04)

 

SUBARTICLE 4-3.2, (Pages 18-20) are deleted and the following substituted:

0040032SS All Jobs

MANDATORY REVISION NO. 2

Workbook dated February 6, 2004

ADD THIS SUPPLEMENTAL SPECIFICATION

004       NOTICE OF INTELLECTUAL PROPERTY INTERESTS AND DEPARTMENT'S FUTURE RIGHTS TO A VECP.
( REV 1-29-04) (FA 3-29-04) (7-04)

 

SUBARTICLE 4-3.9.8, (Page 25) is deleted and the following substituted:

0040398SS All Jobs
005       STYLE, NUMBERING AND MATERIAL OF SUBMITTALS-DRAWINGS.
( REV 9-25-03) (FA 11-6-03) (7-04)

 

SUBARTICLE 5-1.4.4.1 (Pages 28 and 29) are deleted and the following substituted:

0051441SS All Jobs
005       COMPENSATION FOR EXTRA WORK OR DELAY.
(REV 9-26-03) (FA 1-16-03) (7-04)

 

SUBARTICLE 5-12.6 (Pages 42-44) are deleted and the following substituted:

0050126SS All Jobs
006       CONTROL OF MATERIALS
(REV 7-11-03) (FA 8-1-03) (1-04)

SECTION 6 (Pages 47-54) are deleted and the following substituted:
0060000SS All Jobs
007        LAWS TO BE OBSERVED.
(REV 1-30-04) (FA 2-4-04) (7-04)

SUBARTICLE 7-1.1 (Pages 55 and 56) are deleted and the following substituted:
0070001SS All Jobs
007       WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 2-25-03) (FA 5-16-03) (1-04)

ARTICLE 7-16 (Page 69) is deleted and the following substituted:
0070016SS All Federal Aid Jobs
008       PROSECUTION AND PROGRESS.
(REV 10-6-03) (FA 12-22-03) (7-04)

ARTICLE 8-1(Pages 71-73) are deleted and the following substituted:
0080001SS All Jobs
008       PROSECUTION AND PROGRESS.
(REV 2-4-03) (FA 5-12-03) (1-04)

SUBARTICLE 8-4.8 (Page 76) is deleted and the following substituted:
0080480SS Jobs on Limited Access Highways
MANDATORY REVISION NO. 1

DELETE THIS SUPPLEMENTAL SPECIFICATION

009             SCOPE OF PAYMENT.
(REV 6-24-04) (FA 10-23-03) (7-04)

ARTICLE 9-2 (Pages 88 and 89) are deleted and the following substituted:
0090021SS All Jobs
101       BASIS OF PAYMENT-PARTIAL PAYMENTS.
(REV 12-4-03) (FA 12-24-03) (7-04)

SUBARTICLE 101-2.2 (Page 100) is deleted and the following substituted:
1010022SS All Jobs
102       MAINTENANCE OF TRAFFIC-BARRIER WALL (TEMPORARY).
(REV 6-10-03) (FA 6-13-03) (1-04)

SUBARTICLE 102-9.5.2 (Page 108) is deleted and the following substituted:
1020952SS All Jobs
104       PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION.
(REV 6-10-03) (FA 6-13-03) (1-04)

ARTICLE 104-5 (Pages 123-125) is deleted and the following substituted:
1040005SS All Jobs
105       CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS.
(REV 10-21-03) (FA 12-18-03) (7-04)

SUBARTICLES 105-5.3 and 105-5.4 (Page 134) is deleted and the following substituted:
1050005SS All Jobs
110       CLEARING AND GRUBBING-MAILBOXES.
(REV 10-1-03) (FA 11-6-03) (7-04)

SUBARTICLE 110-10.4 (Page 144) is deleted and the following substituted:
1100104SS 110-7; 2110-7 
120       ACCEPTANCE PROGRAM-QUALITY CONTROL TESTS.
(REV 6-6-03) (FA 8-1-03) (1-04)

SUBARTICLE 120-10.1.4.3 (Page 157) is deleted and the following substituted:
1200010SS All Jobs
125        EXCAVATION FOR STRUCTURES AND PIPES-ACCEPTANCE PROGRAM.
(REV 6-25-04) (FA 6-29-04) (1-05)

ARTICLE 125-9.3 (Pages 173) is deleted and the following substituted:
1250093SS All Jobs
162        FINISH SOIL LAYER-SPREADING AND MIXING.
(REV 8-28-03) (FA 10-14-03) (7-04)

SUBARTICLE 120-9.4 (Page 156) is deleted and the following substituted:
1620042SS 162-3; 2162-3 
204        METHOD OF MEASUREMENT-AUTHORIZED VARIABLE THICKNESS BASE.
(REV 6-6-03) (FA 6-10-03) (1-04)

SUBARTICLE 204-11.3 (Page 201) is deleted and the following substituted:
2040113SS 285-7xx; 2285-7xx 
283        RECLAIMED ASPHALT PAVEMENT BASE-COMPACTING AND FINISHING BASE.
(REV 5-19-03) (FA 5-20-03) (1-04)

ARTICLE 283-4 (Pages 209 and 210) are deleted and the following substituted:
2830004SS 285-7xx; 2285-7xx 
287        ASPHALT TREATED PERMEABLE BASE.
(REV 7-14-03) (FA 8-1-03) (7-04)

PAGE 214. The following new Section is added after Section 286:
2870000SS 287; 2287 Items 
288        CEMENT TREATED PERMEABLE BASE.
(REV 11-5-01) (FA 1-3-02) (7-04)

PAGE 214. The following new Section is added after Section 286:
2880000SS 288; 2288 Items
338        VALUE ADDED ASPHALT PAVEMENT.
(REV 7-14-03) (FA 8-1-03) (1-04)

PAGE 317. The following new Section is added after Section 337:
3380000SS Jobs with Asphalt (use with 0083700SP)
341        ASPHALT RUBBER MEMBRANE INTERLAYER-PLACEMENT OF ASPHALT CONCRETE OVERLAY.
(REV 10-30-03) (FA 1-12-04) (7-04)

ARTICLE 341-8 (Page 282) is deleted and the following substituted:
3410008SS 341; 2341 Items 
350       CEMENT CONCRETE PAVEMENT.
(REV 2-3-04) (FA 2-4-04) (7-04)

SECTION 350 (Pages 304-322) are deleted and the following substituted:
3500000SS Jobs with Cement Concrete Pavement
352       GRINDING CONCRETE PAVEMENT.
(REV 2-3-04) (FA 2-4-04) (7-04)

SECTION 352 (Pages 322-326) are deleted and the following substituted:
3520000SS 352-70; 2352-70
353       CONCRETE PAVEMENT SLAB REPLACEMENT.
(REV 2-3-03) (FA 2-4-04) (7-04)

SECTION 353 (Pages 326-331) are deleted and the following substituted:
3530000SS 353-70; 2353-70 
355       VALUE ADDED PORTLAND CEMENT CONCRETE PAVEMENT.
(REV 7-14-03) (FA 8-1-03) (1-04)

PAGE 331. The following Section is added after 353:
3550000SS 350; 2350 Items (use with 0083700SP)
400       CONCRETE STRUCTURES-MATERIALS.
(REV 4-22-03) (FA 5-15-03) (1-04)

SUBARTICLE 400-5.7.2 (Page 338) is deleted and the following substituted:
4000572SS Jobs with Concrete Structures 
407       THREE-SIDED PRECAST CULVERT.
(REV 5-9-02) (FA 7-11-02) (1-04)

ARTICLE 407-1 (Page 367) is deleted and the following substituted:
4070002SS Jobs with Box Culverts
410       PRECAST CONCRETE BOX CULVERT.
(REV 6-24-02) (FA 7-11-02) (1-04)

ARTICLE 410-1 (Page 369) is deleted and the following substituted:
4100002SS Jobs with Box Culverts 410-70, 2410-70
436       TRENCH DRAIN.
(REV 7-21-03) (FA 8-6-03) (1-04)

PAGE 405. The following new Section is added after Section 435:
4360000SS 436-1; 2436-1
446       EDGEDRAIN (DRAINCRETE)- BASIS OF PAYMENT.
(REV 10-17-03) (FA 10-21-03) (7-04)

ARTICLE 446-7 (Page 411) is deleted and the following substituted:
4460007SS 446-1; 2446-1; 446-71 and 2446-71 
449       PRECAST CONCRETE DRAINAGE PRODUCTS.
(REV 5-29-03) (FA 10-23-03) (7-04)

ARTICLE 449-1 (Pages 411). The fourth paragraph is deleted and the following substituted:
4490001SS All Jobs
450       MATERIAL ACCEPTANCE AND TESTING- CONCRETE.
(REV 5-2-03) (FA 6-19-03) (1-04)

SUBARTICLE 450-4.1. (Page 420) is deleted and the following substituted:
4500041SS 450 Items
2450 Items 
452       PRECAST SEGMENTAL BRIDGE CONSTRUCTION.
(REV 1-9-03) (FA 1-28-03) (1-04)

PAGE 462. The following new Section is added after Section 451:
4520000SS All Precast Segmental Bridge Jobs
453       EPOXY JOINTING OF PRECAST SEGMENTS.
(REV 1-28-03) (FA 2-6-03) (1-04)

PAGE 490. The following new Section is added after Section 451:
4530000SS Jobs with Segmental Bridges
455       CONCRETE PLACEMENT-GENERAL.
(REV 9-23-03) (FA 11-6-03) (7-04)

SUBARTICLE 455-17.1 (Pages 515 and 516) are deleted and the following substituted:
4550171SS Jobs with Concrete Drilled Shafts 
460       STRUCTURAL STEEL AND MISCELLANEOUS METALS.
(REV 5-7-01) (FA 10-23-01) (7-03)

SUBARTICLE 460-2.1 (Page 535) is deleted and the following substituted:
4600000SS Jobs with Structural Steel 
461       MULTIROTATIONAL BEARINGS.
(REV 4-3-03) (FA 5-20-03) (1-04)

SECTION 461 (Pages 554-557) are deleted and the following substituted:
4610000SS 461-113; 2461-113
461-114; 2461-114 
465       MOVABLE BRIDGES.
(REV 1-10-03) (FA 3-13-03) (1-04)

PAGE 557. The following new Section is added after Section 461
4650000SS Movable Bridges Jobs 
512       CONTROL HOUSE.
(REV 7-27-04) (FA 7-28-04) (1-05)

PAGE 584. The following new Section is added after Section 510
5120000SS 512; 2512 Items 
521       CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS.
(REV 12-1-03) (FA 2-3-04) (7-04)

SECTION 521 (Pages 589-591) are deleted and the following substituted:
5210000SS All Jobs
534       SOUND BARRIERS.
(REV 11-20-03) (FA 12-22-03) (7-04)

SECTION 534 (Page 603-607) are deleted and the following substituted:
5340000SS 534-72; 2534-72
536       REMOVAL OF EXISTING GUARDRAIL- BASIS OF PAYMENT.
(REV 8-29-03) (FA 9-18-03) (7-04)

SUBARTICLE 536-7.7 (Page 611) is deleted and the following substituted:
5360007SS 536-73; 2536-73
548       RETAINING WALLS SYSTEMS.
(REV 12-1-03) (FA 12-22-03) (7-04)

SECTION 548 (Pages 616-623) are deleted and the following substituted:
5480000SS All Jobs 

MANDATORY REVISION NO. 2

Workbook dated February 6, 2004

ADD THIS SUPPLEMENTAL SPECIFICATION

550       FENCING.
( REV 1-5-04) (FA 3-29-04) (7-04)

 

SECTION 550 (Pages 623-628) are deleted and the following substituted:

5500000SS 550-10; 2550-10; 550-60; 2550-60
561       SELF-CURING INORGANIC ZINC COATING SYSTEMS.
(REV 3-18-03) (FA 5-15-03) (1-04)

ARTICLE 561-2 (Pages 657 and 658) are deleted and the following substituted: 
5610002SS 561-1; 2561-1 
575       SODDING.
(REV 1-5-04) (FA 1-8-04) (7-04)

SECTION 575 (Pages 668-670) are deleted and the following substituted:
5750000SS All Jobs 
580       LANDSCAPING INSTALLATION.
(REV 6-23-03) (FA 6-24-03) (1-04)

SECTION 580 (Pages 670-675) are deleted and the following substituted:
5800000SS Landscaping Jobs (with 0083700SP) 
620       SIGNAL INSTALLATION GROUNDING.
(REV 7-12-01) (FA 1-3-02) (1-04)

SUBARTICLE 620-3.1 (Page 685). The first paragraph is deleted and the following substituted:
6200031SS All Jobs 

MANDATORY REVISION NO. 2

Workbook dated February 6, 2004

ADD THIS SUPPLEMENTAL SPECIFICATION

700       SIGN ASSEMBLY DESIGN REQUIREMENTS - SIGN BACKGROUND.
( REV 2-25-04) (FA 3-22-04) (7-04)

 

SUBARTICLE 700-2.5 (Page 731) is expanded by the following:

7000025SS All Jobs
706        RAISED RETRO-REFLECTIVE PAVEMENT MARKERS AND BITUMINOUS ADHESIVE-METHOD OF MEASUREMENT.
(REV 6-10-03) (FA 6-12-03) (1-04)

ARTICLE 706-7 (Page 748) is deleted and the following substituted:
7060007SS Jobs with RPMs
709       TRAFFIC STRIPES AND MARKINGS-TWO REACTIVE COMPONENTS.
(REV 8-27-01) (FA 12-19-01) (1-04)

PAGE 748. The following new Section is added after 706:
7090000SS 709, 2709 Items 
710       PAINTED PAVEMENT MARKINGS.
(REV 6-10-03) (FA 7-16-03) (1-04)

SECTION 710 (Pages 748-752) are deleted and the following substituted:
7100000SS 710; 2710 Items 
713       PREFORMED PAVEMENT STRIPES AND MARKINGS.
(REV 9-17-01) (FA 12-19-01) (7-02)

SECTION 713 (Pages 758-760) are deleted and the following substituted:
7130041SS When Called For
714       MOTORIST AID CALL BOX RELOCATION.
(REV 11-30-00) (FA 2-2-01) (7-01)

PAGE 760. The following new Section is added after Section 713:
7140000SS 714-1, 2714-1; 400-2, 2400-2 (requires plan details)
916       BITUMINOUS MATERIALS.
(REV 7-28-03) (FA 1-13-04) (7-04)

SECTION 916 (Pages 785-797) are deleted and the following substituted:
9160000SS Asphalt Jobs
926       EPOXY COMPOUNDS.
(REV 6-11-03) (FA 8-6-03) (1-04)

ARTICLE 926-1 (Pages 808 and 809) are deleted and the following substituted:
9260001SS Jobs with Concrete
937       ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS.
(REV 7-15-03) (FA 8-6-03) (1-04)

SECTION 937 (Pages 844-846) are deleted and the following substituted:
9370000SS All Jobs 
938       POST-TENSION GROUT.
(REV 11-10-03) (FA 11-25-03) (7-04)

PAGE 846.The following new Section is added after 937:
9380000SS Post-Tensioning Jobs and Jobs with cylinder piles 
948       PIPE LINER-MACHINE SPIRAL WOUND PIPE LINER.
(REV 11-12-03) (FA 2-4-04) (7-04)

SUBARTICLE 948-4.4 (Page 861) is expanded by the following:
9480044SS Jobs with Pipe 
975       ELASTOMERIC COATING SYSTEMS.
(REV 8-28-03) (FA 11-13-03) (7-04)

ARTICLE 975-2 (Pages 918) is deleted and the following substituted:
9750002SS All Post-Tensioning Jobs 
987       FINISH SOIL LAYER MATERIALS-DESCRIPTION.
(REV 9-2-03) (FA 1-8-04) (7-04)

ARTICLE 987-1 (Page 924) is deleted and the following substituted:
9870001SS All Jobs

MANDATORY REVISION NO. 2

Workbook dated February 6, 2004

ADD THIS SUPPLEMENTAL SPECIFICATION

994       PHYSICAL REQUIREMENTS - COLOR.
( REV 2-25-04) (FA 3-10-04) (7-04)

 

SUBARTICLE 994-3.3 (Page 948) is deleted and the following substituted:

9940033SS All Jobs