EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Specifications and Estimates

Specifications and Estimates / Specifications

July 2002 Workbook

Specifications and Estimates

Implemented Modifications to the 2000 Standard Specifications


July 2002 Workbook

for Lettings Effective July 2002 - December 2002




Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.

Supplemental Specifications - Additions or revisions to the Standard Specifications.

Change Table - Shows all changes made to the Specifications within this workbook.


Note: These files are in Adobe Acrobat (PDF) format.

File size ranges from 9 kb to 279 kb.


SPECIAL PROVISIONS SP0000001 All Jobs
INTENT AND SCOPE.

ARTICLE 4-1 (Page 19) is expanded by the following:
The Improvements under this Contract consist of (Place description here).

The summary of pay items for this project is listed in the plans.
Insert # ________

The summary of pay items for this project is listed in the plans.
D0040002 All Jobs, except Lump Sum
INTENT AND SCOPE.

ARTICLE 4-1 (Page 18) is deleted and the following substituted:

Insert # _________
D00401LS All Lump Sum Projects
(REV 8-22-96) (FA 9-3-96) (7-00)
For this Contract, the Department will reject any bid in which the bidder submits proposed Contract time in excess of _________ calendar days.

Insert # _________
D0040091 999-10' 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D00300AB, D008007A and D008007AB
(REV 2-8-94) (7-00)

It is anticipated that construction by others will be underway at each end and within this project during the life of this Contract. Coordinate construction operations with those of other Contractors as necessary.
D0040010 When other Contractors are working in the vicinity
DEFINITIONS.
(REV 12-30-94) (FA 5-26-95) (7-00)

ARTICLE 1-3 (Pages 2-10). The definition of Controlling Work Items is deleted and the following substituted:
D0010013 CPM Jobs
MANDATORY REVISION

DELETE THIS SPECIAL PROVISION

PROPOSAL REQUIREMENTS AND CONDITIONS.
(REV 11-1-01) (7-02)
ARTICLE 2-2 (of the Supplemental Specifications) is deleted and the following substituted:

D0020022 For total electronic projects
PROPOSAL REQUIREMENTS AND CONDITIONS.
(REV 7-27-00) (1-01)

ARTICLE 2-2 (of the Supplemental Specifications). Beginning with the third paragraph to the end of Article 2-2, the text is deleted.
D00201DC All District Let and Maintenance Contracts excluding Lump Sum
MANDATORY REVISION

DELETE THIS SPECIAL PROVISION

PROPOSAL REQUIREMENTS AND CONDITIONS.

(REV 8-1-00) (1-01)
ARTICLE 2-2 (of the Supplemental Specifications). The first three paragraphs are deleted and the following substituted:
D00200LS Lump Sum projects let in Central Office

PROPOSAL REQUIREMENTS AND CONDITIONS.

(REV 8-1-00) (1-01)
ARTICLE 2-2 (of the Supplemental Specifications). Beginning with the third paragraph to the end of Article 2-2, the text is deleted.

D002DCLS Lump Sum Projects let in the District
EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND SITE OF WORK.
(REV 4-19-99) (1-02)

ARTICLE 2-4 (of the Supplemental Specifications) is expanded by the following:

Insert # __________
D0020024 All Jobs, (add a phone number or e-mail address)
PREPARATION OF PROPOSALS.
(REV 11-5-97) (FA 1-25-98) (7-00)

SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded as follows:
D00200AB 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00300AB, D0040091, D00800AB and D008007A 
PREPARATION OF PROPOSALS.
(REV 4-29-97) (FA 5-7-97) (7-00)

SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded by the following:

Insert # __________
D00200LR 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with D00300LR, D00800LR and D00801LR
AWARD AND EXECUTION OF CONTRACT.
(REV 11-5-97) (FA 1-20-98) (7-00)

ARTICLE 3-1 (of the Supplemental Specifications). The first and second sentences are deleted and the following substituted:

Insert # _________
D00300AB 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D0040091,D008007A and D00800AB
AWARD AND EXECUTION OF CONTRACT.
(REV 7-27-00) (1-01)

ARTICLE 3-1 (of the Supplemental Specifications). The first paragraph is expanded by the following:

Insert # _________
D00300DC All District Let and Maintenance Contracts excluding Lump Sum
AWARD AND EXECUTION OF CONTRACT.
(REV 8-1-00) (1-01)

ARTICLE 3-1 (of the Supplemental Specifications). The first paragraph is deleted and the following substituted:
D00300LS Lump Sum Projects
AWARD AND EXECUTION OF CONTRACT.
(REV 4-11-97) (FA 5-7-97) (7-00)

ARTICLE 3-1 (of the Supplemental Specifications). The first and second sentences are deleted and the following substituted:
D00300LR 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with D00200LR, D00800LR and D00801LR 
AWARD AND EXECUTION OF CONTRACT.
(REV 7-26-01) (1-02)

ARTICLE 3-2 (of the Supplemental Specifications) is expanded by the following:

Insert # _________
*Contracts Office must approve
D0032000 When necessary to change standard “Award and Execution”*
AWARD AND EXECUTION OF CONTRACT.
(REV 2-7-97) (7-00)

SUBARTICLE 3-2.1 (of the Supplemental Specifications) is deleted and the following substituted:
D00300003 Bid Average Method (Use with proper authority)
ALTERATION OF PLANS OR OF CHARACTER OF WORK.
(REV 8-1-00) (1-01)

SUBARTICLE 4-3.1 (of the Supplemental Specifications) is deleted and the following substituted:
D00403LS Lump Sum Projects
VALUE ENGINEERING INCENTIVE.
(REV 8-12-96) (FA 7-2-97) (7-00)

SUBARTICLE 4-3.9 (of the Supplemental Specifications) is deleted.
D00400DC District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum
UNFORESEEABLE WORK.
(REV 9-28-98) (7-00)

ARTICLE 4-4 (Page 25) is deleted and the following substituted:
D0040004 999-25
2999-25

DESIGN STANDARDS (ENGLISH UNITS).

(REV 2-5-01) (7-02)


SUBARTICLE 5-1.1 (Page 26). The “Design Standards” booklet for English Units, dated January 2002, is modified as follows:

D005011E All English Jobs

ROADWAY AND TRAFFIC DESIGN STANDARDS (METRIC UNITS).

(REV 2-5-02) (7-02)


SUBARTICLE 5-1.1 (Page 26). The “Roadway and Traffic Design Standards” booklet for Metric Units, dated January, 2000, is modified as follows:

D005011M All Metric Jobs

CONTROL OF THE WORK.

(REV 1-9-01) (7-01)


SUBARTICLE 5-1.1 (Page 26) is expanded as follows:

D00500LS Lump Sum Projects
INSPECTION.
(REV 2-10-94) (7-00)

SUBARTICLE 5-9.1 (Page 40) is expanded by the following:

Insert # __________
D0050091 Long bridge jobs (1500 feet [450 m] or longer); modify to suit
CONTROL OF MATERIALS.
(REV 1-9-01) (7-01)

ARTICLE 6-1 (Pages 49 and 50) is expanded by the following new Subarticles:
D00600LS Lump Sum Projects
LAWS TO BE OBSERVED.
(REV 2-1-02) (7-02)

SUBARTICLE 7-1.1 (54 and 56) is expanded by the following:
D0070011 Federal Aid Jobs
ENDANGERED SPECIES.
(REV 2-10-94) (7-00)

SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following:
D0070010 When called for (woodpecker) 
ENDANGERED SPECIES.
(REV 2-27-96) (FA 3-26-96) (7-00)

SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following:
D0070014 When called for (Manatees and/or turtles) 
PERMITS PROCURED BY THE DEPARTMENT.
(REV 8-7-01) (7-02)

SUBARTICLE 7-2.1 (Page 58) is expanded by the following:
D0070021 Jobs with permit(s) procured by DOT
PERMITS PROCURED BY THE CONTRACTOR.
(REV 12-18-00) (1-01)

SUBARTICLE 7-2.1 (Page 58) is expanded by the following:
D0070022 Jobs with buildings
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE.
(REV 2-21-01) (7-02)

SUBARTICLE 7-2.2 (Page 58) is expanded by the following:
D0070002

When NPDES is required

LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC.
(REV 1-9-01) (1-01)

SUBARTICLE 7-7.1 (Page 59) is expanded by the following:

Insert # ________
D00700DC District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum
STRUCTURES OVER NAVIGATABLE WATERS.
(REV 2-10-94) (7-00)

ARTICLE 7-8 (Page 61) is expanded by the following:
D0070080 When work platforms are indicated in the permit for construction
USE OF EXPLOSIVES.
(REV 9-26-94) (7-00)

ARTICLE 7-9 (Page 61) is deleted and the following substituted:
D0070008 When explosives are prohibited
MANDATORY REVISION 

ADD THIS SPECIAL PROVISION


CONTRACTOR’S RESPONSIBILITY FOR WORK.
(REV 2-13-02) (7-02)


ARTICLE 7-14 (Page 68) is deleted and the following substituted:

D0070140 All Jobs 
UTILITY WORK.
(REV 2-10-94) (7-02)

SUBARTICLE 7-11.6.3 (Pages 65 and 66) is expanded by the following:
D0071164 When no utility work is anticipated 
UTILITY WORK.
(REV 8-27-01) ((7-02)

SUBARTICLE 7-11.6.3 (Pages 65 and 66) is expanded by the following:
D0070116 When there is Utility work
WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 8-27-99) (FA 11-16-99) (7-02)

ARTICLE 7-16 (of the Supplemental Specifications) is expanded by the following:

Insert # ________
D0070160 All Federal Aid Jobs
PROSECUTION AND PROGRESS-SUBLETTING OR ASSIGNING OF CONTRACTS.
(REV 2-5-02) (7-02)

SUBARTICLE 8-1.1 (Page 71) The first paragraph is deleted and the following substituted:
D0080011 All Jobs
SUBLETTING CONTRACTS.
(REV 2-14-94) (7-00)

SUBARTICLE 8-1.1 (Page 71) is expanded by the following:
D0080010 Pressure Epoxy Grouting pay item “Injecting and Sealing Prestressed Beams”
PROSECUTION AND PROGRESS.
(REV 8-1-00) (7-02)

SUBARTICLE 8-1.1 (Page 71) The first paragraph is deleted and the following substituted: 
D00800LS Lump Sum Projects
SPECIALTY WORK.
(REV 9-28-98) (7-00)

SUBARTICLE 8-1.2 (Page 72). The text is deleted and the following substituted:

Insert #___________
D0080012 For Contracts not normally performed by Road and Bridge Contractors
SUBMISSION OF WORKING SCHEDULE.
(REV 11-29-99) (FA 12-7-99) (7-00)

SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted:
D0080032 Use only when authorized by District Construction Engineer. Do not use with D0080003, D0080039 or D00800DC 
SUBMISSION OF WORKING SCHEDULE.
(REV 11-29-99) (FA 12-21-99) (7-00)

SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted:
D0080039 Use only when authorized by District Construction Engineer. Do not use with D0080003, D0080032 or D00800DC 
PROSECUTION AND PROGRESS.
(REV 2-27-01) (7-01)

SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted.
D00800DC District Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts. Do not use with D0080003, D0080039, D0080048 or D0080050 
PROSECUTION OF WORK - FLEXIBLE START TIME.
(REV 8-2-96) (FA 9-4-96) (7-00)

SUBARTICLE 8-3.3 (Page 74) is deleted and the following substituted:

Insert # ________
*Contracts Office must be notified
D0080083 When called for*
(For use on Non-NHS projects ONLY) 
BEGINNING WORK.
(REV 7-10-95) (7-00)

SUBARTICLE 8-3.3 (Page 74). The last sentence is deleted and the following substituted:

Insert # ________
D0080330 When called for by the District Construction Engineer
BEGINNING WORK.
(REV 10-22-98) (FA 11-5-98) (7-00)

SUBARTICLE 8-3.3 (Page 74) is expanded by the following substituted:

Insert # ________
*Contracts Office must be notified
D0080033 Only when called for by the District Construction Engineer
PROSECUTION OF WORK - PARTNERING.
(REV 3-4-98) (FA 5-26-98) (7-00)

ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle:

Insert # _______
*Contracts Office must be notified
D0080036 999-16*
2999-16*
PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-23-01) (FA 2-1-01) (7-02)

ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle:
D0080037 999-20*
2999-20*
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 6-5-01) (FA 6-20-01) (1-03)

ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle:
D0080370 Jobs without 999-20;
2999-20 
LIMITATIONS OF OPERATIONS.
(REV 2-14-94) (7-00)

SUBARTICLE 8-4.1 (Pages 74 and 75) is expanded by the following:Insert#______________
D0080048 When certain night work hours are required. Must be modified to show work hours. (Use when requested by proper authority). Do NOT use with D00800DC 
LIMITATIONS OF OPERATIONS.
(REV 2-14-94) (7-00)

SUBARTICLE 8-4.1 (Pages 74 and 75) is expanded by the following:
D0080050 Modify as appropriate (use only when required). Do NOT use with D00800DC 
HAZARDOUS OR TOXIC WASTE - MERCURY-CONTAINING DEVICES AND LAMPS.
(REV 11-6-95) (FA 12-27-95) (7-00)

SUBARTICLE 8-4.9 (Page 76) is expanded by the following:

Insert # ________ *Insert Hazardous Waste Coordinator and contact number
D0080049 Jobs with Lighting*
COMPUTATION OF CONTRACT TIME.
(REV 7-24-96) (FA 9-3-96) (7-00)

SUBARTICLE 8-7.1 (Page 78) is deleted and the following substituted:
D008007A 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D00300AB,D0080091 and D00800AB
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 1-19-99) (7-00)

SUBARTICLE 8-7.1 (Page 79) is expanded by the following:

Insert # ________
D0080072 Use when requested by proper authority, (must be modified)
COMPUTATION OF CONTRACT TIME.
(REV 2-14-94) (7-00)

SUBARTICLE 8-7.1 (Page 78) is expanded by the following:

Insert # _______
D0080076 Only when called for (must be modified)
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 2-1-99) (7-00)

SUBARTICLE 8-7.1 (Page 78) is expanded by the following:
D0080700 Use when requested by proper authority
PROSECUTION AND PROGRESS.
(REV 7-28-97) (7-00)

SECTION 8 (Pages 71-84) is expanded by the following new Article:
D00800D0 All Jobs with Alternative Bidding. (Use with proper authority)
8-13. Incentive - Disincentive for A+B.
(REV 3-8-99) (7-00)

Insert # _________
D00800AB 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D003000AB,D0040091 and D008007A 
8-13. “No Excuse Bonus” Payment and Waiver of Contractor Claims.
(REV 3-8-99) (7-01)

Insert # _________
D0080016 Bonus (Date Specific) (Use with proper authority)
8-13. “No Excuse Bonus” Payment and Waiver of Contractor Claims.
(REV 3-8-99) (7-01)


Insert # _________
D0080D16 Bonus (Calendar Days) (Use with proper authority)
8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)

Insert # _________
D0080017 Liquated Savings. (Use with proper authority)
8-13. Incentive - Disincentive.
(REV 3-8-99) (7-00)

Insert # _________
D00800ID Incentive - Disincentive. (Use with proper authority)
8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)
D00800LR 999-5, 2999-5; Lane Rental. (Use with proper authority)
8-13. Damage Recovery.
(REV 4-11-97) (FA 5-7-97) (7-00)

Insert # __________
D00801LR 999-5, 2999-5; Lane Rental. (Use with proper authority)
MEASUREMENT AND PAYMENT.
(REV 10-29-01) (FA 1-9-02) (7-02)

SUBARTICLE 9-1.3 (Page 85) is deleted and the following substituted:
D00900LS Lump Sum Projects
MEASUREMENT AND PAYMENT.
(REV 5-7-97) (FA 7-2-97) (7-02)

SUBARTICLES 9-2.1.1 and 9-2.1.2 (of the Supplemental Specifications) are deleted.
D00900DC District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum Projects
WITHHOLDING PAYMENT.
(REV 12-18-01) (7-02)

SUBARTICLE 9-6.3.2 (of the Supplemental Specifications) is deleted and the following substituted:
D0090632 All Jobs 
MAINTENANCE OF TRAFFIC-CROSSING INTERSECTIONS.
(REV 5-14-01) (FA 5-21-01) (1-02)

SUBARTICLE 102-2.3 (Page 106) is expanded as follows:
D1020023 102-107, 2102-107
PORTABLE TRAFFIC SIGNAL.
(REV 10-27-99) (FA 11-1-99) (7-00)

SUBARTICLE 102-3.1 (Pages 106 and 107) is expanded as follows:
D1020031 102-104-1, 2102-104-1
TEMPORARY GLARE SCREEN.
(REV 5-14-01) (FA 5-21-01) (1-02)

SUBARTICLE 102-3 (Pages 106-111) is expanded as follows:
D1020003 Temporary Glare Screen
WORKZONE PAVEMENT MARKINGS.
(REV 6-18-97) (7-02)

SUBARTICLE 102-3.3 (Pages 108-111) is deleted and the following substituted:
D1020033 All Jobs
PROTABLE REGULATORY SIGNS.
(REV 12-11-00) (FA6-20-01) (7-02)

SUBARTICLE 102-2.3 (Pages 106-111) is expanded by the following new Subarticle:
D1020035 900-102-1, 2900-102-1
RADAR SPEED DISPLAY UNIT.
(REV 12-11-00) (FA 6-20-01) (1-02)

SUBARTICLE 102-2.3 (Pages 106-111) is expanded by the following new Subarticle:
D1020037 900-102-2, 2900-102-2
SAFETY WARNING TRANSMITTER.
(REV 12-11-00) (FA 6-20-01) (1-02)

SUBARTICLE 102-2.3 (Pages 106-111) is expanded by the following new Subarticle:
D1020038 900-102-3, 2900-102-3
PORTABLE HIGHWAY ADVISORY RADIO SYSTEM.
REV 12-11-00) (FA 6-20-01) (1-02)

SUBARTICLE 102-2.3 (Pages 106-111) is expanded by the following new Subarticle:
D1020036 900-102-4, 2900-102-4
MAINTENANCE OF TRAFFIC.
(REV 3-17-94) (7-00)

SECTION 102 (Pages 104-115) is expanded as follows:
D1020001 Heading
(REV 3-17-94) (7-00)

For moving pavement marking operations...
D10200E1 Jobs with Stiping
(REV 3-17-94) (7-00)

ARTICLE 102-8 (Page 115) is expanded by the following new Subarticle:
D10200D1 Job with Pay Item Breakdown
(REV 3-13-98) (FA 4-2-98) (7-02)

102-8. Work Zone Signs
D10200A5 102-60, 2102-60
(REV 11-8-99) (FA 4-6-00) (1-01)

102-8. Work Zone Business Entrance Signs
D10200A8 102-61, 2102-61
(REV 10-17-97) (FA 2-17-98) (7-02)

102-8. Temporary Curb
D10200A4 102-69, 2102-69
(REV 5-31-95) (7-00)

102-8. Concrete Barrier Wall (Temporary) (With or Without Glare Screen)
D1020917 102-70, 2102-70; 102-79, 2102-79
(REV 2-15-99) (FA 3-16-99) (7-00)

102-8. Temporary Guardrail.
D10200A3 102-73, 2102-73
MAINTENANCE OF TRAFFIC-CROSSING INTERSECTIONS.
(REV 5-14-01) (FA 5-21-01) (1-02)

SUBARTICLE 102-2.3 (Pages 106) is expanded as follows:
D10200E1 102-73, 2102-73
(REV 2-15-99) (FA 3-16-99) (7-00)

102-8. Temporary Guardrail.
D10200A3 102-73, 2102-73
102-8.   Warning and Channelization Devices. (REV 3-17-94) (7-02) D10200B4 102-74, 2102-74
102-8.   Advance Warning Arrow Panel. (REV 3-17-94) (7-02) D10200A6 102-76, 2102-76
102-8.   High Intensity Warning Lights. (REV 3-17-94) (7-02) D10200A7 102-77, 2102-77
102-8.   Temporary Vehicular Impact Attenuator (Inertia). (REV 3-28-96) (FA 4-16-96) (7-02) D1020A81 102-81-1, 2102-81-1
102-8.   Temporary Vehicular Impact Attenuator. (REV 4-26-96) (FA 5-29-96) (7-02) D1020089 102-89, 2102-89
102-8.   Barricade (To Remain). (REV 3-17-94) (7-02) D1020A98 102-98, 2102-98
102-8.   Variable Message Sign. (REV 3-17-94) (7-00) D1020A25 102-99, 2102-99
102-8.   Portable Regulatory Signs. (REV 12-11-00) (FA 6-20-01) (1-02) D1020A10 900-102-1, 2900-102-1
102-8.   Radar Speed Display Unit. (REV 12-11-00) (FA 6-20-01) (1-02) D1020A12 900-102-2, 2900-102-2
Safety Warning Transmitter. (REV 12-11-00) (FA 6-20-01) (1-02) D1020A13 900-102-3, 2900-102-3
102-8.   Temporary Traffic Control Signals. (REV 3-17-94) (7-02) D102A104 102-104, 2102-104
<102-8.   Temporary Traffic Detection Technology. (REV 5-14-01) (FA 5-25-01) (7-02)< D102A107 102-107, 2102-107
ENGINEER’S FIELD OFFICE.
(REV 12-10-96) (FA 12-17-96) (7-02)

PAGE 125. The following new Section is added after Section 104:
D1090000 109-71; 2109-71
REMOVAL OF EXISTING BULKHEAD.
(REV 7-10-95) (FA 6-21-99) (7-00)

ARTICLE 110-1 (of the Supplemental Specifications) is expanded by the following:
D1100073 110-73; 2110-73
REMOVAL AND DISPOSAL OF FENDER SYSTEM.
(REV 3-18-94) (FA 6-21-99) (7-00)

SUBARTICLE 110-6.1 (of the Supplemental Specifications) is expanded by the following:
D1100001 110-71-1; 2110-71-1. Modify to suit
MATERIAL FOR REEF ESTABLISHMENT.
(REV 7-10-95) (FA 6-21-99) (7-00)

SUBARTICLE 110-11.2 (of the Supplemental Specifications) is expanded by the following:
D1100113 110-84; 2110-84
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION.
(REV 1-3-94) (FA 6-21-99) (7-00)

ARTICLE 120-1 (of the Supplemental Specifications) is expanded by the following:
D1200003 Use when contaminated areas are delineated in the plans
FILL GRAVEL.
(REV 3-11-96) (7-00)

ARTICLE 120-1 (of the Supplemental Specifications) is expanded by the following:
D1200123 120-72; 2120-72; plan details required
FILL SAND.
(REV 1-3-94) (7-00)

PAGE 160. The following new Section is added after Section 125:
D1420000 142-70; 2142-70; (Plans to cover Material and Placement)
STABILIZED SUBBASE UNDER CONCRETE PAVEMENT.
(REV 1-3-94) (7-00)

ARTICLE 160-3 (of the Supplemental Specifications) is expanded by the following:
D1600003 Only when called for
ORGANIC SOIL LAYER.
(REV 1-19-00) (FA 1-25-00) (7-00)

PAGE 171. The following new Section is added after Section 162:
D162A0000 162-4; 2162-4
BLANKET MATERIAL.
(REV 10-22-99) (FA 1-20-00) (7-00)

PAGE 171. The following new Section is added after Section 162:
D16300000 163-1; 2163-1
STABILIZED SUBBASE.
(REV 1-3-94) (7-00)

PAGE 180. The following new Section is added after Section 175:
D1800000 180-70; 2180-70
 180-71; 2180-71
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-01)

ARTICLE 327-1 (of the Supplemental Specifications). The third paragraph is deleted and the following substituted:

Insert # ________
D3270001 When the plans provide a location for stockpiling milled material. Insert quantity to be retained. Use all, tons, metric tons, cubic yards or cubic meters 
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 12-1-93) (7-00)

ARTICLE 327-2 (of the Supplemental Specifications) is expanded by the following:
D3270004 Use when requested by districts
SURFACE REQUIREMENTS.
(REV 4-29-98) (FA 5-26-98) (7-02)

ARTICLE 330-12 (of the Supplemental Specifications) is expanded by the following new Subarticle:
D3300012 For rural projects when called for by District Construction

USE OF RECLAIMED ASPHALT PAVEMENT (RAP) MATERIAL.

(REV 2-5-02) (7-02)


SUBARTICLE 334-2.5.1 (of the Supplemental Specifications). Note 3 is deleted and the following substituted:

D3340251 When PG 76-22 Asphalt Binder is called for
PATCHING PORTLAND CEMENT CONCRETE PAVEMENT.
(REV 2-7-94) (7-00)

PAGE 373. The following new Section is added after 352.
D3540001 354-70; 2354-70 (requires D3530000 also)
COMPOSITE PANEL SUPPORT REPAIR.
(REV 12-10-93) (7-00)

SECTION 400 (of the Supplemental Specifications) is expanded by the following:
D4000003 400-128; 2400-128
PRECAST BULKHEAD PANELS.
(REV 7-10-95) (7-00)

SUBARTICLE 400-22.1 (of the Supplemental Specifications) is expanded by the following:
D4000217 400-72; 2400-72 (requires plan details)
REPLACE GRATES.
(REV 2-3-94) (7-00)

ARTICLE 425-1 (Page 386) is expanded by the following:
D4250010 425-82; 2425-82 
(requires plan details)
DESILTING PIPE.
(REV 6-13-95) (FA 6-21-95) (7-00)

SECTION 430 (of the Supplemental Specifications)  is expanded by the following:
D4300094 430-94; 2430-94 
DESILTING CONCRETE BOX CULVERTS.
(REV 11-9-93) (7-03)

SECTION 430 (of the Supplemental Specifications)  is expanded by the following:
D4300013 430-950; 2430-950 
DEEP DRAINAGE WELLS.
(REV 11-9-93) (7-00)

PAGE 459. The following new Section is added after Section 443:
D4440000 444-70; 2444-70
444-71; 2444-71

PRECAST PRESTRESSED CONCRETE CONSTRUCTION.

(REV 12-20-01) (7-02)


SECTION 450 (Pages 462-508) is deleted and the following substituted:

D4500000 Prestressed Jobs
INTEGRAL PILE JACKETS.
(REV 9-12-94) (7-00)

PAGE 598. The following new Section is added after Section 455:
D4570001 457-70; 2457-70

POST-TENSIONING.

(REV 6-27-01) (FA 7-9-01) (1-02)


PAGE 620. The following new Section is added after Section 460:

DB460000 Post Tensioning Jobs
BARRIER WALL REMOVAL (CONCRETE).
(REV 7-10-95) (7-00)

ARTICLE 521-1 (of the Supplemental Specifications) is expanded by the following: Prestressed Jobs
D5210073 521-73; 2521-73 (plan details required)
COLORING CONCRETE SURFACES.
(REV 4-1-99) (7-00)

PAGE 654. The following new Section is added after Section 522:
D5230000 523-70; 2523-70

NOISE BARRIER WALL.

(REV 12-31-96) (7-00)


SECTION 534 (Pages 662-666) is expanded by the following:

D5340001 534-72
2534-72
OPAQUE VISUAL BARRIER.
(REV 4-13-94) (7-00)

PAGE 672. The following new Section is added after Section 538:
D5390000 539-80; 2539-80 (requires plan details)
FENCING.
(REV 1-6-98) (7-02)

ARTICLE 550-2 (Page 681). The text is deleted and the following substituted:
D5500021 Type A fencing on non-NHS Projects only

DIRECTIONAL BORE.

(REV 2-3-00) (7-02)
PAGE 686. The following new Section is added after Section 550.

D5550000 555-1
2555-1
COAL TAR-EPOXY COATING OF PERMANENT BULKHEAD SHEET PILES.
(REV 1-3-94) (FA 6-21-99) (7-00)

ARTICLE 560-11 (Pages 691 and 692) is expanded to the following new Subarticle:
D5600115 Only when called for 
GRASSING (BY SEEDING)-WATERING.
(REV 3-10-00) (1-01)

ARTICLE 570-3.6 (Page 700) is deleted and the following substituted: 
D5700036 Seeding Jobs
PLASTIC EROSION MAT.
(REV 1-5-00) (FA 1-12-00) (7-02)

Page 702.The following new Section is added after Section 570:
D5710000 571-1; 2571-1

SUBMITTAL DATA REQUIREMENTS.

(REV 1-8-02) (7-02)


ARTICLE 603-7 (Page 715). The first paragraph is deleted and the following substituted:

D6030007 Jobs with Signals
PAINTING TRAFFIC STRIPES.
(REV 7-25-01) (1-02)

SUBARTICLE 710-4.1 (Page 780) is expanded by the following:
D7100041 Jobs with Traffic Paint

JACK & BORE.

(REV 2-3-00) (7-02)


PAGE 797. The following new Section is added after Section 715.

D7300000 730-76
2730-76
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II).
(REV 6-16-99) (FA 7-20-99) (7-02)

PAGE 797. The following new Section is added after Section 715:
D7410000 741-70;  2741-70
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT.
(REV 6-16-99) (FA 7-20-99) (7-02)

PAGE 797. The following new Section is added after Section 715:
D7430000 743-70; 2743-70
TRAFFIC MONITORING SITE SOLAR POWER UNIT.
(REV 6-16-99) (FA 7-20-99) (7-02)

PAGE 797. The following new Section is added after Section 715:
D7440000 744-70; 744-70 
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY.
(REV 10-25-01) (FA 12-21-01) (7-02)

PAGE 797. The following new Section is added after Section 715:
D7450000 745-70; 2745-70 (use with D6600062)
TRAFFIC MONITORING SITE CABINET.
(REV 6-21-99) (FA 7-20-99) (7-02)

PAGE 797. The following new Section is added after Section 715:
D7460000 746-7;  2746-7
TRAFFIC MONITORING SITE MODEM.
(REV 5-20-99) (FA 7-20-99) (7-00)

PAGE 797. The following new Section is added after Section 715:
D7470000 747; 2747 Items
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE EQUIPMENT AND MATERIALS.
(REV 5-12-99) (FA 7-20-99) (7-00)

PAGE 797. The following new Section is added after Section 715:
D7480000 Jobs with Traffic Monitoring Sites

POST-TENSIONING GROUT.

(REV 7-30-01) (7-02)


PAGE 875. The following new Section is added after Section 937.

D9380000 Post Tensioning Jobs and Jobs with cylinder piles

TIMBER TREATMENT (INCLUDING TREATING MATERIALS).

(REV 1-11-02) (7-02)


SECTION 955 (Pages 898-900) is deleted and the following substituted:

D9550000 All Jobs
TRANSPORTATION ENHANCEMENT PROJECTS.
(REV 8-6-96) (FA 12-10-96) (7-00)

SUBARTICLE 120-9.2 (of the Supplemental Specifications) is expanded by the following:
DENHANCE For non-vehicular enhancement projects only
TRAINING SPECIAL PROVISION.

(REV 1-25-02) (FA 2-5-02) (7-02)

Section 7 of the Appendix entitled “Specific Equal Employment Opportunity Responsibilities” attached to this Specifications Package is expanded as follows:

DTRAINSP All Jobs
 
Supplemental Specifications SS0000001 All Jobs
MANDATORY REVISION

DELETE THIS SUPPLEMENTAL SPECIFICATION

002       PROPOSAL REQUIREMENTS AND CONDITIONS.

(REV 7-27-00) (FA 8-3-00) (1-01)

SECTION 2 (Pages 10-15) is deleted and the following substituted:

D0020000 All Jobs
MANDATORY REVISION

ADD THIS SUPPLEMENTAL SPECIFICATION

002       CONTRACTOR’S RESPONSIBILITY FOR WORK.

(REV 2-13-02) (7-02)


ARTICLE 7-14 (Page 68) is deleted and the following substituted:

D0020000 All Class I Projects 
003        AWARD AND EXECUTION OF CONTRACT.
(REV 7-27-00) (FA 8-3-00) (1-01)

SECTION 3 (Pages 15-18) is deleted and the following substituted:
D0030000 All Jobs
004        ALTERATION OF PLANS OR OF CHARACTER OF WORK.
(REV 1-10-00) (FA 1-12-00) (7-02)

ARTICLE 4-3 (Pages 18-25) is deleted and the following substituted:
D0040003 All Jobs

005       CONTROL OF THE WORK.

(REV 2-28-00) (FA 5-9-00) (1-01)


SUBARTICLE 5-8.4 (Pages 39 and 40) is deleted.

D0050084 All Jobs

005       CONTRACTOR’S QUALITY CONTROL MANAGER.

(REV 12-18-01) (FA 1-3-02) (7-02)


ARTICLE 5-8 (Pages 38-40) is expanded by the following new Subarticle:

D0050085 All Jobs

005       CLAIMS BY CONTRACTOR.

(REV 1-10-00) (FA 1-12-00) (2-00)


ARTICLE 5-12 (Pages 41-48) is deleted and the following substituted:

D0050012 All Jobs

006       SOURCE OF SUPPLY AND QUALITY REQUIREMENTS.

(REV 10-16-00) (FA 11-17-00) (7-01)


SUBARTICLE 6-3.2 (Page 50) is expanded by the following new Subarticle:

D0060032 All Jobs

006       MATERIALS ACCEPTED BASED ON MANUFACTURER’S CERTIFICATION.

(REV 2-1-00) (FA 7-10-01) (7-02)


ARTICLE 6-5 (Pages 52 and 53) is expanded as follows:

D0060005 All Jobs

006       CONTROL OF MATERIALS.

(REV 9-4-01) (FA 1-3-02) (7-02)


ARTICLE 6-7 (Page 54) is deleted and the following substituted:

D0060067 All Jobs

006       QUALITY CONTROL PROGRAM.

(REV 12-19-01) (FA 1-3-02) (7-02)

SECTION 6 (Pages 49-54) is expanded by the addition of the following new Articles:

D0060008 All Jobs

007       LAWS TO BE OBSERVED.

(REV 10-5-99) (FA 10-8-99) (7-00)


ARTICLE 7-1 (Pages 54-57) is expanded by the following new Subarticle:

D0070017 All Jobs

007       TRAFFIC SIGNS, SIGNAL EQUIPMENT, HIGHWAY LIGHTING AND GUARDRAIL.

(REV 10-31-00) (FA 12-19-01) (7-02)


SUBARTICLE 7-11.4 (Page 63). The third paragraph is deleted and the following substituted:

D0070114 All Jobs

007       RESPONSIBILITY FOR DAMAGES, CLAIMS, ETC.

(REV 1-31-01) (FA 4-11-01) (2-01)


ARTICLE 7-12 (Pages 66 and 67) is deleted and the following substituted:

D0070012 All Jobs
007       WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 8-27-99) (FA 11-16-99) (7-00)

ARTICLE 7-16 (Page 69). The text is deleted and the following substituted:
D0070016 All Federal Aid Jobs
007       SUBMITTAL OF WAGE RATE SUMMARY.
(REV 11-28-00) (FA 2-5-01) (7-02)

ARTICLE 7-23 (Page 71). The text is deleted and the following substituted:
D0070023 All Jobs

008       LIMITATIONS OF OPERATIONS - NIGHT WORK.

(REV 7-23-01) (FA 8-3-01) (7-02)


SUBARTICLE 8-4.1 (Pages 74 and 75). The eighth paragraph is deleted and the following substituted:

D0080041 All Jobs

008       QUALIFICATIONS OF CONTRACTOR’S PERSONNEL.

(REV 12-24-01) (FA 1-7-02) (7-02)

 

ARTICLE 8-5 (Pages 76 and 77) is deleted and the following substituted:

D0080005 All Jobs

008       TEMPORARY SUSPENSION OF CONTRACTOR’S OPERATIONS.

(REV 11-2-99) (FA 11-12-99) (7-00)


ARTICLE 8-6 (Pages 77 and 78) is deleted and the following substituted:

D0080006 All Jobs

008       PROSECUTION AND PROGRESS -ADJUSTING CONTRACT TIME.

(REV 4-3-01) (FA 5-8-01) (1-02)
ARTICLE 8-7.3 (Pages 78-80) is deleted and the following substituted:

D0080073 All Jobs

008       DEFAULT AND TERMINATION OF CONTRACT.

(REV 4-24-00) (FA 6-1-00) (1-01)
ARTICLE 8-9 (Pages 81-83) is deleted and the following substituted:

D0080091 All Jobs

008       AMOUNT OF LIQUIDATED DAMAGES.

(REV 3-15-01) (FA 6-14-01) (1-02)
SUBARTICLE 8-10.2 (Page 83) is deleted and the following substituted:

D0080102 All Jobs

009       MEASUREMENT AND PAYMENT.

(REV 11-16-00) (FA 2-1-01) (7-01)
SUBARTICLE 9-1.5 (Pages 85-86) is deleted and the following substituted:

D0090015 All Jobs

009       SCOPE OF PAYMENTS.

(REV 10-26-00) (FA 11-17-00) (1-02)
ARTICLE 9-2 (Pages 86-89) is deleted and the following substituted:

D0090002 All Jobs

009       COMMON CARRIER FREIGHT RATES.

(REV 8-9-00) (FA 11-17-00) (7-01)
ARTICLE 9-4 (Pages 91-95) is deleted.

D0090004 All Jobs Do not use with D00900DC

009       PARTIAL PAYMENTS.

(REV 11-22-00) (FA 2-7-01) (7-01)
ARTICLE 9-6 (Pages 95-99) is deleted and the following substituted:

D0090006 All Jobs
009       RECORD OF CONSTRUCTION MATERIALS.
(REV 1-11-01) (FA 2-5-01) (7-01)

ARTICLE 9-7 (Pages 99 and 100) is deleted and the following substituted:
D0090007 All Jobs

009       ACCEPTANCE AND FINAL PAYMENT.

(REV 5-13-99) (FA 12-3-99) (7-00)
ARTICLE 9-9 (Pages 100 and 101) is deleted and the following substituted:

D0090009 All Jobs
100      CONSTRUCTION EQUIPMENT-GENERAL REQUIREMENTS.
(REV 12-14-01) (FA 11-4-02) (7-02)

SECTION 100 (Pages 102 and 103) is deleted and the following substituted:
D1000000 All Jobs

102      MAINTENANCE OF TRAFFIC.

(REV 4-11-00) (FA 5-1-00) (1-01)
SUBARTICLE 102-1.4 (Page 105) is deleted and the following substituted:

D1020014 All Jobs

102      TRAFFIC CONTROL - MOT DEVICES.

(REV 5-21-01) (FA 10-25-01) (7-02)
SUBARTICLE 102-3.2 (Pages 107 and 108) is expanded as follows:

D1020326 All Jobs

102      TRAFFIC CONTROL - USE OF ORANGE VESTS.

(REV 1-6-98) (FA 2-2-98) (7-00)
ARTICLE 102-3 (Pages 106-111) is expanded by the following new Subarticle:

D1020327 All Jobs

102       WORK ZONE SIGNS.

(REV 12-11-97) (FA 1-6-98) (7-02)
ARTICLE 102-3 (Pages 106-111) is expanded by the following new Subarticle:

D1020060 All Jobs

(Also use D10200A5)

102       MAINTENANCE OF TRAFFIC - DETOURS.

(REV 2-12-01) (FA 6-14-01) (1-02)
SUBARTICLE 102-4.2 (Pages 111-112). The following text is inserted after the third paragraph:

D1020042 Jobs with Detour Bridges

102       TRUCK MOUNTED ATTENUATORS.

(REV 4-27-00) (FA 11-17-00) (7-02)
SUBARTICLE 102-7.1 (Page 114) is expanded by the following:

D1020071 All Jobs
104       CONSTRUCTION REQUIREMENTS-ARTIFICIAL COVERINGS.
(REV 5-8-00) (FA 5-15-00) (1-01)

ARTICLE 104-6 (Pages 119-123) is expanded by the following new Subarticle:
D1040006 104-1; 2104-1 
104       BALED HAY OR STRAW.
(REV 5-10-01) (FA 11-9-01) (7-02)

SUBARTICLE 104-6.4.9 (Page 121) The text is deleted and the following substituted:
D1040649 All Jobs
105       QUALITY CONTROL PLAN.
(REV 12-19-01) (FA 1-4-02) (7-02)

PAGE 125. The following new Section is added after Section 104:
D1050000 All Jobs
110      CLEARING AND GRUBBING.
(REV 6-29-01) (FA 1-4-02) (7-02)

SECTION 110 (Pages 126-134) is deleted and the following substituted:
D1100000 110; 2110 Items 

120       EXCAVATION AND EMBANKMENT.

(REV 12-19-01) (FA 1-9-02) (7-02)


SECTION 120 (Pages 135-150) is deleted and the following substituted:

D1200000 All Jobs
121      FLOWABLE FILL.
(REV 12-20-01) (FA 1-7-02) (7-02)

SECTION 121 (Pages 150-152) is deleted and the following substituted:
D1210000 All Jobs

125       EXCAVATION FOR STRUCTURES AND PIPE.

(REV 2-5-02) (FA 2-5-02) (7-02)
SECTION 125 (Pages 152-160) is deleted and the following substituted:

D1250000 125; 2125 Items
145     GEOSYNTHETIC REINFORCEMENT.
(REV 11-1-99) (FA 11-4-99) (7-00)

PAGE 160. The following new Section is added after Section 125:
D1450000 145; 2145 Items 
160      STABILIZING.
(REV 10-17-01) (FA 1-10-02) (7-02)

SECTION 160 (Pages 160-165) is deleted and the following substituted:
D1600000 160; 2160 Items 
200      ROCK BASE.
(REV 2-5-03) (FA 2-11-03) (7-03)

SECTION 200 (Pages 181-184) is deleted and the following substituted:
D2000000 285; 2285 Items 
204     GRADE AGGREGATE BASE.
(REV 10-31-01) (FA 1-3-02) (7-02)

ARTICLE 204-6 (Page 186) is deleted and the following substituted:
D2040000 285-7xx; 2285-7xx 

210     REWORKING LIMEROCK BASE.

(REV 10-31-01) (FA 1-3-02) (7-02)
ARTICLE 210-3 (Page 187) is deleted and the following substituted:

D2100000 210-1; 2210-1; 210-2; 2210-2

234     SUPERPAVE ASPHALT BASE.

(REV 12-19-01) (FA 1-4-02) (7-02)
PAGE 192. The following new Section is added after Section 230.

D2340000 285-7xx; 2285-7xx 
240     SAND-CLAY BASE.
(REV 10-31-01) (FA 1-3-02) (7-02)

ARTICLE 240-5 (Page 194) is deleted and the following substituted:
D2400000 285-7xx; 2285-7xx 
280      ASPHALT BASE COURSES.
(REV 12-19-01) (FA 1-4-02) (7-02)

SECTION 280 (Page 207-209) is deleted and the following substituted:
D2800000 285-7xx; 2285-7xx 
283      RECLAIMED ASPHALT PAVEMENT BASE.
(REV 1-7-01) (FA 1-3-02) (7-02)

SECTION 283 (Pages 209-211) is deleted and the following substituted:
D2830000 285-7xx; 2285-7xx 
285      OPTIONAL BASE COURSE.
(REV 10-31-01) (FA 1-4-02) (7-02)

SECTION 285 (Pages 211-213) is deleted and the following substituted:
D2850000 285-7xx; 2285-7xx 
286      TURNOUT CONSTRUCTION-METHOD OF MEASUREMENT.
(REV 6-20-00) (FA 9-13-00) (7-01)

ARTICLE 286-5 (Page 214) is deleted and the following substituted
D2860005 286; 2286 Items 
288      CEMENT TREATED PERMEABLE BASE.
(REV 11-5-01) (FA 1-3-02) (7-02)

PAGE 215. The following new Section is added after Section 286:
D2880000 288; 2288 Items

300       PRIME AND TACK COATS FOR BASE COURSES.

(REV 12-19-01) (FA 1-4-02) (7-02)


SECTION 300 (Pages 217-221) is deleted and the following substituted:

D3000000 Jobs with Asphalt
320        HOT BITUMINOUS MIXTURES-PLANT, METHODS, AND EQUIPMENT.
(REV 12-19-01) (FA 1-4-02) (7-02)

SECTION 320 (Pages 233-241) is deleted and the following substituted:
D3200000 Jobs with Asphalt
327        MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 12-19-01) (FA 1-4-02) (7-02)

SECTION 327 (Pages 241-243) is deleted and the following substituted:
D3270000 327-70; 2327-70

330       HOT BITUMINOUS MIXTURES - GENERAL CONSTRUCTION REQUIREMENTS.

(REV 1-17-02) (FA 2-5-02) (7-02)


SECTION 330 (Pages 244-266) is deleted and the following substituted:

D3300000 Jobs with Asphalt
331       TYPE S ASPHALT CONCRETE, QUALITY ASSURANCE AND ACCEPTANCE PROCEDURES.
(REV 9-26-01) (FA 1-4-02) (7-02)

SECTION 331 (Pages 266-279) is deleted and the following substituted:
D3310000 331-2; 2331-2
332        TYPE II ASPHALTIC CONCRETE.
(REV 9-26-01) (FA 1-3-02) (7-02)

SECTION 332 (Pages 279-281) is deleted and the following substituted:
D3320000 332-2; 2332-2
333        TYPE III ASPHALTIC CONCRETE.
(REV 9-26-01) (FA 1-3-02) (7-02)

SECTION 331 (Pages 281-283) is deleted and the following substituted:
D3330000 333-2; 2333-2

334       SUPERPAVE ASPHALT CONCRETE.

(REV 12-20-01) (FA 1-9-02) (7-02)

SECTION 334 (Pages 283-304) is deleted and the following substituted:

D3340000 Asphalt Jobs
335        SAND-ASPHALT HOT MIX.
(REV 9-27-01) (FA 1-3-02) (7-02)

SECTION 335 (Pages 304-306) is deleted and the following substituted:
D3350000 335-2; 2335-2
336        ASPHALT RUBBER BINDER.
(REV 9-27-01) (FA 1-4-02) (7-02)

SECTION 336 (Pages 306-308) is deleted and the following substituted:
D3360000 334, 2334; 337, 2337; 341, 2341 Items
MANDATORY REVISION

DELETE THIS SUPPLEMENTAL SPECIFICATION

337       ASPHALT CONCRETE FRICTION COURSES.

(REV 12-20-01) (FA 1-4-02) (7-02)
SECTION 337 (Pages 309-317) is deleted and the following substituted:

D3370000 D3370000
337-7

2337-7

MANDATORY REVISION

ADD THIS SUPPLEMENTAL SPECIFICATION

337       ASPHALT CONCRETE FRICTION COURSES.

REV 5-6-02) (FA 1-4-02) (7-02)
SECTION 337 (Pages 309- 317) is deleted and the following substituted:

D3370000 337-7 Items
2337-7 Items

339       MISCELLANEOUS ASPHALT PAVEMENT.

(REV 9-27-01) (FA 1-3-02) (7-02)


SECTION 339 (Pages 317 and 318) is deleted and the following substituted:

D3390000 339-1, 2339-1

341       ASPHALT RUBBER MEMBRANE INTERLAYER.

(REV 12-20-01) (FA 1-4-02) (7-02)


SECTION 341 (Pages 319-321) is deleted and the following substituted:

D3410000 341, 2341 Items

346       PORTLAND CEMENT CONCRETE.

(REV 1-8-02) (FA 1-10-02) (7-02)


SECTION 346 (Pages 321-346) is deleted and the following substituted:

D3460000 Jobs with Concrete
347        PORTLAND CEMENT CONCRETE-CLASS I (NONSTRUCTURAL).
(REV 5-21-01) (FA 6-20-01) (1-02)

SECTION 347 (Pages 346-349) is deleted and the following substituted:
D3470000 Jobs with Nonstructural Concrete
353       CONCRETE PAVEMENT SLAB REPLACEMENT.
(REV 12-20-01) (FA 1-3-02) (7-02)

PAGE 373. The following Section is added after 352:
D3530000 353-70; 2353-70

400       CONCRETE STRUCTURES.

(REV 8-30-01) (FA 12-20-01) (7-02)


SECTION 400 (Pages 375-412) is deleted and the following substituted:

D4000000 Jobs with Concrete Structures 
413       SEALING CONCRETE STRUCTURE SURFACES.
(REV 8-23-01) (FA 12-20-01) (7-02)

SECTION 413 (Pages 420-423) is deleted and the following substituted:
D4130000 400-149, 2400-149; 400-154, 2400-154
415       REINFORCING STEEL.
(REV 4-2-01) (FA 5-11-01) (1-02)

SECTION 415 (Pages 423-429) is deleted and the following substituted:
D4150000 Jobs with Reinforcing Steel 
430       PIPE CULVERTS AND STORM SEWERS.
(REV 1-9-03) (FA 1-28-03) (7-03)

SECTION 430 (Pages 434-446) is deleted and the following substituted:
D4300000 430; 2430 Items
431       PIPE LINER.
(REV 9-21-00) (FA 1-19-01) (7-01)

SECTION 431 (Pages 446-448) is deleted and the following substituted:
D4310000 431; 2431 Items
440       UNDERDRAINS.
(REV 5-9-02) (FA 7-11-02) (1-03)

SECTION 440 (Pages 449-451) is deleted and the following substituted:
D4400000 440; 2440 Items

453       EPOXY JOINTING OF PRECAST SEGMENTS.

(REV 12-11-00) (FA 2-5-01) (2-01)


PAGE 524. The following new Section is added after Section 451.

D4530000 Precast Segmental Bridge Projects 

455      STRUCTURES FOUNDATIONS.

(REV 1-11-02) (FA 1-11-02) (7-02)


SECTION 455 (Pages 525-598) is deleted and the following substituted:

D4550000 Structure Foundations Jobs

460      STRUCTURAL STEEL AND MISCELLANEOUS METALS.

(REV 4-3-01) (FA 4-11-00) (7-01)

 

SUBARTICLE 460-2.1 (Page 600) is deleted and the following substituted:

D4600000 Jobs with Structural Steel 

460      STRUCTURAL STEEL AND MISCELLANEOUS METALS - FABRICATOR QUALIFICATIONS.

(REV 9-18-00) (FA 12-13-00) (7-01)

SUBARTICLE 460-2.3 (Page 601) is deleted and the following substituted:

D4600023 460-1, 2460-1
460-2, 2460-2

460      MARKING AND SHIPPING - GENERAL.

(REV 6-16-00) (FA 7-6-00) (1-01)


SUBARTICLE 460-27.1 (Pages 614 and 615) is deleted and the following substituted:

D4600271 460 Items
2460 Items

460      STRUCTURAL STEEL AND MISCELLANEOUS METALS - ALUMINUM RAILINGS.

(REV 5-7-01) (FA 10-23-01) (7-02)
SUBARTICLE 460-38.8 (Page 619) is deleted and the following substituted:

D4600038 460-70
2460-70

A460    MULTIROTATIONAL POT BEARINGS.

(REV 7-7-99) (FA 7-30-99) (7-00)
PAGE 620. The following new Section is added after Section 460:

DA460001 460-113, 2460-113
460-114, 2460-114
502       SHEAR CONNECTORS.
(REV 4-3-01) (FA 4-27-01) (7-01)

ARTICLE 502-1 (Page 627) is deleted and the following substituted:
D5020000 Jobs with Structural Steel
521       CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS.
(REV 7-27-00) (FA 8-1-00) (1-01)

SECTION 521 (Pages 650-653) is deleted and the following substituted:
D5210000 521; 2521 Items 
522       CONCRETE SIDEWALK-METHOD OF MEASUREMENT.
(REV 5-24-00) (FA 9-26-00) (1-01)

ARTICLE 522-9 (Page 654) is deleted and the following substituted: 
D5220009 522; 2522 Items 

524       CONCRETE DITCH AND SLOPE PAVEMENT - METHOD OF MEASUREMENT.

(REV 6-23-00) (FA 9-7-00) (7-01)


ARTICLE 524-9 (Page 656) is deleted and the following substituted:

D5240009 524; 2524 Items 
526       ARCHITECTURAL PAVERS.
(REV 4-23-98) (FA 5-26-98) (1-01)

Page 657. The following new Section is added after Section 525: 
D5260000 526-1; 2526-1 
530      RIPRAP.
(REV 10-15-01) (FA 1-3-02) (7-02)

SECTION 530 (Pages 657-662) is deleted and the following substituted:
D5300000 530; 2530 Items 
536     GUARDRAIL-CERTIFICATION.
(REV 5-2-01) (FA 6-14-01) (7-02)

ARTICLE 536-2 (Pages 666-668) is expanded by the following: 
D5360002 536; 2536 Items 
550     FENCING-CERTIFICATION.
(REV 5-2-01) (FA 6-14-01) (7-02)

ARTICLE 550-3 (Page 682) is expanded by the following: 
D5500003 550; 2550 Items 
563     ANTI-GRAFFITI COATING  SYSTEM.
(REV 8-15-00) (FA 9-7-00) (7-01)

SECTION 563 (Pages 697-699) is deleted and the following substituted: 
D5630000 563; 2563 Items 
575     SODDING-WATERING.
(REV 3-10-00) (FA 4-5-00) (1-01)

SUBARTICLE 575-3.3 (Pages 703 and 704) is deleted and the following substituted:
D5750033 Sodding Jobs 
580      LANDSCAPING INSTALLATION-PLANTS.
(REV 12-6-99) (FA 12-23-99) (7-00)

SUBARTICLE 580-2.1.2 (Pages 707 and 708) is deleted and the following substituted:
D5800002 Landscaping Jobs
611      ACCEPTANCE OF SIGNAL INSTALLATIONS.
(REV 12-15-01) (FA 2-1-01) (7-02)

ARTICLE 611-2 (Page 717) is expanded as follows:
D6110002 Jobs with Signal 
620      SIGNAL INSTALLATION GROUNDING.
(REV 7-12-01) (FA 1-3-02) (1-02)

SECTION 620 (Pages 721-724) is deleted and the following substituted:
D6200000 All Jobs 
632      SIGNAL AND INTERCONNECT CABLE.
(REV 7-25-00) (FA 8-3-00) (7-02)

SECTION 632 (Pages 728-730) is deleted and the following substituted:
D6320000 632; 2632 Items 
641      PRESTRESSED CONCRETE POLES.
(REV 3-7-00) (FA 5-8-00) (1-01)

SECTION 641 (Pages 739 and-740) is deleted and the following substituted:
D6410000 641; 2641 Items 
649       STEEL STRAIN POLES, STEEL MAST ARM AND MONOTUBE ASSEMBLIES.
(REV 1-7-02) (FA 1-10-02) (7-02)

PAGE 740. The following new Section is added after Section 641.
D6490000 649; 2649 Items 
650       VEHICULAR SIGNAL ASSEMBLIES-METHOD OF MEASUREMENT.
(REV 10-3-00) (FA 1-10-01) (7-01)

ARTICLE 650-4 (Page 742) is expanded as follows:
D6500004 650-5; 2650-5 

660       INDUCTIVE LOOP DETECTORS.

(REV 7-12-01) (FA 12-19-01) (7-02)


ARTICLE 660-2 (Pages 746-747) is deleted and the following substituted:>

D6600062 660; 2660 Items 
690       REMOVAL OF EXISTING TRAFFIC SIGNAL EQUIPMENT.
(REV 5-3-01) (FA 5-15-01) (1-02)

SECTION 690 (Pages 754-757) is deleted and the following substituted:
D6900000 690; 2690 Items 
699       INTERNALLY ILLUMINATED SIGNS.
(REV 6-23-01) (FA 8-23-01) (7-02)

PAGE 757. The following new Section is added after Section 690.
D6990000 699-1; 2699-1

700       SIGN BACKGROUND.

(REV 5-15-00) (FA 6-20-00) (1-01)


SUBARTICLE 700-2.5 (Page 762) is deleted and the following substituted:

D7000002 All Jobs
700       HIGHWAY SIGNING - STENCILING.

(REV 12-12-00) (FA 8-3-01) (7-02)
 

SUBARTICLE 700-5.5 (Page 765) is deleted and the following substituted:

D7000055 All Jobs
701       RAISED RIB SHOULDER WARNING DEVICES.
(REV 8-27-01) (FA 11-9-01) (7-02)

SUBARTICLE 701-4.1 (Pages 769 and 770) is expanded by  the following:
D7010041 701; 2701 Items
702       INVERTED PROFILE, WET WEATHER TRAFFIC STRIPES.
(REV 8-27-01) (FA 10-5-01) (7-02)

PAGE 772. The following new Section is added after Section 701.
D7020000 702; 2702 Items
704       CERAMIC PAVEMENT MARKERS.
(REV 12-17-93) (FA 8-4-98) (7-00)

PAGE 772. The following new Section is added after Section 701. 
D7040000 704; 2704 Items

705       HIGHWAY DELINEATORS

(REV 5-5-00) (FA 6-16-00) (1-01)


SUBARTICLE 705-2.5 (Page 772) is deleted and the following substituted:

D7050025 705; 2705 Items
709       TRAFFIC STRIPES AND MARKINGS-TWO REACTIVE COMPONENTS.
(REV 8-27-01) (FA 12-19-01) (7-02)

SUBARTICLE 709-4.1(Page 776) is expanded by the following:
D7090041 709, 2709 Items 
711       THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS.
(REV 8-27-01) (FA 10-25-01) (7-02)

SUBARTICLE 711-4.1(Page 785) is expanded by the following:
D7110041 711; 2711 Items 
713       PREFORMED PAVEMENT STRIPES AND MARKINGS.
(REV 9-17-01) (FA 12-19-01) (7-02)

SUBARTICLE 713-4.1(Page 789) is expanded by the following:
D7130041 When called for
714       MOTORIST AID CALL BOX RELOCATION.
(REV 11-30-00) (FA 2-2-01) (7-01)

PAGE 791. The following new Section is added after Section 713:
D7140000 714-1, 2714-1; 400-2, 2400-2 (requires plan details)
715       HIGHWAY LIGHTING SYSTEM.
(REV 11-14-01) (FA 12-19-01) (7-02)

SECTION 715 (Pages 791-797) is deleted and the following substituted:
D7150000 Highway Lighting Projects
901       COARSE AGGREGATE.
(REV 1-10-02) (FA 1-10-02) (7-02)

SECTION 901 (Pages 798-803) is deleted and the following substituted:
D9010000 All Jobs
902       FINE AGGREGATE.
(REV 8-23-01) (FA 1-10-02) (7-02)

SECTION 902 (Pages 804-807) is deleted and the following substituted:
D9020000 All Jobs
916       BITUMINOUS MATERIALS.
(REV 10-9-01) (FA 1-3-02) (7-02)

SECTION 916 (Pages 815-825) is deleted and the following substituted:
D9160000 Asphalt Jobs
919       GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER.
(REV 10-10-01) (FA 1-10-02) (7-02)

SECTION 919 (Pages 826-828) is deleted and the following substituted:
D9190000 Asphalt Jobs (use with pay items 337, 2337; 341 and 2341)
921       PORTLAND CEMENT AND BLENDED CEMENT.
(REV 1-9-02) (FA 1-10-02) (7-02)

SECTION 921 (Pages 829-832) is deleted and the following substituted:
D9210000 Jobs with Concrete
923       WATER FOR CONCRETE.
(REV 10-29-01) (FA 12-20-01) (7-02)

SECTION 923 (Page 832) is deleted and the following substituted:
D9230000 Jobs with Concrete
924       ADMIXTURES WITH CONCRETE.
(REV 10-15-01) (FA 1-9-02) (7-02)

SECTION 924 (Pages 833-835) is deleted and the following substituted:
D9240000 Jobs with Admixtures for Concrete
925       CURING MATERIALS FOR CONCRETE.
(REV 9-28-01) (FA 1-10-02) (7-02)

SECTION 925 (Pages 836 and 837) is deleted and the following substituted:
D9250000 Jobs with Concrete

926       EPOXY COMPOUNDS - CERTIFICATION.

(REV 7-1-01) (FA 8-3-01) (7-02)


ARTICLE 926-2 (Page 838) is deleted and the following substituted:

D9260002 All Jobs
929       POZZOLANS AND SLAG.
(REV 9-28-01) (FA 2-5-02) (7-02)

SECTION 929 (Pages 845-847) is deleted and the following substituted:
D9290000 Jobs with Concrete

930         PACKAGED, DRY, RAPID HARDENED AND VERY RAPID HARDENED CONCRETE OR MORTAR MATERIALS        FOR CONCRETE REPAIR.

(REV 11-30-01) (FA 1-10-02) (7-02)


SECTION 930 (Pages 847-852) is deleted and the following substituted:

D9300000 Jobs with Concrete
931       METAL ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES-CERTIFICATION.
(REV 11-27-00) (FA 3-20-01) (1-02)

SUBARTICLE 931-2.1 (Pages 853 and 854) is expanded as follows:
D9310002 All Jobs

932       NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES.

(REV 3-27-01) (FA 4-16-01) (7-02)


SECTION 932 (Pages 855-866) is deleted and the following substituted:

D9320000 All Jobs
934       NON-SHRINK GROUT.
(REV 12-20-01) (FA 1-3-02) (7-02)

SECTION 934 (Pages 869 and 870) is deleted and the following substituted:
D9340000 When non-shrink grout is called for
937       ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS.
(REV 4-30-02) (FA 7-25-02) (1-03)

SECTION 937 (Pages 873-875) is deleted and the following substituted:
D9370000 All Job

941       CONCRETE CULVERT PIPE (ROUND).

(REV 12-19-00) (FA 2-2-01) (7-02)


SUBARTICLE 941-1.1 (Page 876) is deleted and the following substituted:

D9410001 430; 2430 Items 
943       CORRUGATED STEEL PIPE AND PIPE ARCH (INCLUDING UNDERDRAIN).
(REV 11-21-00) (FA 1-17-01) (7-01)

ARTICLE 943-1 (Page 882) is deleted and the following substituted:
D9430001 430; 2430 Items 
945        ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS.
(REV 11-21-00) (FA 1-10-01) (7-01)

ARTICLE 945-1 (Page 887) The first paragraph is deleted and the following substituted:
D9450001 430; 2430 Items 
948       MISCELLANEOUS TYPE OF PIPE.
(REV 4-23-01) (FA 6-14-01) (7-02)

SUBARTICLE 948-1.7 (Page 892) is deleted and the following substituted: 
D9480001 430; 2430 Items 
948       PIPE LINER MATERIALS.
(REV 9-21-00) (FA 1-17-01) (7-01)

SECTION 948 (Pages 891-893) is expanded by the following:
D9480004 431; 2431 Items 
951       INSPECTION OF TIMBER PRODUCTS.
(REV 11-13-01) (FA 1-3-02) (7-02)

ARTICLE 951-1 (Pages 894) is deleted and the following substituted:
D9510001 All Jobs 

970       RAISED RETRO-REFLECTIVE PAVEMENT MARKERS - PERFORMANCE REQUIREMENTS.

(REV 8-23-00) (FA 10-27-00) (1-01)


SUBARTICLE 970-1.3 (Pages 911 and 912) is deleted and the following substituted:

D9700003 Jobs with Reflective Pavement Markers 

971       COATINGS AND TRAFFIC MARKING MATERIALS - CERTIFICATION.

(REV 12-27-00) (FA 8-3-01) (7-02)


SUBARTICLE 971-1.4 (Page 913) is deleted and the following substituted:

D9710015 All Jobs 
971       COATINGS AND TRAFFIC MARKING MATERIALS.
(REV 5-4-00) (FA 5-26-00) (7-01)

SECTION 971 (Pages 913-945) is expanded by the following:
D9710022 All Jobs 
982       COMMERCIAL FERTILIZER-CERTIFICATION.
(REV 11-27-00) (FA 3-28-01) (1-02)

SECTION 982 (Pages 951) is expanded as  follows:
D9820002 All Jobs 
985       GEOTEXTILE FABRICS.
(REV 10-20-99) (FA 12-21-99) (7-02)

SECTION 985 (Pages 951 and 952) is deleted and the following substituted:
D9850000 All Jobs 
986       CALCIUM CHLORIDE FOR DUST CONTROL-CERTIFICATION.
(REV 1-8-01) (FA 3-7-01) (1-02)

SECTION 986 (Pages 952 and 953) is expanded by the following:
D9860003 All Jobs 
992       HIGHWAY LIGHTING MATERIALS-CERTIFICATION.
(REV 5-3-02) (FA 5-16-02) (1-03)

ARTICLE 992-4 (Page 955) is expanded by the following Subarticles:
D9920041 All Jobs 
992       POLE CABLE DISTRIBUTION SYSTEM-WALL MOUNTED LIGHTING.
(REV 3-14-00) (FA 5-15-00) (1-01)

SUBARTICLE 992-12 (Pages 957-960) is expanded by the following new Subarticle:
D9920012 Lighting Jobs 

993       TYPE C DELINEATORS.

(REV 5-15-00) (FA 6-16-00) (1-01)


SUBARTICLE 993-2.1 (Page 963). The first sentence is deleted and the following substituted:

D9930021 705; 2705 Items 

993       REFLECTOR UNITS FOR GUARDRAIL - CERTIFICATION.

(REV 3-30-01) (FA 4-11-01) (1-02)


SUBARTICLE 993-5.4 (Page 964) is deleted and the following substituted:

D9930005 All Jobs 
994       RETROREFLECTIVE AND NONREFLECTIVE SIGN SHEETING.
(REV 7-6-00) (FA 7-25-00) (1-01)

SECTION 994 (Pages 964-973) is deleted and the following substituted:
D9940000 All Jobs 
995       DEMOUNTABLE SIGN FACE MATERIALS-CERTIFICATION.
(REV 11-27-00) (FA 3-7-01) (1-02)

ARTICLE 995-3 (Page 976) is deleted and the following substituted:
D9950003 All Jobs 
996       PORCELAIN ENAMEL LAMINATED ALUMINUM SIGN PANELS-CERTIFICATION.
(REV 1-8-01) (FA 3-28-01) (1-02)

SECTION 996 (Pages 976-980) is expanded by the following:
D9960006 All Jobs
APPENDICES DAPENDIC All Jobs

SPECIAL PROVISIONS FOR DISADVANTAGED BUSINESS ENTERPRISES
(REV 10-1-99) (FA 12-9-99) (7-00)

DMBE0001 All Jobs 
MANDATORY REVISION

ADD THIS APPENDIX

SPECIAL PROVISIONS FOR DISADVANTAGED BUSINESS ENTERPRISES
(REV 10-1-99) (FA 12-9-99) (7-00)

DMBE0001 All Jobs 

AFFIRMATIVE ACTION REQUIREMENTS.
(REV 4-10-96) (FA 6-25-96) (7-00)

DAFFIRM All Jobs 

SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES APPLICABLE TO CONSTRUCTION AND MAINTENANCE CONTRACTS
(REV 11-8-00) (7-01)

DEEORESP Non-Federal Aid Projects