Specifications and Estimates
Implemented Modifications to the 2000 Standard Specifications
July 2002 Workbook
for Lettings Effective July 2002 - December 2002
Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Change Table - Shows all changes made to the Specifications within this workbook.
Note: These files are in Adobe Acrobat (PDF) format.
File size ranges from 9 kb to 279 kb.
| SPECIAL PROVISIONS | SP0000001 | All Jobs |
|---|---|---|
| INTENT AND SCOPE. ARTICLE 4-1 (Page 19) is expanded by the following: The Improvements under this Contract consist of (Place description here).Insert # ________ The summary of pay items for this project is listed in the plans. |
D0040002 | All Jobs, except Lump Sum |
|
INTENT AND SCOPE. ARTICLE 4-1 (Page 18) is deleted and the following substituted: Insert # _________ |
D00401LS | All Lump Sum Projects |
|
(REV 8-22-96) (FA 9-3-96) (7-00) For this Contract, the Department will reject any bid in which the bidder submits proposed Contract time in excess of _________ calendar days. Insert # _________ |
D0040091 | 999-10' 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D00300AB, D008007A and D008007AB |
|
(REV 2-8-94) (7-00) It is anticipated that construction by others will be underway at each end and within this project during the life of this Contract. Coordinate construction operations with those of other Contractors as necessary. |
D0040010 | When other Contractors are working in the vicinity |
|
DEFINITIONS. (REV 12-30-94) (FA 5-26-95) (7-00) ARTICLE 1-3 (Pages 2-10). The definition of Controlling Work Items is deleted and the following substituted: |
D0010013 | CPM Jobs |
|
MANDATORY REVISION
DELETE THIS SPECIAL PROVISION
|
D0020022 | For total electronic projects |
|
PROPOSAL REQUIREMENTS AND CONDITIONS. (REV 7-27-00) (1-01) ARTICLE 2-2 (of the Supplemental Specifications). Beginning with the third paragraph to the end of Article 2-2, the text is deleted. |
D00201DC | All District Let and Maintenance Contracts excluding Lump Sum |
|
MANDATORY REVISION
DELETE THIS SPECIAL PROVISION PROPOSAL REQUIREMENTS AND CONDITIONS. (REV 8-1-00) (1-01) ARTICLE 2-2 (of the Supplemental Specifications). The first three paragraphs are deleted and the following substituted: |
D00200LS | Lump Sum projects let in Central Office |
|
PROPOSAL REQUIREMENTS AND CONDITIONS.
(REV 8-1-00) (1-01) |
D002DCLS | Lump Sum Projects let in the District |
|
EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND SITE
OF WORK. (REV 4-19-99) (1-02) ARTICLE 2-4 (of the Supplemental Specifications) is expanded by the following: Insert # __________ |
D0020024 | All Jobs, (add a phone number or e-mail address) |
|
PREPARATION OF PROPOSALS. (REV 11-5-97) (FA 1-25-98) (7-00) SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded as follows: |
D00200AB | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00300AB, D0040091, D00800AB and D008007A |
|
PREPARATION OF PROPOSALS. (REV 4-29-97) (FA 5-7-97) (7-00) SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded by the following: Insert # __________ |
D00200LR | 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with D00300LR, D00800LR and D00801LR |
|
AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) ARTICLE 3-1 (of the Supplemental Specifications). The first and second sentences are deleted and the following substituted: Insert # _________ |
D00300AB | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D0040091,D008007A and D00800AB |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-27-00) (1-01) ARTICLE 3-1 (of the Supplemental Specifications). The first paragraph is expanded by the following: Insert # _________ |
D00300DC | All District Let and Maintenance Contracts excluding Lump Sum |
|
AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) ARTICLE 3-1 (of the Supplemental Specifications). The first paragraph is deleted and the following substituted: |
D00300LS | Lump Sum Projects |
|
AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) ARTICLE 3-1 (of the Supplemental Specifications). The first and second sentences are deleted and the following substituted: |
D00300LR | 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with D00200LR, D00800LR and D00801LR |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (1-02) ARTICLE 3-2 (of the Supplemental Specifications) is expanded by the following: Insert # _________ *Contracts Office must approve |
D0032000 | When necessary to change standard “Award and Execution”* |
| AWARD AND EXECUTION OF CONTRACT. (REV 2-7-97) (7-00) SUBARTICLE 3-2.1 (of the Supplemental Specifications) is deleted and the following substituted: |
D00300003 | Bid Average Method (Use with proper authority) |
| ALTERATION OF PLANS OR OF CHARACTER OF WORK. (REV 8-1-00) (1-01) SUBARTICLE 4-3.1 (of the Supplemental Specifications) is deleted and the following substituted: |
D00403LS | Lump Sum Projects |
|
VALUE ENGINEERING INCENTIVE. (REV 8-12-96) (FA 7-2-97) (7-00) SUBARTICLE 4-3.9 (of the Supplemental Specifications) is deleted. |
D00400DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
| UNFORESEEABLE WORK. (REV 9-28-98) (7-00) ARTICLE 4-4 (Page 25) is deleted and the following substituted: |
D0040004 | 999-25 2999-25 |
|
DESIGN STANDARDS (ENGLISH UNITS). (REV 2-5-01) (7-02)
|
D005011E | All English Jobs |
|
ROADWAY AND TRAFFIC DESIGN STANDARDS (METRIC UNITS). (REV 2-5-02) (7-02)
|
D005011M | All Metric Jobs |
|
CONTROL OF THE WORK. (REV 1-9-01) (7-01)
|
D00500LS | Lump Sum Projects |
| INSPECTION. (REV 2-10-94) (7-00) SUBARTICLE 5-9.1 (Page 40) is expanded by the following: Insert # __________ |
D0050091 | Long bridge jobs (1500 feet [450 m] or longer); modify to suit |
| CONTROL OF MATERIALS. (REV 1-9-01) (7-01) ARTICLE 6-1 (Pages 49 and 50) is expanded by the following new Subarticles: |
D00600LS | Lump Sum Projects |
|
LAWS TO BE OBSERVED. (REV 2-1-02) (7-02) SUBARTICLE 7-1.1 (54 and 56) is expanded by the following: |
D0070011 | Federal Aid Jobs |
|
ENDANGERED SPECIES. (REV 2-10-94) (7-00) SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following: |
D0070010 | When called for (woodpecker) |
|
ENDANGERED SPECIES. (REV 2-27-96) (FA 3-26-96) (7-00) SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following: |
D0070014 | When called for (Manatees and/or turtles) |
| PERMITS PROCURED BY THE DEPARTMENT. (REV 8-7-01) (7-02) SUBARTICLE 7-2.1 (Page 58) is expanded by the following: |
D0070021 | Jobs with permit(s) procured by DOT |
| PERMITS PROCURED BY THE CONTRACTOR. (REV 12-18-00) (1-01) SUBARTICLE 7-2.1 (Page 58) is expanded by the following: |
D0070022 | Jobs with buildings |
|
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE
U.S. AND WATERS OF THE STATE. (REV 2-21-01) (7-02) SUBARTICLE 7-2.2 (Page 58) is expanded by the following: |
D0070002 |
When NPDES is required |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 1-9-01) (1-01) SUBARTICLE 7-7.1 (Page 59) is expanded by the following: Insert # ________ |
D00700DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
|
STRUCTURES OVER NAVIGATABLE WATERS. (REV 2-10-94) (7-00) ARTICLE 7-8 (Page 61) is expanded by the following: |
D0070080 | When work platforms are indicated in the permit for construction |
|
USE OF EXPLOSIVES. (REV 9-26-94) (7-00) ARTICLE 7-9 (Page 61) is deleted and the following substituted: |
D0070008 | When explosives are prohibited |
|
MANDATORY REVISION ADD THIS SPECIAL PROVISION
CONTRACTOR’S RESPONSIBILITY FOR WORK.
|
D0070140 | All Jobs |
|
UTILITY WORK. (REV 2-10-94) (7-02) SUBARTICLE 7-11.6.3 (Pages 65 and 66) is expanded by the following: |
D0071164 | When no utility work is anticipated |
|
UTILITY WORK. (REV 8-27-01) ((7-02) SUBARTICLE 7-11.6.3 (Pages 65 and 66) is expanded by the following: |
D0070116 | When there is Utility work |
|
WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 8-27-99) (FA 11-16-99) (7-02) ARTICLE 7-16 (of the Supplemental Specifications) is expanded by the following: Insert # ________ |
D0070160 | All Federal Aid Jobs |
|
PROSECUTION AND PROGRESS-SUBLETTING OR ASSIGNING OF CONTRACTS. (REV 2-5-02) (7-02) SUBARTICLE 8-1.1 (Page 71) The first paragraph is deleted and the following substituted: |
D0080011 | All Jobs |
|
SUBLETTING CONTRACTS. (REV 2-14-94) (7-00) SUBARTICLE 8-1.1 (Page 71) is expanded by the following: |
D0080010 | Pressure Epoxy Grouting pay item “Injecting and Sealing Prestressed Beams” |
|
PROSECUTION AND PROGRESS. (REV 8-1-00) (7-02) SUBARTICLE 8-1.1 (Page 71) The first paragraph is deleted and the following substituted: |
D00800LS | Lump Sum Projects |
|
SPECIALTY WORK. (REV 9-28-98) (7-00) SUBARTICLE 8-1.2 (Page 72). The text is deleted and the following substituted: Insert #___________ |
D0080012 | For Contracts not normally performed by Road and Bridge Contractors |
|
SUBMISSION OF WORKING SCHEDULE. (REV 11-29-99) (FA 12-7-99) (7-00) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted: |
D0080032 | Use only when authorized by District Construction Engineer. Do not use with D0080003, D0080039 or D00800DC |
|
SUBMISSION OF WORKING SCHEDULE. (REV 11-29-99) (FA 12-21-99) (7-00) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted: |
D0080039 | Use only when authorized by District Construction Engineer. Do not use with D0080003, D0080032 or D00800DC |
|
PROSECUTION AND PROGRESS. (REV 2-27-01) (7-01) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted. |
D00800DC | District Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts. Do not use with D0080003, D0080039, D0080048 or D0080050 |
|
PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 8-2-96) (FA 9-4-96) (7-00) SUBARTICLE 8-3.3 (Page 74) is deleted and the following substituted: Insert # ________ *Contracts Office must be notified |
D0080083 | When called for*
(For use on Non-NHS projects ONLY) |
|
BEGINNING WORK. (REV 7-10-95) (7-00) SUBARTICLE 8-3.3 (Page 74). The last sentence is deleted and the following substituted: Insert # ________ |
D0080330 | When called for by the District Construction Engineer |
|
BEGINNING WORK. (REV 10-22-98) (FA 11-5-98) (7-00) SUBARTICLE 8-3.3 (Page 74) is expanded by the following substituted: Insert # ________ *Contracts Office must be notified |
D0080033 | Only when called for by the District Construction Engineer |
|
PROSECUTION OF WORK - PARTNERING. (REV 3-4-98) (FA 5-26-98) (7-00) ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle: Insert # _______ *Contracts Office must be notified |
D0080036 | 999-16* 2999-16* |
|
PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 1-23-01) (FA 2-1-01) (7-02) ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle: |
D0080037 | 999-20* 2999-20* |
|
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD. (REV 6-5-01) (FA 6-20-01) (1-03) ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle: |
D0080370 | Jobs without 999-20;
2999-20 |
|
LIMITATIONS OF OPERATIONS. (REV 2-14-94) (7-00) SUBARTICLE 8-4.1 (Pages 74 and 75) is expanded by the following:Insert#______________ |
D0080048 | When certain night work hours are required. Must be modified to show work hours. (Use when requested by proper authority). Do NOT use with D00800DC |
|
LIMITATIONS OF OPERATIONS. (REV 2-14-94) (7-00) SUBARTICLE 8-4.1 (Pages 74 and 75) is expanded by the following: |
D0080050 | Modify as appropriate (use only when required). Do NOT use with D00800DC |
|
HAZARDOUS OR TOXIC WASTE - MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (7-00) SUBARTICLE 8-4.9 (Page 76) is expanded by the following: Insert # ________ *Insert Hazardous Waste Coordinator and contact number |
D0080049 | Jobs with Lighting* |
|
COMPUTATION OF CONTRACT TIME. (REV 7-24-96) (FA 9-3-96) (7-00) SUBARTICLE 8-7.1 (Page 78) is deleted and the following substituted: |
D008007A | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D00300AB,D0080091 and D00800AB |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (7-00) SUBARTICLE 8-7.1 (Page 79) is expanded by the following: Insert # ________ |
D0080072 | Use when requested by proper authority, (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (7-00) SUBARTICLE 8-7.1 (Page 78) is expanded by the following: Insert # _______ |
D0080076 | Only when called for (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (7-00) SUBARTICLE 8-7.1 (Page 78) is expanded by the following: |
D0080700 | Use when requested by proper authority |
|
PROSECUTION AND PROGRESS. (REV 7-28-97) (7-00) SECTION 8 (Pages 71-84) is expanded by the following new Article: |
D00800D0 | All Jobs with Alternative Bidding. (Use with proper authority) |
|
8-13. Incentive - Disincentive for A+B. (REV 3-8-99) (7-00) Insert # _________ |
D00800AB | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D003000AB,D0040091 and D008007A |
|
8-13. “No Excuse Bonus” Payment and Waiver of Contractor Claims. (REV 3-8-99) (7-01) Insert # _________ |
D0080016 | Bonus (Date Specific) (Use with proper authority) |
|
8-13. “No Excuse Bonus” Payment and Waiver of Contractor Claims. (REV 3-8-99) (7-01) Insert # _________ |
D0080D16 | Bonus (Calendar Days) (Use with proper authority) |
|
8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert # _________ |
D0080017 | Liquated Savings. (Use with proper authority) |
|
8-13. Incentive - Disincentive. (REV 3-8-99) (7-00) Insert # _________ |
D00800ID | Incentive - Disincentive. (Use with proper authority) |
|
8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) |
D00800LR | 999-5, 2999-5; Lane Rental. (Use with proper authority) |
|
8-13. Damage Recovery. (REV 4-11-97) (FA 5-7-97) (7-00) Insert # __________ |
D00801LR | 999-5, 2999-5; Lane Rental. (Use with proper authority) |
|
MEASUREMENT AND PAYMENT. (REV 10-29-01) (FA 1-9-02) (7-02) SUBARTICLE 9-1.3 (Page 85) is deleted and the following substituted: |
D00900LS | Lump Sum Projects |
|
MEASUREMENT AND PAYMENT. (REV 5-7-97) (FA 7-2-97) (7-02) SUBARTICLES 9-2.1.1 and 9-2.1.2 (of the Supplemental Specifications) are deleted. |
D00900DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum Projects |
|
WITHHOLDING PAYMENT. (REV 12-18-01) (7-02) SUBARTICLE 9-6.3.2 (of the Supplemental Specifications) is deleted and the following substituted: |
D0090632 | All Jobs |
|
MAINTENANCE OF TRAFFIC-CROSSING INTERSECTIONS. (REV 5-14-01) (FA 5-21-01) (1-02) SUBARTICLE 102-2.3 (Page 106) is expanded as follows: |
D1020023 | 102-107, 2102-107 |
|
PORTABLE TRAFFIC SIGNAL. (REV 10-27-99) (FA 11-1-99) (7-00) SUBARTICLE 102-3.1 (Pages 106 and 107) is expanded as follows: |
D1020031 | 102-104-1, 2102-104-1 |
|
TEMPORARY GLARE SCREEN. (REV 5-14-01) (FA 5-21-01) (1-02) SUBARTICLE 102-3 (Pages 106-111) is expanded as follows: |
D1020003 | Temporary Glare Screen |
|
WORKZONE PAVEMENT MARKINGS. (REV 6-18-97) (7-02) SUBARTICLE 102-3.3 (Pages 108-111) is deleted and the following substituted: |
D1020033 | All Jobs |
|
PROTABLE REGULATORY SIGNS. (REV 12-11-00) (FA6-20-01) (7-02) SUBARTICLE 102-2.3 (Pages 106-111) is expanded by the following new Subarticle: |
D1020035 | 900-102-1, 2900-102-1 |
|
RADAR SPEED DISPLAY UNIT. (REV 12-11-00) (FA 6-20-01) (1-02) SUBARTICLE 102-2.3 (Pages 106-111) is expanded by the following new Subarticle: |
D1020037 | 900-102-2, 2900-102-2 |
|
SAFETY WARNING TRANSMITTER. (REV 12-11-00) (FA 6-20-01) (1-02) SUBARTICLE 102-2.3 (Pages 106-111) is expanded by the following new Subarticle: |
D1020038 | 900-102-3, 2900-102-3 |
|
PORTABLE HIGHWAY ADVISORY RADIO SYSTEM. REV 12-11-00) (FA 6-20-01) (1-02) SUBARTICLE 102-2.3 (Pages 106-111) is expanded by the following new Subarticle: |
D1020036 | 900-102-4, 2900-102-4 |
|
MAINTENANCE OF TRAFFIC. (REV 3-17-94) (7-00) SECTION 102 (Pages 104-115) is expanded as follows: |
D1020001 | Heading |
|
(REV 3-17-94) (7-00) For moving pavement marking operations... |
D10200E1 | Jobs with Stiping |
|
(REV 3-17-94) (7-00) ARTICLE 102-8 (Page 115) is expanded by the following new Subarticle: |
D10200D1 | Job with Pay Item Breakdown |
|
(REV 3-13-98) (FA 4-2-98) (7-02) 102-8. Work Zone Signs |
D10200A5 | 102-60, 2102-60 |
|
(REV 11-8-99) (FA 4-6-00) (1-01) 102-8. Work Zone Business Entrance Signs |
D10200A8 | 102-61, 2102-61 |
|
(REV 10-17-97) (FA 2-17-98) (7-02) 102-8. Temporary Curb |
D10200A4 | 102-69, 2102-69 |
|
(REV 5-31-95) (7-00) 102-8. Concrete Barrier Wall (Temporary) (With or Without Glare Screen) |
D1020917 | 102-70, 2102-70; 102-79, 2102-79 |
|
(REV 2-15-99) (FA 3-16-99) (7-00) 102-8. Temporary Guardrail. |
D10200A3 | 102-73, 2102-73 |
|
MAINTENANCE OF TRAFFIC-CROSSING INTERSECTIONS. (REV 5-14-01) (FA 5-21-01) (1-02) SUBARTICLE 102-2.3 (Pages 106) is expanded as follows: |
D10200E1 | 102-73, 2102-73 |
|
(REV 2-15-99) (FA 3-16-99) (7-00) 102-8. Temporary Guardrail. |
D10200A3 | 102-73, 2102-73 |
| 102-8. Warning and Channelization Devices. (REV 3-17-94) (7-02) | D10200B4 | 102-74, 2102-74 |
| 102-8. Advance Warning Arrow Panel. (REV 3-17-94) (7-02) | D10200A6 | 102-76, 2102-76 |
| 102-8. High Intensity Warning Lights. (REV 3-17-94) (7-02) | D10200A7 | 102-77, 2102-77 |
| 102-8. Temporary Vehicular Impact Attenuator (Inertia). (REV 3-28-96) (FA 4-16-96) (7-02) | D1020A81 | 102-81-1, 2102-81-1 |
| 102-8. Temporary Vehicular Impact Attenuator. (REV 4-26-96) (FA 5-29-96) (7-02) | D1020089 | 102-89, 2102-89 |
| 102-8. Barricade (To Remain). (REV 3-17-94) (7-02) | D1020A98 | 102-98, 2102-98 |
| 102-8. Variable Message Sign. (REV 3-17-94) (7-00) | D1020A25 | 102-99, 2102-99 |
| 102-8. Portable Regulatory Signs. (REV 12-11-00) (FA 6-20-01) (1-02) | D1020A10 | 900-102-1, 2900-102-1 |
| 102-8. Radar Speed Display Unit. (REV 12-11-00) (FA 6-20-01) (1-02) | D1020A12 | 900-102-2, 2900-102-2 |
| Safety Warning Transmitter. (REV 12-11-00) (FA 6-20-01) (1-02) | D1020A13 | 900-102-3, 2900-102-3 |
| 102-8. Temporary Traffic Control Signals. (REV 3-17-94) (7-02) | D102A104 | 102-104, 2102-104 |
| <102-8. Temporary Traffic Detection Technology. (REV 5-14-01) (FA 5-25-01) (7-02)< | D102A107 | 102-107, 2102-107 |
|
ENGINEER’S FIELD OFFICE. (REV 12-10-96) (FA 12-17-96) (7-02) PAGE 125. The following new Section is added after Section 104: |
D1090000 | 109-71; 2109-71 |
|
REMOVAL OF EXISTING BULKHEAD. (REV 7-10-95) (FA 6-21-99) (7-00) ARTICLE 110-1 (of the Supplemental Specifications) is expanded by the following: |
D1100073 | 110-73; 2110-73 |
|
REMOVAL AND DISPOSAL OF FENDER SYSTEM. (REV 3-18-94) (FA 6-21-99) (7-00) SUBARTICLE 110-6.1 (of the Supplemental Specifications) is expanded by the following: |
D1100001 | 110-71-1; 2110-71-1. Modify to suit |
|
MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (7-00) SUBARTICLE 110-11.2 (of the Supplemental Specifications) is expanded by the following: |
D1100113 | 110-84; 2110-84 |
|
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (7-00) ARTICLE 120-1 (of the Supplemental Specifications) is expanded by the following: |
D1200003 | Use when contaminated areas are delineated in the plans |
|
FILL GRAVEL. (REV 3-11-96) (7-00) ARTICLE 120-1 (of the Supplemental Specifications) is expanded by the following: |
D1200123 | 120-72; 2120-72; plan details required |
|
FILL SAND. (REV 1-3-94) (7-00) PAGE 160. The following new Section is added after Section 125: |
D1420000 | 142-70; 2142-70; (Plans to cover Material and Placement) |
|
STABILIZED SUBBASE UNDER CONCRETE PAVEMENT. (REV 1-3-94) (7-00) ARTICLE 160-3 (of the Supplemental Specifications) is expanded by the following: |
D1600003 | Only when called for |
|
ORGANIC SOIL LAYER. (REV 1-19-00) (FA 1-25-00) (7-00) PAGE 171. The following new Section is added after Section 162: |
D162A0000 | 162-4; 2162-4 |
|
BLANKET MATERIAL. (REV 10-22-99) (FA 1-20-00) (7-00) PAGE 171. The following new Section is added after Section 162: |
D16300000 | 163-1; 2163-1 |
|
STABILIZED SUBBASE. (REV 1-3-94) (7-00) PAGE 180. The following new Section is added after Section 175: |
D1800000 | 180-70; 2180-70 180-71; 2180-71 |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-01) ARTICLE 327-1 (of the Supplemental Specifications). The third paragraph is deleted and the following substituted: Insert # ________ |
D3270001 | When the plans provide a location for stockpiling milled material. Insert quantity to be retained. Use all, tons, metric tons, cubic yards or cubic meters |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (7-00) ARTICLE 327-2 (of the Supplemental Specifications) is expanded by the following: |
D3270004 | Use when requested by districts |
|
SURFACE REQUIREMENTS. (REV 4-29-98) (FA 5-26-98) (7-02) ARTICLE 330-12 (of the Supplemental Specifications) is expanded by the following new Subarticle: |
D3300012 | For rural projects when called for by District Construction |
|
USE OF RECLAIMED ASPHALT PAVEMENT (RAP) MATERIAL. (REV 2-5-02) (7-02)
|
D3340251 | When PG 76-22 Asphalt Binder is called for |
|
PATCHING PORTLAND CEMENT CONCRETE PAVEMENT. (REV 2-7-94) (7-00) PAGE 373. The following new Section is added after 352. |
D3540001 | 354-70; 2354-70 (requires D3530000 also) |
|
COMPOSITE PANEL SUPPORT REPAIR. (REV 12-10-93) (7-00) SECTION 400 (of the Supplemental Specifications) is expanded by the following: |
D4000003 | 400-128; 2400-128 |
| PRECAST BULKHEAD PANELS. (REV 7-10-95) (7-00) SUBARTICLE 400-22.1 (of the Supplemental Specifications) is expanded by the following: |
D4000217 | 400-72; 2400-72 (requires plan details) |
| REPLACE GRATES. (REV 2-3-94) (7-00) ARTICLE 425-1 (Page 386) is expanded by the following: |
D4250010 |
425-82; 2425-82 (requires plan details) |
|
DESILTING PIPE. (REV 6-13-95) (FA 6-21-95) (7-00) SECTION 430 (of the Supplemental Specifications) is expanded by the following: |
D4300094 | 430-94; 2430-94 |
|
DESILTING CONCRETE BOX CULVERTS. (REV 11-9-93) (7-03) SECTION 430 (of the Supplemental Specifications) is expanded by the following: |
D4300013 | 430-950; 2430-950 |
| DEEP DRAINAGE WELLS. (REV 11-9-93) (7-00) PAGE 459. The following new Section is added after Section 443: |
D4440000 | 444-70; 2444-70 444-71; 2444-71 |
|
PRECAST PRESTRESSED CONCRETE CONSTRUCTION. (REV 12-20-01) (7-02)
|
D4500000 | Prestressed Jobs |
| INTEGRAL PILE JACKETS. (REV 9-12-94) (7-00) PAGE 598. The following new Section is added after Section 455: |
D4570001 | 457-70; 2457-70 |
|
POST-TENSIONING. (REV 6-27-01) (FA 7-9-01) (1-02)
|
DB460000 | Post Tensioning Jobs |
| BARRIER WALL REMOVAL (CONCRETE). (REV 7-10-95) (7-00) ARTICLE 521-1 (of the Supplemental Specifications) is expanded by the following: Prestressed Jobs |
D5210073 | 521-73; 2521-73 (plan details required) |
|
COLORING CONCRETE SURFACES. (REV 4-1-99) (7-00) PAGE 654. The following new Section is added after Section 522: |
D5230000 | 523-70; 2523-70 |
|
NOISE BARRIER WALL. (REV 12-31-96) (7-00)
|
D5340001 |
534-72 2534-72 |
|
OPAQUE VISUAL BARRIER. (REV 4-13-94) (7-00) PAGE 672. The following new Section is added after Section 538: |
D5390000 | 539-80; 2539-80 (requires plan details) |
|
FENCING. (REV 1-6-98) (7-02) ARTICLE 550-2 (Page 681). The text is deleted and the following substituted: |
D5500021 | Type A fencing on non-NHS Projects only |
|
DIRECTIONAL BORE.
(REV 2-3-00) (7-02) |
D5550000 |
555-1 2555-1 |
|
COAL TAR-EPOXY COATING OF PERMANENT BULKHEAD SHEET PILES. (REV 1-3-94) (FA 6-21-99) (7-00) ARTICLE 560-11 (Pages 691 and 692) is expanded to the following new Subarticle: |
D5600115 | Only when called for |
|
GRASSING (BY SEEDING)-WATERING. (REV 3-10-00) (1-01) ARTICLE 570-3.6 (Page 700) is deleted and the following substituted: |
D5700036 | Seeding Jobs |
|
PLASTIC EROSION MAT. (REV 1-5-00) (FA 1-12-00) (7-02) Page 702.The following new Section is added after Section 570: |
D5710000 | 571-1; 2571-1 |
|
SUBMITTAL DATA REQUIREMENTS. (REV 1-8-02) (7-02)
|
D6030007 | Jobs with Signals |
|
PAINTING TRAFFIC STRIPES. (REV 7-25-01) (1-02) SUBARTICLE 710-4.1 (Page 780) is expanded by the following: |
D7100041 | Jobs with Traffic Paint |
|
JACK & BORE. (REV 2-3-00) (7-02)
|
D7300000 |
730-76 2730-76 |
|
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7410000 | 741-70; 2741-70 |
|
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7430000 | 743-70; 2743-70 |
|
TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7440000 | 744-70; 744-70 |
|
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 10-25-01) (FA 12-21-01) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7450000 | 745-70; 2745-70 (use with D6600062) |
|
TRAFFIC MONITORING SITE CABINET. (REV 6-21-99) (FA 7-20-99) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7460000 | 746-7; 2746-7 |
|
TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (7-00) PAGE 797. The following new Section is added after Section 715: |
D7470000 | 747; 2747 Items |
|
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE
EQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (7-00) PAGE 797. The following new Section is added after Section 715: |
D7480000 | Jobs with Traffic Monitoring Sites |
|
POST-TENSIONING GROUT. (REV 7-30-01) (7-02)
|
D9380000 | Post Tensioning Jobs and Jobs with cylinder piles |
|
TIMBER TREATMENT (INCLUDING TREATING MATERIALS). (REV 1-11-02) (7-02)
|
D9550000 | All Jobs |
|
TRANSPORTATION ENHANCEMENT PROJECTS. (REV 8-6-96) (FA 12-10-96) (7-00) SUBARTICLE 120-9.2 (of the Supplemental Specifications) is expanded by the following: |
DENHANCE | For non-vehicular enhancement projects only |
|
TRAINING SPECIAL PROVISION.
(REV 1-25-02) (FA 2-5-02) (7-02) Section 7 of the Appendix entitled “Specific Equal Employment Opportunity Responsibilities” attached to this Specifications Package is expanded as follows: |
DTRAINSP | All Jobs |
| Supplemental Specifications | SS0000001 | All Jobs |
|
MANDATORY REVISION
DELETE THIS SUPPLEMENTAL SPECIFICATION
|
D0020000 | All Jobs |
|
MANDATORY REVISION
ADD THIS SUPPLEMENTAL SPECIFICATION 002 CONTRACTOR’S RESPONSIBILITY FOR WORK. (REV 2-13-02) (7-02)
|
D0020000 | All Class I Projects |
|
003 AWARD AND EXECUTION OF CONTRACT. (REV 7-27-00) (FA 8-3-00) (1-01) SECTION 3 (Pages 15-18) is deleted and the following substituted: |
D0030000 | All Jobs |
|
004 ALTERATION OF PLANS OR OF CHARACTER OF WORK. (REV 1-10-00) (FA 1-12-00) (7-02) ARTICLE 4-3 (Pages 18-25) is deleted and the following substituted: |
D0040003 | All Jobs |
|
005 CONTROL OF THE WORK. (REV 2-28-00) (FA 5-9-00) (1-01)
|
D0050084 | All Jobs |
|
005 CONTRACTOR’S QUALITY CONTROL MANAGER. (REV 12-18-01) (FA 1-3-02) (7-02)
|
D0050085 | All Jobs |
|
005 CLAIMS BY CONTRACTOR. (REV 1-10-00) (FA 1-12-00) (2-00)
|
D0050012 | All Jobs |
|
006 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS. (REV 10-16-00) (FA 11-17-00) (7-01)
|
D0060032 | All Jobs |
|
006 MATERIALS ACCEPTED BASED ON MANUFACTURER’S CERTIFICATION. (REV 2-1-00) (FA 7-10-01) (7-02)
|
D0060005 | All Jobs |
|
006 CONTROL OF MATERIALS. (REV 9-4-01) (FA 1-3-02) (7-02)
|
D0060067 | All Jobs |
|
006 QUALITY CONTROL PROGRAM.
(REV 12-19-01) (FA 1-3-02) (7-02) SECTION 6 (Pages 49-54) is expanded by the addition of the following new Articles: |
D0060008 | All Jobs |
|
007 LAWS TO BE OBSERVED. (REV 10-5-99) (FA 10-8-99) (7-00)
|
D0070017 | All Jobs |
|
007 TRAFFIC SIGNS, SIGNAL EQUIPMENT, HIGHWAY LIGHTING AND GUARDRAIL. (REV 10-31-00) (FA 12-19-01) (7-02)
|
D0070114 | All Jobs |
|
007 RESPONSIBILITY FOR DAMAGES, CLAIMS, ETC. (REV 1-31-01) (FA 4-11-01) (2-01)
|
D0070012 | All Jobs |
|
007 WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 8-27-99) (FA 11-16-99) (7-00) ARTICLE 7-16 (Page 69). The text is deleted and the following substituted: |
D0070016 | All Federal Aid Jobs |
|
007 SUBMITTAL OF WAGE RATE
SUMMARY. (REV 11-28-00) (FA 2-5-01) (7-02) ARTICLE 7-23 (Page 71). The text is deleted and the following substituted: |
D0070023 | All Jobs |
|
008 LIMITATIONS OF OPERATIONS - NIGHT WORK. (REV 7-23-01) (FA 8-3-01) (7-02)
|
D0080041 | All Jobs |
|
008 QUALIFICATIONS OF CONTRACTOR’S PERSONNEL.
(REV 12-24-01) (FA 1-7-02) (7-02)
ARTICLE 8-5 (Pages 76 and 77) is deleted and the following substituted: |
D0080005 | All Jobs |
|
008 TEMPORARY SUSPENSION OF CONTRACTOR’S OPERATIONS. (REV 11-2-99) (FA 11-12-99) (7-00)
|
D0080006 | All Jobs |
|
008 PROSECUTION AND PROGRESS -ADJUSTING CONTRACT TIME.
(REV 4-3-01) (FA 5-8-01) (1-02) |
D0080073 | All Jobs |
|
008 DEFAULT AND TERMINATION OF CONTRACT.
(REV 4-24-00) (FA 6-1-00) (1-01) |
D0080091 | All Jobs |
|
008 AMOUNT OF LIQUIDATED DAMAGES.
(REV 3-15-01) (FA 6-14-01) (1-02) |
D0080102 | All Jobs |
|
009 MEASUREMENT AND PAYMENT.
(REV 11-16-00) (FA 2-1-01) (7-01) |
D0090015 | All Jobs |
|
009 SCOPE OF PAYMENTS.
(REV 10-26-00) (FA 11-17-00) (1-02) |
D0090002 | All Jobs |
|
009 COMMON CARRIER FREIGHT RATES.
(REV 8-9-00) (FA 11-17-00) (7-01) |
D0090004 | All Jobs Do not use with D00900DC |
|
009 PARTIAL PAYMENTS.
(REV 11-22-00) (FA 2-7-01) (7-01) |
D0090006 | All Jobs |
|
009 RECORD OF CONSTRUCTION
MATERIALS. (REV 1-11-01) (FA 2-5-01) (7-01) ARTICLE 9-7 (Pages 99 and 100) is deleted and the following substituted: |
D0090007 | All Jobs |
|
009 ACCEPTANCE AND FINAL PAYMENT.
(REV 5-13-99) (FA 12-3-99) (7-00) |
D0090009 | All Jobs |
|
100 CONSTRUCTION EQUIPMENT-GENERAL REQUIREMENTS. (REV 12-14-01) (FA 11-4-02) (7-02) SECTION 100 (Pages 102 and 103) is deleted and the following substituted: |
D1000000 | All Jobs |
|
102 MAINTENANCE OF TRAFFIC.
(REV 4-11-00) (FA 5-1-00) (1-01) |
D1020014 | All Jobs |
|
102 TRAFFIC CONTROL - MOT DEVICES.
(REV 5-21-01) (FA 10-25-01) (7-02) |
D1020326 | All Jobs |
|
102 TRAFFIC CONTROL - USE OF ORANGE VESTS.
(REV 1-6-98) (FA 2-2-98) (7-00) |
D1020327 | All Jobs |
|
102 WORK ZONE SIGNS.
(REV 12-11-97) (FA 1-6-98) (7-02) |
D1020060 |
All Jobs (Also use D10200A5) |
|
102 MAINTENANCE OF TRAFFIC - DETOURS.
(REV 2-12-01) (FA 6-14-01) (1-02) |
D1020042 | Jobs with Detour Bridges |
|
102 TRUCK MOUNTED ATTENUATORS.
(REV 4-27-00) (FA 11-17-00) (7-02) |
D1020071 | All Jobs |
|
104 CONSTRUCTION REQUIREMENTS-ARTIFICIAL COVERINGS. (REV 5-8-00) (FA 5-15-00) (1-01) ARTICLE 104-6 (Pages 119-123) is expanded by the following new Subarticle: |
D1040006 | 104-1; 2104-1 |
|
104 BALED HAY OR STRAW. (REV 5-10-01) (FA 11-9-01) (7-02) SUBARTICLE 104-6.4.9 (Page 121) The text is deleted and the following substituted: |
D1040649 | All Jobs |
|
105 QUALITY CONTROL PLAN. (REV 12-19-01) (FA 1-4-02) (7-02) PAGE 125. The following new Section is added after Section 104: |
D1050000 | All Jobs |
|
110 CLEARING AND GRUBBING. (REV 6-29-01) (FA 1-4-02) (7-02) SECTION 110 (Pages 126-134) is deleted and the following substituted: |
D1100000 | 110; 2110 Items |
|
120 EXCAVATION AND EMBANKMENT. (REV 12-19-01) (FA 1-9-02) (7-02)
|
D1200000 | All Jobs |
|
121 FLOWABLE FILL. (REV 12-20-01) (FA 1-7-02) (7-02) SECTION 121 (Pages 150-152) is deleted and the following substituted: |
D1210000 | All Jobs |
|
125 EXCAVATION FOR STRUCTURES AND PIPE.
(REV 2-5-02) (FA 2-5-02) (7-02) |
D1250000 | 125; 2125 Items |
|
145 GEOSYNTHETIC REINFORCEMENT. (REV 11-1-99) (FA 11-4-99) (7-00) PAGE 160. The following new Section is added after Section 125: |
D1450000 | 145; 2145 Items |
|
160 STABILIZING. (REV 10-17-01) (FA 1-10-02) (7-02) SECTION 160 (Pages 160-165) is deleted and the following substituted: |
D1600000 | 160; 2160 Items |
|
200 ROCK BASE. (REV 2-5-03) (FA 2-11-03) (7-03) SECTION 200 (Pages 181-184) is deleted and the following substituted: |
D2000000 | 285; 2285 Items |
|
204 GRADE AGGREGATE BASE. (REV 10-31-01) (FA 1-3-02) (7-02) ARTICLE 204-6 (Page 186) is deleted and the following substituted: |
D2040000 | 285-7xx; 2285-7xx |
|
210 REWORKING LIMEROCK BASE.
(REV 10-31-01) (FA 1-3-02) (7-02) |
D2100000 | 210-1; 2210-1; 210-2; 2210-2 |
|
234 SUPERPAVE ASPHALT BASE.
(REV 12-19-01) (FA 1-4-02) (7-02) |
D2340000 | 285-7xx; 2285-7xx |
|
240 SAND-CLAY BASE. (REV 10-31-01) (FA 1-3-02) (7-02) ARTICLE 240-5 (Page 194) is deleted and the following substituted: |
D2400000 | 285-7xx; 2285-7xx |
|
280 ASPHALT BASE COURSES. (REV 12-19-01) (FA 1-4-02) (7-02) SECTION 280 (Page 207-209) is deleted and the following substituted: |
D2800000 | 285-7xx; 2285-7xx |
|
283 RECLAIMED ASPHALT PAVEMENT BASE. (REV 1-7-01) (FA 1-3-02) (7-02) SECTION 283 (Pages 209-211) is deleted and the following substituted: |
D2830000 | 285-7xx; 2285-7xx |
|
285 OPTIONAL BASE COURSE. (REV 10-31-01) (FA 1-4-02) (7-02) SECTION 285 (Pages 211-213) is deleted and the following substituted: |
D2850000 | 285-7xx; 2285-7xx |
|
286 TURNOUT CONSTRUCTION-METHOD OF MEASUREMENT. (REV 6-20-00) (FA 9-13-00) (7-01) ARTICLE 286-5 (Page 214) is deleted and the following substituted |
D2860005 | 286; 2286 Items |
|
288 CEMENT TREATED PERMEABLE BASE. (REV 11-5-01) (FA 1-3-02) (7-02) PAGE 215. The following new Section is added after Section 286: |
D2880000 | 288; 2288 Items |
|
300 PRIME AND TACK COATS FOR BASE COURSES. (REV 12-19-01) (FA 1-4-02) (7-02)
|
D3000000 | Jobs with Asphalt |
|
320 HOT BITUMINOUS MIXTURES-PLANT, METHODS, AND EQUIPMENT. (REV 12-19-01) (FA 1-4-02) (7-02) SECTION 320 (Pages 233-241) is deleted and the following substituted: |
D3200000 | Jobs with Asphalt |
|
327 MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-19-01) (FA 1-4-02) (7-02) SECTION 327 (Pages 241-243) is deleted and the following substituted: |
D3270000 | 327-70; 2327-70 |
|
330 HOT BITUMINOUS MIXTURES - GENERAL CONSTRUCTION REQUIREMENTS. (REV 1-17-02) (FA 2-5-02) (7-02)
|
D3300000 | Jobs with Asphalt |
|
331 TYPE S ASPHALT CONCRETE, QUALITY ASSURANCE AND ACCEPTANCE
PROCEDURES. (REV 9-26-01) (FA 1-4-02) (7-02) SECTION 331 (Pages 266-279) is deleted and the following substituted: |
D3310000 | 331-2; 2331-2 |
|
332 TYPE II ASPHALTIC CONCRETE. (REV 9-26-01) (FA 1-3-02) (7-02) SECTION 332 (Pages 279-281) is deleted and the following substituted: |
D3320000 | 332-2; 2332-2 |
|
333 TYPE III ASPHALTIC CONCRETE. (REV 9-26-01) (FA 1-3-02) (7-02) SECTION 331 (Pages 281-283) is deleted and the following substituted: |
D3330000 | 333-2; 2333-2 |
|
334 SUPERPAVE ASPHALT CONCRETE. (REV 12-20-01) (FA 1-9-02) (7-02) SECTION 334 (Pages 283-304) is deleted and the following substituted: |
D3340000 | Asphalt Jobs |
|
335 SAND-ASPHALT HOT MIX. (REV 9-27-01) (FA 1-3-02) (7-02) SECTION 335 (Pages 304-306) is deleted and the following substituted: |
D3350000 | 335-2; 2335-2 |
|
336 ASPHALT RUBBER BINDER. (REV 9-27-01) (FA 1-4-02) (7-02) SECTION 336 (Pages 306-308) is deleted and the following substituted: |
D3360000 | 334, 2334; 337, 2337; 341, 2341 Items |
|
MANDATORY REVISION
DELETE THIS SUPPLEMENTAL SPECIFICATION 337 ASPHALT CONCRETE FRICTION COURSES.
|
D3370000 |
D3 337-7 2337-7 |
|
MANDATORY REVISION
ADD THIS SUPPLEMENTAL SPECIFICATION 337 ASPHALT CONCRETE FRICTION COURSES.
REV 5-6-02) (FA 1-4-02)
(7-02) |
D3370000 |
337-7 Items 2337-7 Items |
|
339 MISCELLANEOUS ASPHALT PAVEMENT. (REV 9-27-01) (FA 1-3-02) (7-02)
|
D3390000 | 339-1, 2339-1 |
|
341 ASPHALT RUBBER MEMBRANE INTERLAYER. (REV 12-20-01) (FA 1-4-02) (7-02)
|
D3410000 | 341, 2341 Items |
|
346 PORTLAND CEMENT CONCRETE. (REV 1-8-02) (FA 1-10-02) (7-02)
|
D3460000 | Jobs with Concrete |
|
347 PORTLAND CEMENT CONCRETE-CLASS I (NONSTRUCTURAL). (REV 5-21-01) (FA 6-20-01) (1-02) SECTION 347 (Pages 346-349) is deleted and the following substituted: |
D3470000 | Jobs with Nonstructural Concrete |
|
353 CONCRETE PAVEMENT SLAB REPLACEMENT. (REV 12-20-01) (FA 1-3-02) (7-02) PAGE 373. The following Section is added after 352: |
D3530000 | 353-70; 2353-70 |
|
400 CONCRETE STRUCTURES. (REV 8-30-01) (FA 12-20-01) (7-02)
|
D4000000 | Jobs with Concrete Structures |
|
413 SEALING CONCRETE STRUCTURE SURFACES. (REV 8-23-01) (FA 12-20-01) (7-02) SECTION 413 (Pages 420-423) is deleted and the following substituted: |
D4130000 | 400-149, 2400-149; 400-154, 2400-154 |
|
415 REINFORCING STEEL. (REV 4-2-01) (FA 5-11-01) (1-02) SECTION 415 (Pages 423-429) is deleted and the following substituted: |
D4150000 | Jobs with Reinforcing Steel |
|
430 PIPE CULVERTS AND STORM SEWERS. (REV 1-9-03) (FA 1-28-03) (7-03) SECTION 430 (Pages 434-446) is deleted and the following substituted: |
D4300000 | 430; 2430 Items |
|
431 PIPE LINER. (REV 9-21-00) (FA 1-19-01) (7-01) SECTION 431 (Pages 446-448) is deleted and the following substituted: |
D4310000 | 431; 2431 Items |
|
440 UNDERDRAINS. (REV 5-9-02) (FA 7-11-02) (1-03) SECTION 440 (Pages 449-451) is deleted and the following substituted: |
D4400000 | 440; 2440 Items |
|
453 EPOXY JOINTING OF PRECAST SEGMENTS. (REV 12-11-00) (FA 2-5-01) (2-01)
|
D4530000 | Precast Segmental Bridge Projects |
|
455 STRUCTURES FOUNDATIONS. (REV 1-11-02) (FA 1-11-02) (7-02)
|
D4550000 | Structure Foundations Jobs |
|
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS. (REV 4-3-01) (FA 4-11-00) (7-01)
SUBARTICLE 460-2.1 (Page 600) is deleted and the following substituted: |
D4600000 | Jobs with Structural Steel |
|
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS - FABRICATOR QUALIFICATIONS.
(REV 9-18-00) (FA 12-13-00) (7-01) SUBARTICLE 460-2.3 (Page 601) is deleted and the following substituted: |
D4600023 |
460-1, 2460-1 460-2, 2460-2 |
|
460 MARKING AND SHIPPING - GENERAL. (REV 6-16-00) (FA 7-6-00) (1-01)
|
D4600271 |
460 Items 2460 Items |
|
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS - ALUMINUM RAILINGS.
(REV 5-7-01) (FA 10-23-01) (7-02) |
D4600038 |
460-70 2460-70 |
|
A460 MULTIROTATIONAL POT BEARINGS.
(REV 7-7-99) (FA 7-30-99) (7-00) |
DA460001 |
460-113, 2460-113 460-114, 2460-114 |
|
502 SHEAR CONNECTORS. (REV 4-3-01) (FA 4-27-01) (7-01) ARTICLE 502-1 (Page 627) is deleted and the following substituted: |
D5020000 | Jobs with Structural Steel |
|
521 CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS. (REV 7-27-00) (FA 8-1-00) (1-01) SECTION 521 (Pages 650-653) is deleted and the following substituted: |
D5210000 | 521; 2521 Items |
|
522 CONCRETE SIDEWALK-METHOD OF MEASUREMENT. (REV 5-24-00) (FA 9-26-00) (1-01) ARTICLE 522-9 (Page 654) is deleted and the following substituted: |
D5220009 | 522; 2522 Items |
|
524 CONCRETE DITCH AND SLOPE PAVEMENT - METHOD OF MEASUREMENT. (REV 6-23-00) (FA 9-7-00) (7-01)
|
D5240009 | 524; 2524 Items |
|
526 ARCHITECTURAL PAVERS. (REV 4-23-98) (FA 5-26-98) (1-01) Page 657. The following new Section is added after Section 525: |
D5260000 | 526-1; 2526-1 |
|
530 RIPRAP. (REV 10-15-01) (FA 1-3-02) (7-02) SECTION 530 (Pages 657-662) is deleted and the following substituted: |
D5300000 | 530; 2530 Items |
|
536 GUARDRAIL-CERTIFICATION. (REV 5-2-01) (FA 6-14-01) (7-02) ARTICLE 536-2 (Pages 666-668) is expanded by the following: |
D5360002 | 536; 2536 Items |
|
550 FENCING-CERTIFICATION. (REV 5-2-01) (FA 6-14-01) (7-02) ARTICLE 550-3 (Page 682) is expanded by the following: |
D5500003 | 550; 2550 Items |
|
563 ANTI-GRAFFITI COATING SYSTEM. (REV 8-15-00) (FA 9-7-00) (7-01) SECTION 563 (Pages 697-699) is deleted and the following substituted: |
D5630000 | 563; 2563 Items |
|
575 SODDING-WATERING. (REV 3-10-00) (FA 4-5-00) (1-01) SUBARTICLE 575-3.3 (Pages 703 and 704) is deleted and the following substituted: |
D5750033 | Sodding Jobs |
|
580 LANDSCAPING INSTALLATION-PLANTS. (REV 12-6-99) (FA 12-23-99) (7-00) SUBARTICLE 580-2.1.2 (Pages 707 and 708) is deleted and the following substituted: |
D5800002 | Landscaping Jobs |
|
611 ACCEPTANCE OF SIGNAL INSTALLATIONS. (REV 12-15-01) (FA 2-1-01) (7-02) ARTICLE 611-2 (Page 717) is expanded as follows: |
D6110002 | Jobs with Signal |
|
620 SIGNAL INSTALLATION GROUNDING. (REV 7-12-01) (FA 1-3-02) (1-02) SECTION 620 (Pages 721-724) is deleted and the following substituted: |
D6200000 | All Jobs |
|
632 SIGNAL AND INTERCONNECT CABLE. (REV 7-25-00) (FA 8-3-00) (7-02) SECTION 632 (Pages 728-730) is deleted and the following substituted: |
D6320000 | 632; 2632 Items |
|
641 PRESTRESSED CONCRETE POLES. (REV 3-7-00) (FA 5-8-00) (1-01) SECTION 641 (Pages 739 and-740) is deleted and the following substituted: |
D6410000 | 641; 2641 Items |
|
649 STEEL STRAIN POLES, STEEL MAST ARM AND MONOTUBE ASSEMBLIES. (REV 1-7-02) (FA 1-10-02) (7-02) PAGE 740. The following new Section is added after Section 641. |
D6490000 | 649; 2649 Items |
|
650 VEHICULAR SIGNAL ASSEMBLIES-METHOD OF MEASUREMENT. (REV 10-3-00) (FA 1-10-01) (7-01) ARTICLE 650-4 (Page 742) is expanded as follows: |
D6500004 | 650-5; 2650-5 |
|
660 INDUCTIVE LOOP DETECTORS. (REV 7-12-01) (FA 12-19-01) (7-02)
|
D6600062 | 660; 2660 Items |
|
690 REMOVAL OF EXISTING TRAFFIC SIGNAL EQUIPMENT. (REV 5-3-01) (FA 5-15-01) (1-02) SECTION 690 (Pages 754-757) is deleted and the following substituted: |
D6900000 | 690; 2690 Items |
|
699 INTERNALLY ILLUMINATED SIGNS. (REV 6-23-01) (FA 8-23-01) (7-02) PAGE 757. The following new Section is added after Section 690. |
D6990000 | 699-1; 2699-1 |
|
700 SIGN BACKGROUND. (REV 5-15-00) (FA 6-20-00) (1-01)
|
D7000002 | All Jobs |
|
700 HIGHWAY SIGNING
- STENCILING.
(REV 12-12-00) (FA 8-3-01) (7-02)
SUBARTICLE 700-5.5 (Page 765) is deleted and the following substituted: |
D7000055 | All Jobs |
|
701 RAISED RIB SHOULDER WARNING DEVICES. (REV 8-27-01) (FA 11-9-01) (7-02) SUBARTICLE 701-4.1 (Pages 769 and 770) is expanded by the following: |
D7010041 | 701; 2701 Items |
|
702 INVERTED PROFILE, WET WEATHER TRAFFIC STRIPES. (REV 8-27-01) (FA 10-5-01) (7-02) PAGE 772. The following new Section is added after Section 701. |
D7020000 | 702; 2702 Items |
|
704 CERAMIC PAVEMENT MARKERS. (REV 12-17-93) (FA 8-4-98) (7-00) PAGE 772. The following new Section is added after Section 701. |
D7040000 | 704; 2704 Items |
|
705 HIGHWAY DELINEATORS (REV 5-5-00) (FA 6-16-00) (1-01)
|
D7050025 | 705; 2705 Items |
|
709 TRAFFIC STRIPES AND MARKINGS-TWO REACTIVE
COMPONENTS.
(REV 8-27-01) (FA 12-19-01) (7-02) SUBARTICLE 709-4.1(Page 776) is expanded by the following: |
D7090041 | 709, 2709 Items |
|
711 THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS. (REV 8-27-01) (FA 10-25-01) (7-02) SUBARTICLE 711-4.1(Page 785) is expanded by the following: |
D7110041 | 711; 2711 Items |
|
713 PREFORMED PAVEMENT STRIPES AND MARKINGS. (REV 9-17-01) (FA 12-19-01) (7-02) SUBARTICLE 713-4.1(Page 789) is expanded by the following: |
D7130041 | When called for |
|
714 MOTORIST AID CALL BOX RELOCATION. (REV 11-30-00) (FA 2-2-01) (7-01) PAGE 791. The following new Section is added after Section 713: |
D7140000 | 714-1, 2714-1; 400-2, 2400-2 (requires plan details) |
|
715 HIGHWAY LIGHTING SYSTEM. (REV 11-14-01) (FA 12-19-01) (7-02) SECTION 715 (Pages 791-797) is deleted and the following substituted: |
D7150000 | Highway Lighting Projects |
|
901 COARSE AGGREGATE. (REV 1-10-02) (FA 1-10-02) (7-02) SECTION 901 (Pages 798-803) is deleted and the following substituted: |
D9010000 | All Jobs |
|
902 FINE AGGREGATE. (REV 8-23-01) (FA 1-10-02) (7-02) SECTION 902 (Pages 804-807) is deleted and the following substituted: |
D9020000 | All Jobs |
|
916 BITUMINOUS MATERIALS. (REV 10-9-01) (FA 1-3-02) (7-02) SECTION 916 (Pages 815-825) is deleted and the following substituted: |
D9160000 | Asphalt Jobs |
|
919 GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER. (REV 10-10-01) (FA 1-10-02) (7-02) SECTION 919 (Pages 826-828) is deleted and the following substituted: |
D9190000 | Asphalt Jobs (use with pay items 337, 2337; 341 and 2341) |
|
921 PORTLAND CEMENT AND BLENDED CEMENT. (REV 1-9-02) (FA 1-10-02) (7-02) SECTION 921 (Pages 829-832) is deleted and the following substituted: |
D9210000 | Jobs with Concrete |
|
923 WATER FOR CONCRETE. (REV 10-29-01) (FA 12-20-01) (7-02) SECTION 923 (Page 832) is deleted and the following substituted: |
D9230000 | Jobs with Concrete |
|
924 ADMIXTURES WITH CONCRETE. (REV 10-15-01) (FA 1-9-02) (7-02) SECTION 924 (Pages 833-835) is deleted and the following substituted: |
D9240000 | Jobs with Admixtures for Concrete |
|
925 CURING MATERIALS FOR CONCRETE. (REV 9-28-01) (FA 1-10-02) (7-02) SECTION 925 (Pages 836 and 837) is deleted and the following substituted: |
D9250000 | Jobs with Concrete |
|
926 EPOXY COMPOUNDS - CERTIFICATION. (REV 7-1-01) (FA 8-3-01) (7-02)
|
D9260002 | All Jobs |
|
929 POZZOLANS AND SLAG. (REV 9-28-01) (FA 2-5-02) (7-02) SECTION 929 (Pages 845-847) is deleted and the following substituted: |
D9290000 | Jobs with Concrete |
|
930 PACKAGED, DRY, RAPID HARDENED AND VERY RAPID HARDENED CONCRETE OR MORTAR MATERIALS FOR CONCRETE REPAIR. (REV 11-30-01) (FA 1-10-02) (7-02)
|
D9300000 | Jobs with Concrete |
|
931 METAL ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE
STRUCTURES-CERTIFICATION. (REV 11-27-00) (FA 3-20-01) (1-02) SUBARTICLE 931-2.1 (Pages 853 and 854) is expanded as follows: |
D9310002 | All Jobs |
|
932 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES. (REV 3-27-01) (FA 4-16-01) (7-02)
|
D9320000 | All Jobs |
|
934 NON-SHRINK GROUT. (REV 12-20-01) (FA 1-3-02) (7-02) SECTION 934 (Pages 869 and 870) is deleted and the following substituted: |
D9340000 | When non-shrink grout is called for |
|
937 ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS. (REV 4-30-02) (FA 7-25-02) (1-03) SECTION 937 (Pages 873-875) is deleted and the following substituted: |
D9370000 | All Job |
|
941 CONCRETE CULVERT PIPE (ROUND). (REV 12-19-00) (FA 2-2-01) (7-02)
|
D9410001 | 430; 2430 Items |
|
943 CORRUGATED STEEL PIPE AND PIPE ARCH (INCLUDING UNDERDRAIN). (REV 11-21-00) (FA 1-17-01) (7-01) ARTICLE 943-1 (Page 882) is deleted and the following substituted: |
D9430001 | 430; 2430 Items |
|
945 ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS. (REV 11-21-00) (FA 1-10-01) (7-01) ARTICLE 945-1 (Page 887) The first paragraph is deleted and the following substituted: |
D9450001 | 430; 2430 Items |
|
948 MISCELLANEOUS TYPE OF PIPE. (REV 4-23-01) (FA 6-14-01) (7-02) SUBARTICLE 948-1.7 (Page 892) is deleted and the following substituted: |
D9480001 | 430; 2430 Items |
|
948 PIPE LINER MATERIALS. (REV 9-21-00) (FA 1-17-01) (7-01) SECTION 948 (Pages 891-893) is expanded by the following: |
D9480004 | 431; 2431 Items |
|
951 INSPECTION OF TIMBER PRODUCTS. (REV 11-13-01) (FA 1-3-02) (7-02) ARTICLE 951-1 (Pages 894) is deleted and the following substituted: |
D9510001 | All Jobs |
|
970 RAISED RETRO-REFLECTIVE PAVEMENT MARKERS - PERFORMANCE REQUIREMENTS. (REV 8-23-00) (FA 10-27-00) (1-01)
|
D9700003 | Jobs with Reflective Pavement Markers |
|
971 COATINGS AND TRAFFIC MARKING MATERIALS - CERTIFICATION. (REV 12-27-00) (FA 8-3-01) (7-02)
|
D9710015 | All Jobs |
|
971 COATINGS AND TRAFFIC MARKING MATERIALS. (REV 5-4-00) (FA 5-26-00) (7-01) SECTION 971 (Pages 913-945) is expanded by the following: |
D9710022 | All Jobs |
|
982 COMMERCIAL FERTILIZER-CERTIFICATION. (REV 11-27-00) (FA 3-28-01) (1-02) SECTION 982 (Pages 951) is expanded as follows: |
D9820002 | All Jobs |
|
985 GEOTEXTILE FABRICS. (REV 10-20-99) (FA 12-21-99) (7-02) SECTION 985 (Pages 951 and 952) is deleted and the following substituted: |
D9850000 | All Jobs |
|
986 CALCIUM CHLORIDE FOR DUST CONTROL-CERTIFICATION. (REV 1-8-01) (FA 3-7-01) (1-02) SECTION 986 (Pages 952 and 953) is expanded by the following: |
D9860003 | All Jobs |
|
992 HIGHWAY LIGHTING MATERIALS-CERTIFICATION. (REV 5-3-02) (FA 5-16-02) (1-03) ARTICLE 992-4 (Page 955) is expanded by the following Subarticles: |
D9920041 | All Jobs |
|
992 POLE CABLE DISTRIBUTION SYSTEM-WALL MOUNTED LIGHTING. (REV 3-14-00) (FA 5-15-00) (1-01) SUBARTICLE 992-12 (Pages 957-960) is expanded by the following new Subarticle: |
D9920012 | Lighting Jobs |
|
993 TYPE C DELINEATORS. (REV 5-15-00) (FA 6-16-00) (1-01)
|
D9930021 | 705; 2705 Items |
|
993 REFLECTOR UNITS FOR GUARDRAIL - CERTIFICATION. (REV 3-30-01) (FA 4-11-01) (1-02)
|
D9930005 | All Jobs |
|
994 RETROREFLECTIVE AND NONREFLECTIVE SIGN SHEETING. (REV 7-6-00) (FA 7-25-00) (1-01) SECTION 994 (Pages 964-973) is deleted and the following substituted: |
D9940000 | All Jobs |
|
995 DEMOUNTABLE SIGN FACE MATERIALS-CERTIFICATION. (REV 11-27-00) (FA 3-7-01) (1-02) ARTICLE 995-3 (Page 976) is deleted and the following substituted: |
D9950003 | All Jobs |
|
996 PORCELAIN ENAMEL LAMINATED ALUMINUM SIGN PANELS-CERTIFICATION. (REV 1-8-01) (FA 3-28-01) (1-02) SECTION 996 (Pages 976-980) is expanded by the following: |
D9960006 | All Jobs |
| APPENDICES | DAPENDIC | All Jobs |
|
|
DMBE0001 | All Jobs |
|
MANDATORY REVISION
ADD THIS APPENDIX
SPECIAL PROVISIONS FOR DISADVANTAGED
BUSINESS ENTERPRISES |
DMBE0001 | All Jobs |
|
AFFIRMATIVE ACTION REQUIREMENTS. |
DAFFIRM | All Jobs |
|
SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY
RESPONSIBILITIES APPLICABLE TO CONSTRUCTION AND MAINTENANCE CONTRACTS |
DEEORESP | Non-Federal Aid Projects |