Specifications and Estimates
Implemented Modifications to the 2013 Standard Specifications
January 2013 Workbook
for Lettings Effective January - June 2013
Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
History of Revisions - To review the History of revisions for this Workbook.
Mandatory Revisions - Critical modifications implemented for the Workbook.
Mandatory Revision #5 - To review the implementation letter.
Mandatory Revision #4 - To review the implementation letter.
Mandatory Revision #3 - To review the implementation letter.
Mandatory Revision #2 - To review the implementation letter.
Mandatory Revision #1 - To review the implementation letter.
Workbook Document - Final - To review the changes to the Workbook.
Workbook Document - Draft - To review the Workbook.
Note: These files are in Adobe Acrobat (PDF) format.
File size ranges from 9 kb to 279 kb.
| SPECIAL PROVISIONS | SP0000001 | All Jobs | |
|---|---|---|---|
|
EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK. (REV 7-5-12) (7-26-12) (1-13) Insert Information Required. Change(s) to: 2-4. |
SP0020400 | All Jobs, (add a phone number or e-mail address) | |
|
PREPARATION OF PROPOSALS. (REV 6-22-04) (FA 7-13-04) (1-05) Change(s) to: 2-5.1. |
SP0020501AB | A+B Bidding. Use with the approval of the Chief Engineer. Use with SP0030100AB, SP0030203AB,SP0081300AB and SP0080701AB |
|
|
PREPARATION OF PROPOSALS. (REV 2-21-05) (FA 3-31-05) (1-06) Insert Information Required. Change(s) to: 2-5.1. |
SP0020501LR | Lane Rental. Use with the approval of the Chief Engineer. Use with SP0030100LR, SP0081300LR and SP0081300LRDR |
|
|
CONSIDERATION OF BIDS - SCOPE ALTERNATES. (REV 2-15-07) (7-07) Change(s) to: 3-1. |
SP0030001 | Use with proper authority. Notify Contracts Office on Transmittal Memo. |
|
|
AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) Insert Information Required Change(s) to: 3-1. |
SP0030100AB | A+B Bidding. Use with the approval of the Chief Engineer. Use with SP0020501AB, SP0030203AB,SP0080701AB and SP0081300AB |
|
|
BUDGETARY CONSTRAINTS. (REV 9-26-06) (FA 10-6-06) (1-07) Insert Information Required Change(s) to: 3-1. |
SP0030100BC | Use with proper authority. Notify the Contracts Administration Office on the Transmittal Memo. |
|
|
AWARD AND EXECUTION OF CONTRACT. (REV 5-5-11) (10-20-11) (7-12) Change(s) to: 3-1, 3-2.2, 3-5.1. |
SP0030100DC | District Let Construction Contracts less than
$250,000 and all Maintenance Contracts, excluding Lump Sum |
|
|
AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) Change(s) to: 3-1. |
SP0030100LR | Lane Rental. Use with the approval of the Chief Engineer. Use with SP0020501LR, SP0081300LR and SP0081300LRDR |
|
|
AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) Change(s) to: 3-1. |
SP0030100LS | Lump Sum Projects | |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (7-10) Insert Information Required Change(s) to: 3-2, 3-6, 3-7. |
SP0030200 | When necessary to change standard “Award and Execution” Contracts Office must approve. |
|
|
AWARD OF CONTRACTS - A+B BIDDING (REV 8-22-96) (FA 9-3-96) (1-10) Insert Information Required Change(s) to: 3-2. |
SP0030203AB | A+B Bidding. Use with the approval of the Chief Engineer. Use with SP0020501AB, SP0030100AB,SP0080701AB and SP0081300AB |
|
|
SCOPE OF THE WORK - INTENT OF
CONTRACT. (REV 8-19-09) (FA 8-24-09) (1-10) Insert Information Required. Change(s) to: 4-1. |
SP0040100 | All Jobs, excluding Lump Sum. Do not use with SP0040100SLPQ. |
|
|
SCOPE OF THE WORK. (REV 8-24-10) (FA 10-8-10) (7-11) Insert Information Required. Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4. |
SP0040100LS | All Lump Sum Projects. Do not use with SP0040100SLLS. |
|
|
SCOPE OF THE WORK - INTENT AND SCOPE. (REV 8-24-10) FA 10-8-10) (7-11) Insert Information Required. Change(s) to: 4-14-3.1, 4-3.4, 4-3.9.4. |
SP0040100SLLS | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0040100LS. | |
|
SCOPE OF THE WORK - INTENT AND SCOPE. (REV 9-16-09) (FA 11-9-09) (7-10) Insert Information Required. Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4. |
SP0040100SLPQ | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0040100. | |
|
UNFORESEEABLE WORK. (REV 9-28-98) (1-10) Change(s) to: 4-4. |
SP0040400 | 999-25 | |
|
CONTROL OF THE WORK. (REV 3-15-02) (1-13) Change(s) to: 5-1.1, 5-2, 5-7.6. |
SP0050501LS | Lump Sum Projects | |
|
INSPECTION. (REV 2-10-94) (1-13) Insert Information Required. Change(s) to: 5-9.1 |
SP0050901 | Long bridge jobs (1500 feet or longer); modify to suit | |
|
CONTROL OF MATERIALS. (REV 8-17-09) (FA 8-24-09) (1-10) Change(s) to: 6-1. |
SP0060100LS | Lump Sum Projects | |
|
CONTROL OF MATERIALS - SOURCE OF SUPPLY - STEEL. (REV 10-19-12) (1-13) Change(s) to: 6-5.2. |
SP0060502 | All Jobs (Mandatory #2) | |
|
REQUIREMENTS FOR FEDERAL JOBS - COMPLIANCE WITH FHWA 1273. (REV 7-16-12) (8-2-12) (1-13) Change(s) to: 7-1.1. |
SP0070101 | All Federal Aid Jobs | |
|
PERMITS PROCURED BY THE DEPARTMENT. (REV 8-7-01) (FA 4-14-05) (1-10) Change(s) to: 7-2.1. |
SP0070201A | Jobs with permit(s) procured by DOT | |
|
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S.,
WATERS OF THE U.S. AND WATERS OF THE STATE. (REV 7-16-09) (FA 7-30-09) (1-10) Change(s) to: 7-2.2. |
SP0070202 | When DEP Generic Permit is required | |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 8-22-12) (1-13) Insert Information Required. Change(s) to: 7-7.1, 7-13.2, 7-13.3. |
SP0070701DC | District Let Contracts less than $250,000 and all Maintenance Contracts. | |
|
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY. (REV 11-5-10) (FA 11-9-10) (7-11) Change(s) to: 7-11.5. |
SP0071105 | Projects Involving CSX Transportation. | |
|
UTILITY WORK. (REV 2-10-94) (1-10) Change(s) to: 7-11.6.3. |
SP0071163A | When there are no utility work schedules | |
|
UTILITY SCHEDULES. (REV 8-27-01) (FA 4-14-05) (1-10) Change(s) to: 7-11.6.3. |
SP0071163B | When there are utility work schedules | |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 12-21-09) (FA 12-28-09) (7-10) Insert Information Required. Change(s) to: 7-16. |
SP0071600 | All Federal Aid Jobs | |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - DISADVANTAGED BUSINESS ENTERPRISE PROGRAM. (REV 10-23-12) (1-13) Change(s) to: 7-24. |
SP0072400 | All Jobs (Mandatory #2) | |
|
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS. (REV 4-25-02) (FA 7-17-02) (1-10) Change(s) to: Section 7-26. |
SP0072600 | Non-Federal Aid Projects | |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS. (REV 6-15-10) (9-10) Change(s) to: Section 7. |
SP0072700 | Non-Federal Aid Projects - Construction Projects Only | |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY. (REV 6-13-11) (FA 6-16-11) (8-11) Change(s) to: Section 7. |
SP0072800 | All Jobs | |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES. (REV 6-17-11) (7-11) Change(s) to: Section 7. |
SP0072900 | All Jobs | |
|
SUBMISSION OF WORKING SCHEDULE. (REV 1-11-11) (FA 5-12-11) (1-12) Change(s) to: 8-3.2. |
SP0080302A | Use only when CPM is authorized by District Construction Engineer. Do not use with SP0080302DC. | |
|
PROSECUTION AND PROGRESS. (REV 6-18-12) (1-13) Change(s) to: 8-3.2, 8-8, 8-9.1. |
SP0080302DC | District Let Construction Contracts (including Lump Sum) less than $250,000,
and all Maintenance Contracts. Do not use with SP0080302A. |
|
|
PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 2-15-10) (FA 2-17-10) (7-10) Insert Information Required Change(s) to: 8-3.3. |
SP0080303A | When called for by the District Construction Engineer. *Contracts Office must be notified. |
|
|
BEGINNING WORK. (REV 7-10-95) (1-10) Insert Information Required Change(s) to: 8-3.3. |
SP0080303B | When called for by the District Construction Engineer. Use with the approval of the Chief Engineer. | |
|
BEGINNING WORK. (REV 10-22-98) (11-5-98) (1-10) Insert Information Required. Change(s) to: 8-3.3. |
SP0080303C | Only when called for by the District Construction Engineer. Use with the approval of the Chief Engineer. *Contracts Office must be notified. |
|
|
PROSECUTION OF WORK - PARTNERING. (REV 5-5-12) (FA 5-21-12) (1-13) Insert Information Required. Change(s) to: 8-3.3. |
SP0080306 | 999-16* *Contracts Office must be notified |
|
|
PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 1-4-11) (FA 1-21-11) (7-11) Change(s) to: 8-3. |
SP0080307DRB | 999-20 Items Contracts Office must be notified |
|
|
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD. (REV 1-4-11) (FA 1-21-11) (7-11) Change(s) to: 8-3. |
SP0080307RDRB | Jobs without 999-20 Items | |
|
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD. (REV 1-4-11) (FA 1-21-11) (7-11) Change(s) to: 8-3. |
SP0080308SDRB | 334, 337, 350, 570, 580 or 649 Items. | |
|
PROSECUTION AND PROGRESS. (REV 8-1-00) (1-10) Change(s) to: 8-4.1, 8-7.3.1. |
SP0080401LS | Lump Sum Projects | |
|
LIMITATIONS OF OPERATIONS - FENCING. (REV 6-17-04) (FA 7-13-04) (1-10) Change(s) to: 8-4.8. |
SP0080408 | Jobs on Limited Access Highways | |
|
CONTAMINATED MATERIAL - MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (7-11) Insert Information Required. Change(s) to: 8-4.9. |
SP0080409 | Jobs with Lighting* | |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (1-10) Insert Information Required. Change(s) to: 8-7.1. |
SP0080701A | Use when requested by proper authority, (must be modified) | |
|
COMPUTATION OF CONTRACT TIME. (REV 7-24-96) (FA 9-3-96) (1-10) Change(s) to: 8-7.1. |
SP0080701AB | A+B Bidding. Use with the approval of the Chief Engineer. Use with SP0020501AB, SP0030100AB,SP0030203AB and SP0081300AB | |
|
COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (1-10) Insert Information Required. Change(s) to: 8-7.1. |
SP0080701B | Use with the approval of the Chief Engineer. | |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (1-10) Change(s) to: 8-7.1. |
SP0080701C | Use when requested by the District Construction Engineer. | |
|
DAMAGE RECOVERY. (REV 2-4-04) (1-10) Insert Information Required. Change(s) to: Section 8. |
SP0081300 | Use when requested by the District Construction Engineer. (Do not use with Lane Rental) | |
|
PROSECUTION AND PROGRESS. (REV 7-28-97) (1-10) Change(s) to: Section 8. |
SP0081300A | All Jobs with Alternative Bidding. Use with the approval of the Chief Engineer. | |
|
8-13. Incentive - Disincentive for A+B. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300AB | A+B Bidding. Use with the approval of the Chief Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB and SP0080701AB | |
|
8-13. "Bonus" Payment and Waiver of Contractor Claims. (REV 5-19-04) (FA 7-13-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300ABB | A+B Jobs with Bonus Use with the approval of the Chief Engineer. | |
|
8-13. " Bonus " Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300B | Bonus (Date Specific) Use with the approval of the Chief Engineer. | |
|
8-13. "Bonus" Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300BCD | Bonus (Calendar Days) Use with the approval of the Chief Engineer. | |
|
8-13. Incentive - Disincentive. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300ID | Incentive - Disincentive. Use with the approval of the Chief Engineer. Do not use with SP0081300MID. | |
|
8-13. Incentive - Disincentive for Lane Rental Days. (REV 9-25-03) (FA 12-24-03) (7-04) Insert Information Required. Change(s) to: 8-13. |
SP0081300IDLR | Incentive-Disincentive for Lane Rental Days. Use with the approval of the Chief Engineer. Do not use with SP0081300LR or SP0081300LRDR | |
|
8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert Information Required. Change(s) to: 8-13. |
SP0081300LQS | Liquated Savings. Use with the approval of the Chief Engineer. | |
|
8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) Insert Information Required. Change(s) to: 8-13. |
SP0081300LR | Lane Rental. Use with the approval of the Chief Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LRDR. | |
|
8-13. Damage Recovery. (REV 9-25-03) (FA 12-24-03) (7-04) Insert Information Required. Change(s) to: 8-13. |
SP0081300LRDR | Lane Rental. Use with the approval of the Chief Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LR. | |
|
8-13. "Bonus" Payment and Waiver of Contractor Claims. (REV 4-12-06) (FA 4-25-06) (1-07) Insert Information Required. Change(s) to: 8-13. |
SP0081300MB | Milestone Bonus Use with the approval of the Chief Engineer. Do not use with SP0081300B or SP0081300BCD | |
|
8-13. Incentive - Disincentive. (REV 2-9-06) (FA 4-25-06) (1-07) Insert Information Required. Change(s) to: 8-13. |
SP0081300MID | Milestone Incentive-Disincentive. Use with the approval of the Chief Engineer. Do not use with SP0081300ID | |
|
MEASUREMENT AND PAYMENT. (REV 12-14-11) (FA 1-5-12) (7-12) Change(s) to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11. |
SP0090103LS | Lump Sum Projects. Do not use with SP0090103SLLS. | |
|
MEASUREMENT AND PAYMENT. (REV 2-7-13) (4-13) Change(s) to: 9-1.3, 9-2, 9-3, 9-5.1, 9-8.1, 9-9. |
SP0090103SLLS | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0090103LS. MANDATORY 4 | |
|
MEASUREMENT AND PAYMENT. (REV 2-7-13) (4-13) Change(s) to: 9-1.3.2, 9-2, 9-3.2.3, 9-5.1, 9-8.1, 9-9, 9-11. |
SP0090103SLPQ | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0090501DC. MANDATORY 4 | |
|
MEASUREMENT AND PAYMENT. (REV 10-29-08) (FA 1-16-09) (1-10) Change(s) to: 9-5.1, 9-5.4, 9-9. |
SP0090501DC | District Let Contracts. Excluding Lump Sum Projects. Do not use with SP0090103SLPQ. | |
|
MAINTENANCE OF TRAFFIC. (REV 9-4-12) (FA 9-6-12) (1-13) Change(s) to: 102-13.12. |
SP1021312 | 102-89-17 Items | |
|
ENGINEER'S FIELD OFFICE. (REV 1-4-11) (FA 2-17-11) (1-12) Change(s) to: 109. |
SP1090000 | 109-71 Items | |
|
REMOVAL OF EXISTING STRUCTURES - STRUCTURES TO BE REMOVED. (REV 9-10-07) (FA 2-15-08) (1-10) Insert Information Required. Change(s) to: 110-6.1. |
SP1100601 | Use when requested by proper authority (Must have signed agreement with Local Agency). | |
|
REMOVAL OF EXISTING STRUCTURES. (REV 5-13-05) (FA 8-18-05) (1-10) Change(s) to: 110-6.6. |
SP1100606 | Use when areas of Asbestos Abatement are identified in the Plans | |
|
MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (1-10) Change(s) to: 110-11.2, 110-12.7. |
SP1101102 | 110-84 | |
|
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (1-10) Change(s) to: 120-1. |
SP1200100A | Use when contaminated areas are delineated in the plans | |
|
EXCAVATION AND EMBANKMENT - ACCEPTANCE PROGRAM (REV 9-16-09) (FA 11-9-09) (7-10) Change(s) to: 120-10.3.1. |
SP1201003SL | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use. | |
|
EXCAVATION FOR STRUCTURES AND PIPE - ACCEPTANCE PROGRAM (REV 9-16-09) (FA 11-9-09) (7-10) Change(s) to: 125-9.3.1. |
SP1250903SL | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use. | |
|
STABILIZING - ACCEPTANCE PROGRAM (REV 9-16-09) (FA 11-9-09) (7-10) Change(s) to: 160-4.2.4. |
SP1600402SL | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use. | |
|
PREDESIGNED STABILIZED SUBGRADE. (REV 3-12-07) (FA 3-14-07) (1-10) Change(s) to: 161. |
SP1610000 | Non-Traffic and Shoulder-Only Construction. Do Not Use on Widening Projects | |
|
ROCK BASE - ACCEPTANCE PROGRAM (REV 9-16-09) (FA 11-9-09) (7-10) Change(s) to: 200-7.2.2 |
SP2000702SL | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use. | |
|
GRADED AGGREGATE BASE.
(REV 8-8-07) (1-10) Change(s) to: 204. |
SP2040000 | Non-FA Jobs with 285 Items | |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-10) Insert Information Required. Change(s) to: 327-1, 327-6. |
SP3270100 | When the plans provide a location for stockpiling milled material.Insert quantity to be retained. Use all, tons, cubic yards | |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (1-10) Change(s) to: 327-2. |
SP3270200 | Use when requested by districts | |
|
PORTLAND CEMENT CONCRETE - ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA 7-8-10) (1-11) Change(s) to: 346-9.2. |
SP3460902SL | All Projects less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use. | |
|
Structures Foundations - Dynamic Testing WITHOUT Test Piles. (REV 6-26-12) (7-12) Change(s) to: 455-1 through 455-12. |
SP4550100DTwoTP | Projects with 100% Dynamic Testing of Pile Foundations WITHOUT Test Piles. | |
|
Structures Foundations - Dynamic Testing WITH Test Piles. (REV 6-26-12) (7-12) Change(s) to: 455-1 through 455-12. |
SP4550100DTwTP | Projects with 100% Dynamic Testing of Pile Foundations WITH Test Piles. | |
|
INTEGRAL PILE JACKETS. (REV 11-16-11) (FA 12-8-11) (7-12) Change(s) to: 457. |
SP4570000 | 457 Items | |
|
STRUCTURAL STEEL AND MISCELLANEOUS METALS. (REV 1-25-12) (7-12) Change(s) to: 460-7.2, 460-8.8. |
SP4600702 | 460 Items | |
|
CRASH CUSHIONS. (REV 8-4-11) (FA 8-9-11) (1-12) Change(s) to: 544-4. |
SP5440400 | 544-75-1AA Items | |
|
LANDSCAPE INSTALLATION. (REV 3-15-13) (4-13) Change(s) to: 580-2. |
SP5800200 | All Federal Aid Jobs (Mandatory #5) | |
|
MOTORIST AID CALL BOX RELOCATION. (REV 8-24-10) (1-11) Change(s) to: 714. |
SP7140000 | 714-1-500 | |
|
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 1-3-12) (FA 1-27-12) (7-12) Change(s) to: 741. |
SP7410000 | 741-1 Items | |
|
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (1-10) Change(s) to: 743. |
SP7430000 | 743-70 Items | |
|
TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV 10-22-10) (FA 11-22-10) (7-11) Change(s) to: 744. |
SP7440000 | 744-70 Items | |
|
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 6-22-10) (FA 11-22-10) (7-11) Change(s) to: 745. |
SP7450000 | 745-70 Items | |
|
TRAFFIC MONITORING SITE CABINET. (REV 5-6-08) (FA 10-14-08) (1-10) Change(s) to: 746. |
SP7460000 | 746-7A-BCD | |
|
TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (1-10) Change(s) to: 747. |
SP7470000 | 747-70 Items | |
|
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE
EQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (1-10) Change(s) to: 748. |
SP7480000 | Jobs with Traffic Monitoring Sites | |
|
STRUCTURAL COATING MATERIALS. (REV 1-25-12) (7-12) Change(s) to: 975-6.1. |
SP9750601 | 460 Items | |
| Supplemental Specifications | SS0000001 | All Jobs | |
|
005
CONTROL OF THE WORK. (REV 12-16-11) (1-13) Change(s) to: 005. |
SS0050000 | All Jobs (Mandatory #3) | |
|
102
MAINTENANCE OF TRAFFIC. (REV 10-9-12) (1-13) Change(s) to: 102. |
SS1020000 | All Jobs (Mandatory #1) | |
|
346 PORTLAND CEMENT CONCRETE. (REV 10-9-12) (1-13) Change(s) to: 346. |
SS3460000 | All Jobs (Mandatory #1) | |
|
347 PORTLAND CEMENT CONCRETE - CLASS NS. (REV 10-9-12) (1-13) Change(s) to: 347. |
SS3470000 | All Jobs (Mandatory #1) | |
|
400 CONCRETE STRUCTURES. (REV 10-9-12) (1-13) Change(s) to: 400. |
SS4000000 | All Jobs (Mandatory #1) | |
|
425 INLETS, MANHOLES, AND JUNCTION BOXES. (REV 10-9-12) (1-13) Change(s) to: 425. |
SS4250000 | All Jobs (Mandatory #1) | |
|
TECHNICAL SPECIAL PROVISIONS.
The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package. Insert # ________ |
TSPs | Jobs with TSPs | |