Specifications and Estimates
Implemented Modifications to the 2010 Standard Specifications
January 2010 Workbook
for Lettings Effective January 2010 - June 2010
Special Provisions - Specific clauses adding to or revising the Standard Specifications,setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Change Table - Shows all changes made to the Specifications within this workbook.
History of Revisions - To review the History of revisions for this Workbook.
Mandatory Revisions - Critical modifications implemented for the Workbook.
Mandatory Revision #3 - To review the implementation letter.
Mandatory Revision #2 - To review the implementation letter.
Mandatory Revision #1 - To review the implementation letter.
Workbook Document - To review the Workbook.
Note: These files are in Adobe Acrobat (PDF) format. File size ranges from 9 kb to 279 kb.
| SPECIAL PROVISIONS | SP0000001 | All Jobs |
|---|---|---|
| EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK. (REV 2-7-08) (FA 2-13-08) (7-08) Insert Information Required. Change(s) to: 2-4. |
SP0020400 | All Jobs, (add a phone number or e-mail address) |
|
PREPARATION OF PROPOSALS. (REV 6-22-04) (FA 7-13-04) (1-05) Change(s) to: 2-5.1. |
SP0020501AB | A+B Bidding. (Use with proper authority). Use with SP0030100AB, SP0030203,SP0081300AB and SP0080701AB |
|
PREPARATION OF PROPOSALS. (REV 2-21-05) (FA 3-31-05) (1-06) Insert Information Required. Change(s) to: 2-5.1. |
SP0020501LR | Lane Rental. (Use with proper authority). Use with SP0030100LR, SP0081300LR and SP0081300LRDR |
|
CONSIDERATION OF BIDS - SCOPE ALTERNATES. (REV 2-15-07) (1-10) Change(s) to: 3-1. |
SP0030001 | (Use with proper authority.) *Notify Contracts Office on Transmittal Memo. |
|
AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) Insert Information Required Change(s) to: 3-1. |
SP0030100AB | A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030203,SP0080701AB and SP0081300AB |
|
BUDGETARY CONSTRAINTS. (REV 9-26-06) (FA 10-6-06) (1-07) Insert Information Required Change(s) to: 3-1. |
SP0030100BC | Use on Projects over $25 M. Notify the Contracts Administration Office on the Transmittal Memo. |
|
AWARD AND EXECUTION OF CONTRACT. (REV 6-22-07) (7-07) Insert Information Required Change(s) to: 3-1. |
SP0030100DC | All District Let and Maintenance Contracts excluding Lump Sum |
|
AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) Change(s) to: 3-1. |
SP0030100LR | Lane Rental. (Use with proper authority). Use with SP0020501LR, SP0081300LR and SP0081300LRDR |
|
AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) Change(s) to: 3-1. |
SP0030100LS | Lump Sum Projects |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (1-02) Insert Information Required Change(s) to: 3-2, 3-6, 3-7. |
SP0030200 | When necessary to change standard “Award and Execution”* *Contracts Office must approve |
|
AWARD AND EXECUTION OF CONTRACT. (REV 2-7-97) (7-00) Change(s) to: 3-2.1, 3-2.2, 3-4, 3-7 |
SP0030201 | Bid Average Method (Use with proper authority) |
|
AWARD AND EXECUTION. (REV 8-22-96) (FA 9-3-96) (1-10) Insert Information Required Change(s) to: 3-2. |
SP0030203 | A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030100AB,SP0080701AB and SP0081300AB |
|
SCOPE OF THE WORK - INTENT AND SCOPE. (REV 8-19-09) (FA 8-24-09) (1-10) Insert Information Required. Change(s) to: 4-1. |
SP0040100 | All Jobs, except Lump Sum |
|
INTENT AND SCOPE. (REV 8-19-09) (1-10) Insert Information Required. Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4. |
SP0040100LS | All Lump Sum Projects |
|
SCOPE OF THE WORK. (REV 7-20-06) (1-07) Change(s) to: 4-1. |
SP0040100M | All Metric Jobs |
|
VALUE ENGINEERING INCENTIVE. (REV 8-12-96) (FA 7-2-97) (1-10) Change(s) to: 4-3.9. |
SP0040309DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
|
UNFORESEEABLE WORK. (REV 9-28-98) (1-10) Change(s) to: 4-4. |
SP0040400 | 999-25 |
|
CONTROL OF THE WORK. (REV 3-15-02) (1-10) Change(s) to: 5-1.1, 5-2, 5-7.6. |
SP0050501LS | Lump Sum Projects |
|
INSPECTION. (REV 2-10-94) (1-10) Insert Information Required. Change(s) to: 5-9.1 |
SP0050901 | Long bridge jobs (1500 feet or longer); modify to suit |
|
CONTROL OF MATERIALS. (REV 8-17-09) (FA 8-24-09) (1-10) Change(s) to: 6-1. |
SP0060100LS | Lump Sum Projects |
|
REQUIREMENTS FOR FEDERAL JOBS - COMPLIANCE WITH FHWA 1273. (REV 7-28-09) (FA 7-30-09) (1-10) Change(s) to: 7-1.1. |
SP0070101 | All Federal Aid Jobs |
|
LAWS TO BE OBSERVED. (REV 3-31-09) (FA 6-17-09) (1-10) Change(s) to: 7-1.1.1. |
SP0070111ES | All American Recovery and Reinvestment Act of 2009 Jobs |
|
PERMITS PROCURED BY THE DEPARTMENT. (REV 8-7-01) (FA 4-14-05) (1-10) Change(s) to: 7-2.1. |
SP0070201A | Jobs with permit(s) procured by DOT |
|
PERMITS PROCURED BY THE CONTRACTOR. (REV 12-18-00) (FA 4-14-05) (1-10) Change(s) to: 7-2.1. |
SP0070201B | Jobs with buildings |
|
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S.,
WATERS OF THE U.S. AND WATERS OF THE STATE. (REV 7-16-09) (FA 7-30-09) (1-10) Change(s) to: 7-2.2. |
SP0070202 | When DEP Generic Permit is required |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 1-9-01) (1-10) Insert Information Required. Change(s) to: 7-7.1, 7-13.2, 7-13.3. |
SP0070701DC | District Let Contracts less than $250,000 and all Maintenance Contracts. |
|
USE OF EXPLOSIVES. (REV 9-26-94) (1-10) Change(s) to: 7-9. |
SP0070900 | When explosives are prohibited |
|
UTILITY WORK. (REV 2-10-94) (1-10) Change(s) to: 7-11.6.3. |
SP0071163A | When there are no utility work schedules |
|
UTILITY SCHEDULES. (REV 8-27-01) (FA 4-14-05) (1-10) Change(s) to: 7-11.6.3. |
SP0071163B | When there are utility work schedules |
|
WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 1-3-03) (FA 5-16-03) (1-10) Insert Information Required. Change(s) to: 7-16. |
SP0071600 | All Federal Aid Jobs |
|
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS. (REV 4-25-02) (FA 7-17-02) (1-10) Change(s) to: Section 7-26. |
SP0072600 | Non-Federal Aid Projects |
|
SUBMISSION OF WORKING SCHEDULE. (REV 6-3-09) (FA 6-10-09) (1-10) Change(s) to: 8-3.2. |
SP0080302A | Use only when CPM is authorized by District Construction Engineer. Do not use with SP0080302DC. |
|
PROSECUTION AND PROGRESS. (REV 2-27-01) (1-10) Change(s) to: 8-3.2, 8-8, 8-9.1. |
SP0080302DC | District Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts. Do not use with SP0080302A. |
|
Mandatory Revision No.1 PROSECUTION OF WORK - Beginning Work. (REV 9-18-09) ((1-10) Change(s) to: 8-3.3. |
SP0080303 | All Jobs |
|
PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 2-24-04) (FA 4-23-04) (1-10) Insert Information Required Change(s) to: 8-3.3. |
SP0080303A | When called for.* Do not use with SP0080303. *Contracts Office must be notified. |
|
BEGINNING WORK.
(REV 7-10-95) (1-10) Insert Information Required Change(s) to: 8-3.3. |
SP0080303B | When called for by the District Construction Engineer |
|
BEGINNING WORK. (REV 10-22-98) (11-5-98) (1-10) Insert Information Required. Change(s) to: 8-3.3. |
SP0080303C | Only when called for by the District Construction Engineer. *Contracts Office must be notified. |
|
PROSECUTION OF WORK - PARTNERING. (REV 3-4-98) (FA 5-26-98) (7-10) Insert Information Required. Change(s) to: 8-3.3. |
SP0080306 | 999-16* *Contracts Office must be notified |
|
PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 11-19-02) (FA 3-5-03) (1-10) Change(s) to: 8-3. |
SP0080307DRB | 999-20* *Contracts Office must be notified |
|
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD. (REV 4-1-02) (FA 12-12-02) (1-10) Change(s) to: 8-3. |
SP0080307RDRB | Jobs without 999-20 |
|
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD. (REV 6-23-03) (FA 8-1-03) (1-10) Change(s) to: 8-3. |
SP0080307SDRB | Jobs with Asphalt Pavement, concrete pavement, landscape installation,or performance turf |
|
PROSECUTION AND PROGRESS. (REV 8-1-00) (1-10) Change(s) to: 8-4.1, 8-7.3.1. |
SP0080401LS | Lump Sum Projects |
|
LIMITATIONS OF OPERATIONS - FENCING. (REV 6-17-04) (FA 7-13-04) (1-10) Change(s) to: 8-4.8. |
SP0080408 | Jobs on Limited Access Highways |
|
HAZARDOUS OR TOXIC WASTE - MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (1-10) Insert Information Required. Change(s) to: 8-4.9. |
SP0080409 | Jobs with Lighting* |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (1-10) Insert Information Required. Change(s) to: 8-7.1. |
SP0080701A | Use when requested by proper authority, (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 7-24-96) (FA 9-3-96) (1-10) Change(s) to: 8-7.1. |
SP0080701AB | A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030100AB,SP0030203 and SP0081300AB |
|
COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (1-10) Insert Information Required. Change(s) to: 8-7.1. |
SP0080701B | Only when called for (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (1-10) Change(s) to: 8-7.1. |
SP0080701C | Use when requested by proper authority |
|
DAMAGE RECOVERY. (REV 2-4-04) (1-10) Insert Information Required. Change(s) to: Section 8. |
SP0081300 | Use when requested by proper authority (Do not use with Lane Rental) |
|
PROSECUTION AND PROGRESS. (REV 7-28-97) (1-10) Change(s) to: Section 8. |
SP0081300A | All Jobs with Alternative Bidding. (Use with proper authority |
|
8-13. Incentive - Disincentive for A+B. (REV 7-27-04) (FA 7-28-04) (1-10) Insert Information Required. Change(s) to: 8-13. |
SP0081300AB | A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030100AB, SP0030203 and SP0080701AB |
|
8-13. "Bonus" Payment and Waiver of Contractor Claims. (REV 5-19-04) (FA 7-13-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300ABB | A+B Jobs with Bonus (Use with proper authority) |
|
8-13. " Bonus " Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300B | Bonus (Date Specific) (Use with proper authority |
|
8-13. "Bonus" Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300BCD | Bonus (Calendar Days) (Use with proper authority |
|
8-13. Incentive - Disincentive. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Change(s) to: 8-13. |
SP0081300ID | Incentive - Disincentive. (Use with proper authority) |
|
8-13. Incentive - Disincentive for Lane Rental Days. (REV 9-25-03) (FA 12-24-03) (7-04) Insert Information Required. Change(s) to: 8-13. |
SP0081300IDLR | Incentive-Disincentive for Lane Rental Days. (Use with proper authority). Do not use with SP00800LR or SP0081300LRDR |
|
8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert Information Required. Change(s) to: 8-13. |
SP0081300LQS | Liquated Savings. (Use with proper authority) |
|
8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) Insert Information Required. Change(s) to: 8-13. |
SP0081300LR | Lane Rental. (Use with proper authority) |
|
8-13. Damage Recovery. (REV 9-25-03) (FA 12-24-03) (7-04) Insert Information Required. Change(s) to: 8-13. |
SP0081300LRDR | Lane Rental. (Use with proper authority) |
|
8-13. "Bonus" Payment and Waiver of Contractor Claims. (REV 4-12-06) (FA 4-25-06) (1-07) Insert Information Required. Change(s) to: 8-13. |
SP0081300MB | Milestone Bonus (Use with proper authority). Do not use with SP0081300B or SP0081300BCD |
|
8-13. Incentive - Disincentive. (REV 2-9-06) (FA 4-25-06) (1-07) Insert Information Required. Change(s) to: 8-13. |
SP0081300MID | Milestone Incentive-Disincentive. (Use with proper authority). Do not use with SP0081300ID |
|
MEASUREMENT AND PAYMENT. (REV 10-29-08) (FA 1-27-09) (1-10) Change(s) to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11. |
SP0090103LS | Lump Sum Projects |
|
MEASUREMENT AND PAYMENT. (REV 10-29-08) (FA 1-16-09) (1-10) Change(s) to: 9-5.1, 9-5.4, 9-9. |
SP0090501DC | District Let Contracts. Excluding Lump Sum Projects |
|
PARTIAL PAYMENTS - WITHHOLDING PAYMENT. (REV 2-11-09) (FA 6-16-09) (1-10) Change(s) to: 9-5.3. |
SP0090503ES | All American Recovery and Reinvestment Act of 2009 Jobs |
|
MEASUREMENT AND PAYMENT - ACCEPTANCE AND FINAL PAYMENT DOCUMENTS. (REV 6-10-09) (FA 6-16-09) (1-10) Change(s) to: 9-8.1. |
SP0090801ES | All American Recovery and Reinvestment Act of 2009 Jobs |
|
ENGINEER'S FIELD OFFICE. (REV 5-1-02) (FA 5-14-02) (1-10) Change(s) to: 109. |
SP1090000 | 109-71 |
|
REMOVAL OF EXISTING BULKHEAD. (REV 7-10-95) (FA 6-21-99) (1-10) Change(s) to: 110-1, 110-11.8, 110-12.7. |
SP1100100 | 110-73 |
|
REMOVAL OF EXISTING STRUCTURES - STRUCTURES TO BE REMOVED. (REV 9-10-07) (FA 2-15-08) (1-10) Insert Information Required. Change(s) to: 110-6.1. |
SP1100601 | Use when requested by proper authority (must have signed agreement with Local Agency). |
|
REMOVAL OF EXISTING STRUCTURES. (REV 5-13-05) (FA 8-18-05) (1-10) Change(s) to: 110-6.6. |
SP1100606 | Use when areas of Asbestos Abatement are identified in the Plans |
|
MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (1-10) Change(s) to: 110-11.2, 110-12.7. |
SP1101102 | 110-84 |
|
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (1-10) Change(s) to: 120-1. |
SP1200100A | Use when contaminated areas are delineated in the plans |
|
FILL GRAVEL. (REV 3-11-96) (1-10) Change(s) to: 120-1, 120-12, 120-13, 120-14.4. |
SP1200100B | 120-72 plan details required |
|
FILL SAND. (REV 1-3-94) (1-10) Change(s) to: 142. |
SP1420000 | 142-70 (Plans to cover Material and Placement) |
|
STABILIZED SUBBASE UNDER CONCRETE (REV 1-3-94) (1-10) Change(s) to: 160-3. |
SP1600300 | Only when called for |
|
PREDESIGNED STABILIZED SUBGRADE. (REV 3-12-07) (FA 3-14-07) (1-10) Change(s) to: 161. |
SP1610000 | Non-Traffic and Shoulder-Only Construction. Do Not Use on Widening Projects |
|
GRADED AGGREGATE BASE.
(REV 8-8-07) (1-10)
Change(s) to: 204. |
SP2040000 | Non-FA Jobs with 285-7 pay item. |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-10) Insert Information Required. Change(s) to: 327-1, 327-6. |
SP3270100 | When the plans provide a location for stockpiling milled material.Insert quantity to be retained. Use all, tons, cubic yards |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (1-10) Change(s) to: 327-2. |
SP3270200 | Use when requested by districts |
|
COMPOSITE PANEL SUPPORT REPAIR. (REV 12-10-93) (1-10) Change(s) to: 400. |
SP4000000 | 400-128 |
|
PRECAST BULKHEAD PANELS. (REV 7-10-95) (1-10) Change(s) to: 400-22.1, 400-23.9. |
SP4002201 | 400-72 (requires plan details) |
|
REPLACE GRATES. (REV 2-3-94) (1-10) Change(s) to: 425-1, 425-8. |
SP4250100 | 425-82 (requires plan details) |
|
DEEP DRAINAGE WELLS. (REV 11-9-93) (1-10) Change(s) to: 444. |
SP4440000 | 444-70; 444-71 |
|
STRUCTURES FOUNDATIONS - PILING.
(REV 8-6-09) (FA 8-27-09) (1-10)
Change(s) to: 455-5.10, 455-5.11, 455-5.12, 455-7.2, 455-7.8, 455-11, 455-12. |
SP4550510A | All Bridge projects with square, prestressed concrete pile foundations, with test piles |
|
STRUCTURES FOUNDATIONS - PILING.
(REV 8-6-09) (FA 8-27-09) (1-10)
Change(s) to: 455-5.10, 455-5.11, 455-5.14, 455-7.2, 455-7.8, 455-11, 455-12. |
SP4550510B | All Bridge projects with square, prestressed concrete pile foundations, without test piles |
|
INTEGRAL PILE JACKETS.
(REV 6-20-08) (FA 6-26-08) (1-10)
Change(s) to: 457. |
SP4570000 | 457-70 |
|
BARRIER WALL REMOVAL (CONCRETE). (REV 7-10-95) (1-10) Change(s) to: 521-1. |
SP5210100 | 521-73 (plan details required) |
|
OPAQUE VISUAL BARRIER. (REV 4-13-94) (1-10) Change(s) to: 539. |
SP5390000 | 539-80 (requires plan details) |
|
FENCING. (REV 1-6-98) (1-10) Change(s) to: 550-2, 550-3.5, 550-6.2. |
SP5500200 | Type A fencing on non-NHS Projects only |
|
Mandatory Revision No.2 TRAFFIC STRIPES AND MARKINGS - TWO REACTIVE COMPONENTS. (REV 9-24-09) ((1-10) Change(s) to: 709. |
SP7090000 | All Jobs |
|
MOTORIST AID CALL BOX RELOCATION. (REV 11-30-00) (FA 2-2-01) (1-10) Change(s) to: 714. |
SP7140000 | 714-1, 400-2, (requires plan details) |
|
Mandatory Revision No.3 Highway Lighting System - Method of Measurement. (REV 1-22-10) (3-10) Change(s) to: 715-16(k). |
SP7151600 | 715-19-1XX High Mast Light Pole, Complete, Pay Items |
|
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 6-16-99) (FA 7-20-99) (1-10) Change(s) to: 741. |
SP7410000 | 741-70 |
|
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (1-10) Change(s) to: 743. |
SP7430000 | 743-70 |
|
TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV 6-16-99) (FA 7-20-99) (1-10) Change(s) to: 744. |
SP7440000 | 744-70 |
|
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 10-25-01) (FA 12-21-01) (1-10) Change(s) to: 745. |
SP7450000 | 745-70 |
|
TRAFFIC MONITORING SITE CABINET. (REV 5-6-08) (FA 10-14-08) (1-10) Change(s) to: 746. |
SP7460000 | 746-7 |
|
TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (1-10) Change(s) to: 747. |
SP7470000 | 747 Items |
|
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE
EQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (1-10) Change(s) to: 748. |
SP7480000 | Jobs with Traffic Monitoring Sites |
|
TRANSPORTATION ENHANCEMENT PROJECTS. (REV 8-6-96) (FA 12-10-96) (1-10) Change(s) to: 120-9.2, 200-7.2, 330-11.3, 330-13. |
SPXENHANCE | For non-vehicular enhancement projects only |
| Supplemental Specifications | SS0000001 | All Jobs |
|
PREQUALIFICATION OF BIDDERS.
(REV 8-10-09) (FA 8-13-09) (1-10)
Change(s) to: 2-1. |
SS0020100 | All Jobs |
|
EXECUTION OF CONTRACT BOND.
(REV 8-10-09) (FA 8-13-09) (1-10)
Change(s) to: 3-5.1, 3-6, 3-7. |
SS0030600 | All Jobs |
|
SCOPE OF WORK.
(REV 7-28-09) (FA 7-30-09) (1-10)
Change(s) to: 4-3.9.6, 4-6 |
SS0040309 | All Jobs |
|
006 DEFECTIVE MATERIALS. (REV 8-5-09) (FA 8-11-09) (1-10) Change(s) to: 6-4. |
SS0060400 | All Jobs |
|
007 LEGAL REQUIREMENTS AND RESPONSIBILITY TO
THE PUBLIC. (REV 7-16-09) (FA 7-30-09) (1-10) Change(s) to: 7.1.4, 7-11.4, 7-25. |
SS0070104 | All Jobs |
|
009 MEASUREMENT AND PAYMENT. (REV 7-25-06) (FA 7-27-06) (1-10) Change(s) to: 9-2.1.1. |
SS0090211 | All Jobs Excluding Lump Sum |
|
102
MAINTENANCE OF TRAFFIC. (REV 8-4-09) (FA 8-11-09) (1-10) Change(s) to: 102-2, 102-5, 102-7, 102-9, 102-10,102-11, 102-13. |
SS1020000 | All Jobs |
|
104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION
AND WATER POLLUTION. (REV 6-23-09) (FA 7-9-09) (1-10) Change(s) to: 104-6, 104-7, 104-8, 104-9, 104-10. |
SS1040600 | All Jobs |
|
105 CONTRACTOR QUALITY CONTROL. (REV 7-29-09) (FA 8-11-09) (1-10) Change(s) to: 105-3, 105-5, 105-6, 105-8. |
SS1050302 | All Jobs |
|
110 CLEARING AND GRUBBING. (REV 5-29-09) (FA 7-15-09) (1-10) Change(s) to 110-6.2.1. |
SS1100602 | All Jobs |
|
120 EXCAVATION AND EMBANKMENT. (REV 8-5-09) (FA 8-13-09) (1-10) Change(s) to: 120-8.1, 120-10.1.7, 120-10.3.1. |
SS1200800 | All Jobs |
|
125 EXCAVATION FOR STRUCTURES AND PIPE. (REV 6-3-09) (FA 8-13-09) (1-10) Change(s) to: 125-9.1. |
SS1250901 | All Jobs |
|
234 SUPERPAVE ASPHALT BASE-THICKNESS REQUIREMENTS. (REV 7-29-09) (FA 8-11-09) (1-10) Change(s) to: 234-8.1. |
SS2340801 | All Jobs |
|
300 APPLICATION OF TACK COAT - RATE OF APPLICATION. (REV 7-29-09) (FA 8-11-09) (1-10) Change(s) to: 300-8.4. |
SS3000804 | All Jobs |
|
320 PAVING EQUIPMENT.
(REV 7-29-09) (FA 8-11-09) (1-10)
Change(s) to: 320-5.1.2, 320-5.3.1. |
SS3200500 | All Jobs |
|
330 HOT BITUMINOUS MIXTURES
- GENERAL CONSTRUCTION REQUIREMENTS.
(REV 7-29-09) (FA 8-11-09) (1-10)
Change(s) to: 330-2, 330-3, 330-4, 330-6, 330-7, 330-8, 330-12. |
SS3300000 | All Jobs |
|
334 SUPERPAVE ASPHALT CONCRETE. (REV 7-29-09) (FA 8-11-09) (1-10) Change(s) to:334-2, 334-3, 334-5, 334-5, 334-8. | SS3340000 | All Jobs |
|
336 ASPHALT RUBBER BINDER.
(REV 7-29-09) (FA 8-11-09) (1-10)
Change(s) to: 336-1, 336-2, 336-3, 336-5, 336-6, 336-7, 336-8. |
SS3360000 | All Jobs |
|
337 ASPHALT CONCRETE FRICTION COURSES. (REV 7-29-09) (FA 8-11-09) (1-10) Change(s) to: 337-2, 337-3, 337-6, 337-7. |
SS3370000 | All Jobs |
|
341 ASPHALT RUBBER MEMBRANE INTERLAYER. (REV 7-29-09) (FA 8-11-09) (1-10) Change(s) to: 341-4, 341-5. |
SS3410400 | All Jobs |
|
407 THREE-SIDED PRECAST CULVERT. (REV 12-7-07) (FA 1-10-08) (1-10) Change(s) to: 407. |
SS4070000 | 407-1 |
|
450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION.
(REV 6-5-09) (FA 6-10-09) (1-10)
Change(s) to: 450-10.3.2.3. |
SS4501003 | All Jobs |
|
452 PRECAST SEGMENTAL BRIDGE CONSTRUCTION. (REV 6-4-07) (FA 6-28-07) (1-10) Change(s) to: 452. |
SS4520000 | All Precast Segmental Bridge Jobs |
|
453 EPOXY JOINTING OF PRECAST SEGMENTS. (REV 1-28-03) (FA 2-6-03) (1-10) Change(s) to: 453. |
SS4530000 | Jobs with Segmental Bridges |
|
455 STRUCTURES FOUNDATIONS.
(REV 4-22-09) (FA 6-10-09) (1-10)
Change(s) to: 455-16.4, 455-17.6.1.1. |
SS4551604 | All Jobs |
|
462 POST-TENSIONING. (REV 2-19-09) (FA 5-19-09) (1-10) Change(s) to: 462. |
SS4620000 | 462 Item |
|
527 DETECTABLE WARNINGS ON WALKING SURFACES. (REV 4-7-09) (FA 7-10-09) (1-10) Change(s) to: 527. |
SS5270000 | All Jobs |
|
546 RUMBLE STRIPS. (REV 7-6-09) (FA 8-31-09) (1-10) Change(s) to: 546-2. |
SS5460200 | All Jobs |
|
560 COATING STRUCTURAL STEEL. (REV 6-11-09) (FA 6-25-09) (1-10)
Change(s) to: 560. |
SS5600000 | All Jobs |
|
563 ANTI-GRAFFITI COATING SYSTEM - DESCRIPTION.
(REV 4-27-09) (FA 5-27-09) (1-10)
Change(s) to: 563. |
SS5630100 | All Jobs |
|
611 ACCEPTANCE PROCEDURES.
(REV 8-3-09) (FA 8-4-09) (1-10)
Change(s) to: 611-2.2, 611-5.1. |
SS6110202 | All Jobs |
|
650 VEHICULAR SIGNAL ASSEMBLIES. (REV 6-17-09) (FA 6-18-09) (1-10) Change(s) to: 650-3.7. |
SS6500307 | All Jobs |
|
700 HIGHWAY SIGNING. (REV 6-29-09) (FA 7-1-09) (1-10) Change(s) to: 700. |
SS7000000 | All Jobs |
|
701 AUDIBLE AND
VIBRATORY PAVEMENT MARKINGS.
(REV 5-1-09) (FA 6-24-09) (1-10)
Change(s) to : 701-2.1, 701-4, 701-5, 701-7, 701-8. |
SS7010201 | All Jobs |
|
Mandatory Revision No.2 (REV 5-1-09) (FA 6-25-09) (1-10) Change(s) to: 709-2.1, 709-4.1, 709-4.3, 709-7. |
||
|
710 PAINTED PAVEMENT MARKINGS. (REV 7-9-09) (FA 7-20-09) (1-10) Change(s) to: 710-2, 710-4.1, 710-4.1.1, 710-4.3. |
SS7100200 | All Jobs |
|
711 THERMOPLASTIC TRAFFIC
STRIPES AND MARKINGS.
(REV 5-6-09) (FA 6-24-09) (1-10)
Change(s) to: 711-2.1.2, 711-2.1.3, 711-4.1, 711-4.3, 711-7. |
SS7110201 | All Jobs |
|
713 PERMANENT TAPE
STRIPES AND MARKINGS.
(REV 5-6-09) (FA 6-25-09) (1-10)
Change(s) to: 713-2, 713-4.1, 713-7. |
SS7130200 | All Jobs |
|
715 HIGHWAY LIGHTING SYSTEM. (REV 8-4-09) (FA 8-11-09) (1-10) Change(s) to: 715-1, 715-16. |
SS7150100 | All Jobs |
|
780 INTELLIGENT TRANSPORTATION SYSTEMS-GENERAL
REQUIREMENTS. (REV 8-7-06) (FA 8-15-06) (1-10) Change(s) to: 780. |
SS7800000 | All ITS Jobs |
|
781 INTELLIGENT TRANSPORTATION SYSTEMS-MOTORIST
INFORMATION SYSTEMS. (REV 1-22-09) (FA 2-4-09) (1-10) Change(s) to: 781. |
SS7810000 | 781 Items |
|
782 INTELLIGENT TRANSPORTATION SYSTEMS-VIDEO
EQUIPMENT. (REV 1-22-09) (FA 2-4-09) (1-10) Change(s) to: 782. |
SS7820000 | 782 Items |
|
783 INTELLIGENT TRANSPORTATION SYSTEMS-FIBER
OPTIC CABLE AND INTERCONNECT. (REV 1-22-09) (FA 2-4-09) (1-10) Change(s) to: 783. |
SS7830000 | 783 Items |
|
784 INTELLIGENT TRANSPORTATION SYSTEMS-NETWORK
DEVICES. (REV 1-22-09) (FA 2-4-09) (1-10) Change(s) to: 784. |
SS7840000 | 784 Items |
|
785 INTELLIGENT TRANSPORTATION SYSTEMS-INFRASTRUCTURE. (REV 1-26-09) (FA 2-4-09) (1-10) Change(s) to: 785. |
SS7850000 | 785 Items |
|
786 INTELLIGENT TRANSPORTATION SYSTEMS-VEHICLE
DETECTION AND DATA COLLECTION. (REV 1-28-09) (FA 2-4-09) (1-10) Change(s) to: 786. |
SS7860000 | 786 Items |
|
916 BITUMINOUS MATERIALS. (REV 7-29-09 (FA 8-11-09) (1-10) Change(s) to: 916. |
SS9160000 | All Jobs |
|
919 GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER. (REV 6-22-09) (FA 6-25-09) (1-10) Change(s) to: 919-3. |
SS9190300 | All Jobs |
|
932 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE
PAVEMENT AND CONCRETE STRUCTURES. (REV 5-20-09) (FA 7-15-09) (1-10) Change(s) to: 932-1.2.2.1, 932-1.2.2.2. |
SS9320102 | All Jobs |
|
938 POST-TENSION GROUT.
(REV 5-1-09) (FA 5-19-09) (1-10)
Change(s) to: 938. |
SS9380000 | 462 Items |
|
962 STRUCTURAL STEEL
AND MISCELLANEOUS METAL ITEMS (OTHER THAN ALUMINUM). (REV 6-26-09) (FA 7-10-09) (1-10) Change(s) to: 962-1.2, 962-8.4.2. |
SS9620102 | All Jobs |
|
971 TRAFFIC MARKING MATERIALS. (REV 6-25-09) (FA 6-29-09) (1-10)
Change(s) to: 971 |
SS9710000 | All Jobs |
|
973 STRUCTURAL PLASTICS. (REV 5-11-09) (FA 6-10-09) (1-10) Change(s) to: 973. |
SS9730000 | All Jobs |
|
975 STRUCTURAL COATING
MATERIALS.
(REV 6-11-09) (FA 6-25-09) (1-10)
Change(s) to: 975. |
SS9750000 | All Jobs |
|
990 TEMPORARY TRAFFIC CONTROL DEVICE MATERIALS. (REV 8-3-09) (FA 8-11-09) (1-10)
Change(s) to: 990-2, 990-3.1, 990-4.1, 990-4.10, 990-4.11, 990-5, 990-7.1, 990-8. |
SS9900202 | All Jobs |
|
993 OBJECT MARKERS AND DELINEATORS. (REV 7-9-09) (FA 7-20-09) (1-10) Change(s) to: 993-1.4, 993-2.3.1. |
SS9930104 | All Jobs |
|
TECHNICAL SPECIAL PROVISIONS.
The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.
Insert # ________ |
TSPs | Jobs with TSPs |