Specifications and Estimates
Implemented Modifications to the 2007 Standard Specifications
January 2007 Workbook
for Lettings Effective January 2007 - June 2007
Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Change Table - Shows all changes made to the Specifications within this workbook.
History of Revisions - To review the History of revisions for this Workbook.
Note: These files are in Adobe Acrobat (PDF) format.
File size ranges from 9 kb to 279 kb.
| SPECIAL PROVISIONS | SP0000001 | All Jobs |
|---|---|---|
| INTENT AND SCOPE. ARTICLE 4-1 (Page 19) is expanded by the following: The Improvements under this Contract consist of (Place description here). The summary of pay items for this project is listed in the plans.Insert # ________ The summary of pay items for this project is listed in the plans. |
SP0000041 | All Jobs, except Lump Sum |
|
INTENT AND SCOPE. ARTICLE 4-1 (Page 19) is deleted and the following substituted: Insert # _________ |
SP0000042 | All Lump Sum Projects |
|
(REV 8-22-96) (FA 9-3-96) (7-00) For this Contract, the Department will reject any bid in which the bidder submits proposed Contract time in excess of _________ calendar days. Insert # _________ |
SP0000043 | A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030100AB,SP0080701AB and SP0081300AB |
|
(REV 2-8-94) (7-00) It is anticipated that construction by others will be underway at each end and within this project during the life of this Contract. Coordinate construction operations with those of other Contractors as necessary. |
SP0000044 | When other Contractors are working in the vicinity |
|
EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND SITE
OF WORK. (REV 4-19-99) (1-02) ARTICLE 2-4 (Page 12) is expanded by the following: Insert # __________ |
SP0020400 | All Jobs, (add a phone number or e-mail address) |
|
PREPARATION OF PROPOSALS. (REV 6-22-04) (FA 7-13-04) (1-05) SUBARTICLE 2-5.1 (Page 12) is expanded by the following: |
SP0020501AB | A+B Bidding. (Use with proper authority). Use with SP0030100AB, SP0000043,SP0081300AB and SP0080701AB |
|
PREPARATION OF PROPOSALS. (REV 2-21-05) (FA 3-31-05) (1-06) SUBARTICLE 2-5.1 (Page 12) is expanded by the following: Insert # __________ |
SP0020501LR | Lane Rental. (Use with proper authority). Use with SP0030100LR, SP0081300LR and SP0081300LRDR |
|
AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) ARTICLE 3-1 (Page 16). The first and second sentences are deleted and the following substituted: Insert # _________ |
SP0030100AB | A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0000043,SP0080701AB and SP0081300AB |
|
Mandatory Revision No. 1
BUDGETARY CONSTRAINTS. ARTICLE 3-1 (Page 16) is expanded by the following: |
SP0030100BC | Use on Projects over $25 M Notify the Contracts Administration Office on the Transmittal Memo. |
|
Mandatory Revision No. 1
CONSIDERATION OF BIDS. ARTICLE 3-1 (Page 16) is deleted and the following substituted: |
SP0030100BO | Use with proper authority. Notify the Contracts Administration Office on the Transmittal Memo. |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-27-00) (1-01) ARTICLE 3-1 (Page 16). The first paragraph is expanded by the following: Insert # _________ |
SP0030100DC | All District Let and Maintenance Contracts excluding Lump Sum |
|
AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) ARTICLE 3-1 (Page 16). The first paragraph is deleted and the following substituted: |
SP0030100LS | Lump Sum Projects |
|
AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) ARTICLE 3-1 (Page 16). The first and second sentences are deleted and the following substituted: |
SP0030100LR | Lane Rental. (Use with proper authority). Use with SP0020501LR, SP0081300LR and SP0081300LRDR |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (1-02) ARTICLE 3-2 (Page 16) is expanded by the following: Insert # _________ *Contracts Office must approve |
SP0030200 | When necessary to change standard “Award and Execution”* |
| AWARD AND EXECUTION OF CONTRACT. (REV 2-7-97) (7-00) SUBARTICLE 3-2.1 (Page 16) is deleted and the following substituted: |
SP0030201 | Bid Average Method (Use with proper authority) |
|
SCOPE OF THE WORK. (REV 7-20-06) (1-07) SUBARTICLE 4-1 (Page 19) is expanded by the following: |
SP0040100 | All Metric Jobs |
| ALTERATION OF PLANS OR OF CHARACTER OF WORK. (REV 8-1-00) (1-01) SUBARTICLE 4-3.1 (Pages 19 and 20) is deleted and the following substituted: |
SP0040301LS | Lump Sum Projects |
|
VALUE ENGINEERING INCENTIVE. (REV 8-12-96) (FA 7-2-97) (7-00) SUBARTICLE 4-3.9 (Pages 26-31) is deleted. |
SP0040309DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
| UNFORESEEABLE WORK. (REV 9-28-98) (7-00) ARTICLE 4-4 (Page 31) is deleted and the following substituted: |
SP0040400 | 999-25 |
|
CONTROL OF THE WORK. (REV 3-15-02) (1-03) SUBARTICLE 5-1.1 (Page 32) is expanded by the following: |
SP0050501LS | Lump Sum Projects |
| INSPECTION. (REV 2-10-94) (7-00) SUBARTICLE 5-9.1 (Page 44) is expanded by the following: Insert # __________ |
SP0050901 | Long bridge jobs (1500 feet or longer); modify to suit |
| CONTROL OF MATERIALS. (REV 1-9-01) (7-01) ARTICLE 6-1 (Pages 52 and 53) is expanded by the following new Subarticles: |
SP0060100LS | Lump Sum Projects |
| EQUAL EMPLOYMENT
OPPORTUNITY REQUIREMENTS FOR FEDERAL JOBS. (REV 5-13-04) (FA 5-20-04) (1-05) SUBARTICLE 7-1.1 (Pages 60 and 61) is expanded by the following: |
SP0070101 | All Federal Aid Jobs |
|
ENDANGERED SPECIES. (REV 2-10-94) (7-00) SUBARTICLE 7-1.4 (Pages 62 and 63) is expanded by the following: |
SP0070104A | When called for (woodpecker) |
|
ENDANGERED SPECIES. (REV 2-27-96) (FA 3-26-96) (1-03) SUBARTICLE 7-1.4 (Pages 62 and 63) is expanded by the following: |
SP0070104B | When called for (Manatees and/or turtles) |
| PERMITS PROCURED BY THE DEPARTMENT. (REV 8-7-01) (FA 4-14-05) (7-02) SUBARTICLE 7-2.1 (Page 65) is expanded by the following: |
SP0070201A | Jobs with permit(s) procured by DOT |
| PERMITS PROCURED BY THE CONTRACTOR. (REV 12-18-00) (FA 4-14-05) (1-01) SUBARTICLE 7-2.1 (Page 65) is expanded by the following: |
SP0070201B | Jobs with buildings |
| DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S.,
WATERS OF THE U.S. AND WATERS OF THE STATE. (REV 6-9-03) (FA 6-12-03) (1-04) SUBARTICLE 7-2.2 (Pages 65 and 66) is expanded by the following: |
SP0070202 | When DEP Generic Permit is required |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 1-9-01) (1-04) SUBARTICLE 7-7.1 (Page 67) is expanded by the following: Insert # ________ |
SP0070701DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
|
USE OF EXPLOSIVES. (REV 9-26-94) (7-00) ARTICLE 7-9 (Pages 68 and 69) is deleted and the following substituted: |
SP0070900 | When explosives are prohibited |
|
UTILITY WORK. (REV 2-10-94) (7-02) SUBARTICLE 7-11.6.3 (Page 73) is expanded by the following: |
SP0071163A | When there are no utility work schedules |
|
UTILITY SCHEDULES. (REV 8-27-01) (FA 4-14-05) (7-02) SUBARTICLE 7-11.6.3 (Page 73) is expanded by the following: |
SP0071163B | When there are utility work schedules |
|
WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 1-3-03) (FA 5-16-03) (1-04) ARTICLE 7-16 (Page 76) is expanded by the following: Insert # ________ |
SP0071600 | All Federal Aid Jobs |
|
DISADVANTAGED BUSINESS ENTERPRISE PROGRAM. (REV 6-6-02) (FA 7-17-02) (1-03) SECTION 7 (Pages 60-78) is expanded by the following: |
SP0072400 | All Jobs |
|
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS. (REV 4-25-02) (FA 7-17-02) (1-03) SECTION 7 (Pages 60-78) is expanded by the following: |
SP0072500 | Non-Federal Aid Projects |
|
ON-THE-JOB TRAINING. (REV 6-20-02) (1-04) SECTION 7 (Pages 60-78) is expanded by the following: |
SP0072600 | All Jobs |
|
SUBLETTING CONTRACTS. (REV 2-14-94) (FA 4-14-05) (7-00) SUBARTICLE 8-1.1 (Page 78) is expanded by the following: |
SP0080101 | Pressure Epoxy Grouting pay item “Injecting and Sealing Prestressed Beams” |
|
PROSECUTION AND PROGRESS. (REV 8-1-00) (1-03) SUBARTICLE 8-1.2 (Page 78) is deleted. |
SP0080102LS | Lump Sum Projects |
|
SUBMISSION OF WORKING SCHEDULE. (REV 3-22-06) (FA 8-4-06) (1-07) SUBARTICLE 8-3.2 (Pages 79 and 80) is deleted and the following substituted: |
SP0080302A | Use only when CPM is authorized by District Construction Engineer. Do not use with SP0080302DC |
|
PROSECUTION AND PROGRESS. (REV 2-27-01) (1-03) SUBARTICLE 8-3.2 (Pages 79 and 80) is deleted. |
SP0080302DC | District Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts. Do not use with SP0080302A |
|
PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 2-24-04) (FA 4-23-04) (1-05) SUBARTICLE 8-3.3 (Page 80) is deleted and the following substituted: Insert # ________ *Contracts Office must be notified |
SP0080303A | When called for* |
|
BEGINNING WORK. (REV 7-10-95) (7-00) SUBARTICLE 8-3.3 (Page 80). The last sentence is deleted and the following substituted: Insert # ________ |
SP0080303B | Only when called for by the District Construction Engineer |
|
BEGINNING WORK. (REV 7-10-95) (7-00) SUBARTICLE 8-3.3 (Page 80) is expanded by the following substituted: Insert # ________ *Contracts Office must be notified |
SP0080303C | Only when called for by the District Construction Engineer |
|
PROSECUTION OF WORK - PARTNERING. (REV 3-4-98) (FA 5-26-98) (7-00) ARTICLE 8-3 (Pages 79 and 80) is expanded by the following new Subarticle: Insert # _______ *Contracts Office must be notified |
SP0080306 | 999-16* |
|
PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 11-19-02) (FA 3-5-03) (1-04) ARTICLE 8-3 (Pages 79 and 80) is expanded by the following new Subarticle: *Contracts Office must be notified |
SP0080307RB | 999-20* |
|
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD. (REV 4-1-02) (FA 12-12-02) (7-03) ARTICLE 8-3 (Pages 79 and 80) is expanded by the following new Subarticle: |
SP0080307RDRB | Jobs without 999-20 |
|
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD. (REV 6-23-03) (FA 8-1-03) (1-04) ARTICLE 8-3 (Pages 79 and 80) is expanded by the following new Subarticle: |
SP0080307SDRB | Jobs with Asphalt Pavement, concrete pavement, landscape installation,or performance turf |
|
LIMITATIONS OF OPERATIONS - FENCING. (REV 6-17-04) (FA 7-13-04) (1-05) SUBARTICLE 8-4.8 (Page 82) is deleted and the following substituted: |
SP0080408 | Jobs on Limited Access Highways |
|
HAZARDOUS OR TOXIC WASTE - MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (7-00) SUBARTICLE 8-4.9 (Page 82) is expanded by the following: Insert # ________ *Insert Hazardous Waste Coordinator and contact number |
SP0080409 | Jobs with Lighting* |
|
COMPUTATION OF CONTRACT TIME. (REV 7-24-96) (FA 9-3-96) (7-00) SUBARTICLE 8-7.1 (Page 85) is deleted and the following substituted: |
SP0080701AB | A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030100AB,SP0000043 and SP0081300AB |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (7-00) SUBARTICLE 8-7.1 (Page 85) is expanded by the following: Insert # ________ |
SP0080701A | Use when requested by proper authority, (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (7-00) SUBARTICLE 8-7.1 (Page 85) is expanded by the following: Insert # _______ |
SP0080701B | Only when called for (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (7-00) SUBARTICLE 8-7.1 (Page 85) is expanded by the following: |
SP0080701C | Use when requested by proper authority |
|
DAMAGE RECOVERY. (REV 2-4-04) (7-04) SECTION 8 (Pages 78-92) is expanded by the following: Insert # _______ |
SP0081300 | Use when requested by proper authority (Do not use with Lane Rental) |
|
PROSECUTION AND PROGRESS. (REV 7-28-97) (7-00) SECTION 8 (Pages 78-92) is expanded by the following new Article: |
SP0081300A | All Jobs with Alternative Bidding. (Use with proper authority |
|
8-13. Incentive - Disincentive for A+B. (REV 7-27-04) (FA 7-28-04) (1-05) Insert # _________ |
SP0081300AB | A+B Bidding. (Use with proper authority). Use with SP0020501AB, SP0030100AB,SP0000043 and SP0080701AB |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 5-19-04) (FA 7-13-04) (1-05) Insert # _________ |
SP0081300ABB | A+B Jobs with Bonus (Use with proper authority) |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert # _________ |
SP0081300B | Bonus (Date Specific) (Use with proper authority |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert # _________ |
SP0081300BCD | Bonus (Calendar Days) (Use with proper authority |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 4-12-06) (FA 4-25-06) (1-07) Insert # _________ |
SP0081300MB | Milestone Bonus (Use with proper authority). Do not use with SP0081300B or SP0081300BCD |
|
8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert # _________ |
SP0081300LQS | Liquidated Savings. (Use with proper authority) |
|
8-13. Incentive - Disincentive. (REV 7-27-04) (FA 7-28-04) (1-05) Insert # _________ |
SP0081300ID | Incentive - Disincentive. (Use with proper authority) |
|
8-13. Incentive - Disincentive. (REV 2-9-06) (FA 4-25-06) (1-07) Insert # _________ |
SP0081300MID | Milestone Incentive-Disincentive. (Use with proper authority). Do not use with SP0081300ID |
|
8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) |
SP0081300LR | Lane Rental. (Use with proper authority) |
|
8-13. Damage Recovery. (REV 9-25-03) (FA 12-24-03) (7-04) Insert # __________ |
SP0081300LRDR | Lane Rental. (Use with proper authority) |
|
8-13. Incentive - Disincentive for Lane Rental Days. (REV 9-25-03) (FA 12-24-03) (7-04) Insert # __________ |
SP0081300IDLR | Incentive-Disincentive for Lane Rental Days. (Use with proper authority). Do not use with SP00800LR or SP0081300LRDR |
|
MEASUREMENT AND PAYMENT. (REV 1-13-06) (FA 3-30-06) (1-07) SUBARTICLE 9-1.3 (Page 93) is deleted and the following substituted: |
SP0090103LS | Lump Sum Projects |
|
MEASUREMENT AND PAYMENT. (REV 4-7-04) (6-04) SUBARTICLE 9-5.1 (Pages 98 and 99) is expanded by the following: |
SP0090501DC | District Let Contracts. Excluding Lump Sum Projects |
|
Mandatory Revision No. 1
Add this Special Provision PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION-MOWING. (REV 11-16-06) (3-07) SUBARTICLE 104-7.2 (of the Supplemental Specifications) is deleted and the following substituted: |
SP1040702 | All Jobs |
|
ENGINEER’S FIELD OFFICE. (REV 5-1-02) (FA 5-14-02) (1-03) PAGE 145. The following new Section is added after Section 105: |
SP1090000 | 109-71 |
|
REMOVAL OF EXISTING BULKHEAD. (REV 7-10-95) (FA 6-21-99) (7-00) ARTICLE 110-1 (Page 146) is expanded by the following: |
SP1100100 | 110-73 |
|
REMOVAL AND DISPOSAL OF FENDER SYSTEM. (REV 3-18-94) (FA 6-21-99) (7-00) SUBARTICLE 110-6.1 (Page 148) is expanded by the following: |
SP1100601 | 110-71-1 Modify to suit |
|
REMOVAL OF EXISTING STRUCTURES. (REV 5-13-05) (FA 8-18-05) (1-06) ARTICLE 110-6 (Pages 148-150) is expanded by the following new Subarticle: |
SP1100606 | Use when areas of Asbestos Abatement are identified in the Plans |
|
MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (7-00) SUBARTICLE 110-11.2 (Page 152) is expanded by the following: |
SP1101102 | 110-84 |
|
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (1-03) ARTICLE 120-1 (Pages 155 and 156) is expanded by the following: |
SP1200100A | Use when contaminated areas are delineated in the plans |
|
FILL GRAVEL. (REV 3-11-96) (1-04) ARTICLE 120-1 (Pages 155 and 156) is expanded by the following: |
SP1200100B | 120-72 plan details required |
|
FILL SAND. (REV 1-3-94) (7-00) PAGE 184. The following new Section is added after Section 125: |
SP1420000 | 142-70 (Plans to cover Material and Placement) |
|
STABILIZED SUBBASE UNDER CONCRETE PAVEMENT. (REV 1-3-94) (7-00) ARTICLE 160-3 (Page 189) is expanded by the following: |
SP1600300 | Only when called for |
|
STABILIZED SUBBASE. (REV 1-3-94) (7-00) PAGE 199. The following new Section is added after Section 175: |
SP1800000 | 180-70; 180-71 |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-01) ARTICLE 327-1 (Page 241). The third paragraph is deleted and the following substituted: Insert # ________ |
SP3270100 | When the plans provide a location for stockpiling milled material. Insert quantity to be retained. Use all, tons, cubic yards |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (7-00) ARTICLE 327-2 (Pages 241 and 242) is expanded by the following: |
SP3270200 | Use when requested by districts |
|
SURFACE REQUIREMENTS. (REV 9-23-02) (FA 10-21-02) (7-03) ARTICLE 330-12 (Pages 254 and 257) is expanded by the following new Subarticle: |
SP3301206 | When the design speed is equal to or greater than 50 miles per hour |
|
COMPOSITE PANEL SUPPORT REPAIR. (REV 12-10-93) (7-00) SECTION 400 (Pages 359-394) is expanded by the following: |
SP4000000 | 400-128 |
| PRECAST BULKHEAD PANELS. (REV 7-10-95) (7-00) SUBARTICLE 400-22.1 (Pages 391 and 392) is expanded by the following: |
SP4002201 | 400-72 (requires plan details) |
| REPLACE GRATES. (REV 2-3-94) (7-00) ARTICLE 425-1 (Page 415) is expanded by the following: |
SP4250100 | 425-82 (requires plan details) |
|
DESILTING PIPE. (REV 6-13-95) (FA 6-21-95) (7-00) SECTION 430 (Pages 418-429) is expanded by the following: |
SP4300000 | 430-94x |
|
DESILTING CONCRETE BOX CULVERTS. (REV 11-9-93) (7-03) SUBARTICLE 430-12.9(Page 429) is expanded by the following: |
SP4301209 | 430-950 |
| DEEP DRAINAGE WELLS. (REV 11-9-93) (7-00) PAGE 438. The following new Section is added after Section 443: |
SP4440000 | 444-70; 444-71 |
|
Mandatory Revision No. 2
TEST PILES, EMBEDDED DATA COLLECTOR. (REV 10-27-06) (FA 11-16-06) (1-07) SUBARTICLE 455-5.12 (Pages 512 and 513) is deleted and the following substituted: |
SP4550512 | 455-146 |
| INTEGRAL PILE JACKETS. (REV 9-12-94) (7-00) PAGE 563. The following new Section is added after Section 455: |
SP4570000 | 457-70 |
| BARRIER WALL REMOVAL (CONCRETE). (REV 7-10-95) (7-00) ARTICLE 521-1 (Page 586) is expanded by the following: |
SP5210100 | 521-73 (plan details required) |
|
OPAQUE VISUAL BARRIER. (REV 4-13-94) (7-00) PAGE 613. The following new Section is added after Section 538: |
SP5390000 | 539-80 (requires plan details) |
|
FENCING. (REV 1-6-98) (7-00) ARTICLE 550-2 (Page 623) is deleted and the following substituted: |
SP5500200 | Type A fencing on non-NHS Projects only |
|
PLASTIC EROSION MAT. (REV 1-5-00) (FA 1-12-00) (7-02) Page 667.The following new Section is added after Section 570: |
SP5710000 | 571-1 |
|
MOTORIST AID CALL BOX RELOCATION. (REV 11-30-00) (FA 2-2-01) (7-01) PAGE 749. The following new Section is added after Section 713: |
SP7140000 | 714-1, 400-2, (requires plan details) |
|
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 755. The following new Section is added after Section 715: |
SP7410000 | 741-70 |
|
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 755. The following new Section is added after Section 715: |
SP7430000 | 743-70 |
|
TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 755. The following new Section is added after Section 715: |
SP7440000 | 744-70 |
|
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 10-25-01) (FA 12-21-01) (7-02) PAGE 755. The following new Section is added after Section 715: |
SP7450000 | 745-70 |
|
TRAFFIC MONITORING SITE CABINET. (REV 6-21-99) (FA 7-20-99) (7-02) PAGE 755. The following new Section is added after Section 715: |
SP7460000 | 746-7 |
|
TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (7-00) PAGE 755. The following new Section is added after Section 715: |
SP7470000 | 747 Items |
|
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE
EQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (7-00) PAGE 755. The following new Section is added after Section 715: |
SP7480000 | Jobs with Traffic Monitoring Sites |
|
TRANSPORTATION ENHANCEMENT PROJECTS. (REV 8-6-96) (FA 12-10-96) (1-04) SUBARTICLE 120-9.2 (Page 163) is expanded by the following: |
SPXENHANCE | For non-vehicular enhancement projects only |
| Supplemental Specifications | SS0000001 | All Jobs |
|
003 CONTRACT BOND REQUIRED-SURETY TO FURNISH LEGAL DEFENSE.
( REV 8-16-06) (FA 8-22-06) (1-07)
SUBARTICLE 3-5.4, (Page 17 and 18) is deleted and the following substituted: |
SS0030504 | All Jobs |
|
006 QUALITY CONTROL PLAN APPROVAL(REV 8-16-06)
(FA 8-22-06) (1-07) SUBARTICLE 6-8.4 (Pages 56-57) is deleted and the following substituted: |
SS0060804 | All Jobs |
|
009 MEASUREMENT AND PAYMENT. (REV 7-25-06) (FA 7-27-06) (1-07) SUBARTICLE 9-2.1.1 (Pages 94 and 95) is deleted and the following substituted: |
SS0090211 | All Jobs Excluding Lump Sum |
|
104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION
AND WATER POLLUTION. (REV 8-28-06) (FA 8-31-06) (1-07) ARTICLES 104-6 thru 104-10 (Pages 129-135) is deleted and the following substituted: |
SS1040600 | All Jobs |
|
105 SUPERVISORY PERSONNEL-BRIDGE STRUCTURES. (REV 6-8-06) (FA 7-12-06) (1-07) SUBARTICLE 105-5.8 (Pages 140-143) is deleted and the following substituted: |
SS1050508 | All Jobs |
|
110 REMOVAL OF EXISTING STRUCTURES. (REV 4-10-06) (FA 8-11-06) (1-07) SUBARTICLE 110-6.1 (Page 148) is deleted and the following substituted: |
SS1100601 | All Jobs |
|
120 MATERIALS FOR EMBANKMENT-EMBANKMENT CONSTRUCTION. (REV 6-28-06) (FA 7-6-06) (1-07) SECTION 120 (Pages 155-172) is deleted and the following substituted: |
SS1200700 | All Jobs |
|
330 JOINTS-LONGITUDINAL JOINTS. (REV 7-17-06) (FA 7-20-06) (1-07) SUBARTICLE 330-11.2 (Page 254) is deleted and the following substituted: |
SS3301102 | Jobs with Asphalt |
|
347 CERTIFICATION AND ACCEPTANCE-GENERAL. (REV 6-22-06) (FA 7-21-06) (1-07) ARTICLE 347-5 (Pages 328 and 329) is deleted and the following substituted: |
SS3470500 | Jobs with Non-Structural Concrete |
|
407 THREE-SIDED PRECAST CULVERT. (REV 6-22-06) (FA 9-12-06) (1-07) PAGE 394. The following new Section is added after Section 400: |
SS4070000 | Concrete Box Culverts |
|
410 PRECAST CONCRETE BOX CULVERT. (REV 5-22-06) (FA 9-12-06) (1-07) SECTION 410 (Pages 394-397) is deleted and the following substituted: |
SS4100000 | Concrete Box Culverts |
|
425 INLETS, MANHOLES, AND JUNCTION BOXES. (REV 12-6-05) (FA 5-26-06) (1-07) SECTION 425 (Pages 415-418) is deleted and the following substituted: |
SS4250000 | All Jobs |
|
430 PIPE CULVERTS. (REV 5-12-06) (FA 6-1-06) (1-07) SECTION 430 (Pages 418-429) is deleted and the following substituted: |
SS4300000 | Jobs with Pipe |
|
449 REQUIREMENT FOR PIPE JOINTS WHEN RUBBER
GASKETS ARE TO BE USED. (REV 3-9-06) (FA 6-1-06) (1-07) ARTICLE 449-6 (Pages 443-445) is deleted and the following substituted: |
SS4490600 | All Jobs |
|
452 PRECAST SEGMENTAL BRIDGE CONSTRUCTION. (REV 9-21-05) (FA 12-6-05) (7-06) PAGE 490. The following new Section is added after Section 451: |
SS4520000 | All Precast Segmental Bridge Jobs |
|
453 EPOXY JOINTING OF PRECAST SEGMENTS. (REV 1-28-03) (FA 2-6-03) (1-04) PAGE 490. The following new Section is added after Section 451: |
SS4530000 | Jobs with Segmental Bridges |
|
455 STRUCTURES FOUNDATIONS. (REV 8-14-06) (FA 8-29-06) (1-07) ARTICLE 455-4 (Page 501) is deleted and the following substituted: |
SS4550400 | Jobs with Structures Foundations |
|
458 BRIDGE DECK JOINTS. (REV 7-20-06) (FA 9-12-06) (1-07) PAGE 563. The following new Section is inserted after Section 455: |
SS4580000 | All Jobs |
|
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS. (REV 8-30-06) (FA 9-12-06) (1-07) PAGE 565. The following new Section is added after Section 459: |
SS4600000 | All Jobs |
|
462 POST-TENSIONING. (REV 6-8-06) (FA 7-31-06) (1-07) PAGE 567. The following new Section is added after Section 461: |
SS4620000 | 462-2 |
|
471 PLASTIC FENDER SYSTEM COMPONENTS. (REV 6-15-06) (FA 8-29-06) (1-07) PAGE 570. The following new Section is added after Section 470: |
SS4710000 | 471-1 |
|
520 CURING-MEMBRANE CURING COMPOUND METHOD. (REV 4-18-07) (FA 4-25-07) (1-08) SUBARTICLE 520-8.3 (PAGE 585) is deleted and the following substituted: |
SS5200803 | All Jobs |
|
523 PATTERNED/TEXTURED PAVEMENT. (REV 5-30-06) (FA 9-7-06) (1-07) ARTICLE 523-1 (Page 591) is deleted and the following substituted: |
SS5230201 | 523-1 |
|
530 RIPRAP. (REV 6-27-06) (FA 7-31-06) (1-07) SECTION 530 (Pages 600-604) is deleted and the following substituted: |
SS5300000 | 530 Items |
|
534 SOUND BARRIERS - APPROVED PROPRIETARY SOUND
BARRIER PANELS AND SYSTEMS. (REV 7-26-06) (FA 8-3-06) (1-07) ARTICLE 534-4 (Page 605) is deleted and the following substituted: |
SS5340400 | 534-74 |
|
544 VEHICULAR IMPACT ATTENUATORS. (REV 12-13-06) (FA 2-12-07) (7-07) SECTION 544 (Pages 613 and 614) is deleted and the following substituted: |
SS5440000 | All Jobs |
|
570 PERFORMANCE TURF. (REV 9-11-06) (FA 9-13-06) (1-07) SECTION 570 (Pages 664-667) is deleted and the following substituted: |
SS5700000 | All Jobs |
|
575 SODDING. (REV 9-7-05) (FA 9-6-06) (1-07) SECTION 575 (Pages 667-669) is deleted. |
SS5750000 | All Jobs |
|
649 GALVANIZED STEEL STRAIN POLES, MAST ARMS
AND MONOTUBE ASSEMBLIES. (REV 6-11-06) (FA 7-24-06) (1-07) SECTION 649 (Pages 701-705) is deleted and the following substituted: |
SS6490000 | 649 Items |
|
700 OVERHEAD SIGN STRUCTURES. (REV 6-27-06) (FA 7-12-06) (1-07) SECTION 700-2.4 (Pages 725 and 726) is expanded by the following new Subarticle: |
SS7000243 | Jobs with Overhead Sign Structures |
|
709 TRAFFIC STRIPES AND MARKINGS-TWO REACTIVE
COMPONENTS-BASIS OF PAYMENT.
(REV 4-26-06) (FA 8-9-06) (1-07) ARTICLE 709-10 (Page 737) is deleted and the following substituted: |
SS7091000 | 709 Items |
|
710 PAINTED PAVEMENT MARKINGS. (REV 7-12-06) (FA 7-18-06) (1-07) ARTICLE 710-4.1 (Page 738). The second sentence is deleted and the following substituted: |
SS7100401 | 710 Items |
|
780 INTELLIGENT TRANSPORTATION SYSTEMS-GENERAL
REQUIREMENTS. (REV 8-7-06) (FA 8-15-06) (1-07) PAGE 755. The following new Section is added after Section 715: |
SS7800000 | 780 Items |
|
781 INTELLIGENT TRANSPORTATION SYSTEMS-MOTORIST
INFORMATION SYSTEMS. (REV 10-5-05) (FA 1-21-06) (7-06) PAGE 755. The following new Section is added after Section 715: |
SS7810000 | 781 Items |
|
782 INTELLIGENT TRANSPORTATION SYSTEMS-VIDEO
EQUIPMENT. (REV 10-20-05) (FA 1-21-06) (7-06) PAGE 755. The following new Section is added after Section 715: |
SS7820000 | 782-1 |
|
783 INTELLIGENT TRANSPORTATION SYSTEMS-FIBER
OPTIC CABLE AND INTERCONNECT. (REV 10-5-05) (FA 1-30-06) (7-06) PAGE 755. The following new Section is added after Section 715: |
SS7830000 | 783 Items |
|
784 INTELLIGENT TRANSPORTATION SYSTEMS-NETWORK
DEVICES. (REV 10-5-05) (FA 2-1-06) (7-06) PAGE 755. The following new Section is added after Section 715: |
SS7840000 | 784 Items |
|
785 INTELLIGENT TRANSPORTATION SYSTEMS-INFRASTRUCTURE. (REV 10-21-05) (FA 2-1-06) (7-06) PAGE 755. The following new Section is added after Section 715: |
SS7850000 | 785-1 |
|
786 INTELLIGENT TRANSPORTATION SYSTEMS-VEHICLE
DETECTION AND DATA COLLECTION. (REV 8-25-06) (FA 9-6-06) (1-07) PAGE 755. The following new Section is added after Section 715: |
SS7860000 | 786 Items |
|
916 BITUMINOUS MATERIALS. (REV 7-26-06) (FA 7-31-06) (1-07) SECTION 916 (Pages 772-784) is deleted and the following substituted: |
SS9160000 | Jobs with Asphalt |
|
932 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE
PAVEMENT AND CONCRETE STRUCTURES. (REV 3-24-06) (FA 6-1-06) (1-07) SUBARTICLE 932-1.2 (Pages 816 and 817) is deleted and the following substituted: |
SS9320102 | All Jobs |
|
943 CORRUGATED STEEL PIPE AND PIPE ARCH (INCLUDING
UNDERDRAIN). (REV 5-12-06) (FA 6-1-06) (1-07) ARTICLE 943-1 (Page 838) is deleted and the following substituted: |
SS9430100 | All Jobs |
|
945 ALUMINUM PIPE, INCLUDING UNDERDRAIN, PIPE
ARCH AND STRUCTURAL PLATE PIPE AND PIPE ARCH. (REV 2-28-06) (FA 6-1-06) (1-07) SECTION 945 (Pages 841-843) is deleted and the following substituted: |
SS9450000 | All Jobs |
|
948 MISCELLANEOUS TYPES OF PIPE. (REV 1-25-06) (FA 6-1-06) (1-07) SUBARTICLE 948-1.7 (Pages 844 and 845) is deleted and the following substituted: |
SS9480107 | All Jobs |
|
962 STRUCTURAL STEEL
AND MISCELLANEOUS METAL ITEMS (OTHER THAN ALUMINUM). (REV 7-28-06) (FA 9-12-07) (1-07) PAGE 857. The following new Section is added after Section 955: |
SS9620000 | All Jobs |
|
970 RAISED RETRO-REFLECTIVE PAVEMENT MARKERS-IN-SERVICE
MINIMUM REFLECTIVE. (REV 5-2-06) (FA 7-24-06) (1-07) SUBARTICLE 970-1.3.3 (Page 861) is deleted and the following substituted: |
SS9700133 | All Jobs |
|
973 STRUCTURAL PLASTICS. (REV 8-28-06) (FA 9-6-06) (1-07) PAGE 878. The following new Section is added after Section 972: |
SS9730000 | Jobs with Bridges |
|
981 TURF MATERIALS. (REV 6-27-06) (FA 7-7-06) (1-07) SECTION 981 (Pages 884-886) is deleted and the following substituted: |
SS9810000 | All Jobs |
|
982 FERTILIZER. (REV 8-30-06) (FA 9-6-06) (1-07) ARTICLE 982-3 (Page 886) is deleted and the following substituted: |
SS9820300 | All Jobs |
