Specifications and Estimates
Implemented Modifications to the 2004 Standard Specifications
January 2004 Workbook
for Lettings Effective January 2004 - June 2004
Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Change Table - Shows all changes made to the Specifications within this workbook.
History of Revisions - To review the History of revisions for this Workbook.
Note: These files are in Adobe Acrobat (PDF) format.
File size ranges from 9 kb to 279 kb.
| SPECIAL PROVISIONS | SP0000001 | All Jobs |
|---|---|---|
| INTENT AND SCOPE. ARTICLE 4-1 (Page 17) is expanded by the following: The Improvements under this Contract consist of (Place description here). The summary of pay items for this project is listed in the plans.Insert # ________ The summary of pay items for this project is listed in the plans. |
D0040002 | All Jobs, except Lump Sum |
|
INTENT AND SCOPE. ARTICLE 4-1 (Page 17) is deleted and the following substituted: Insert # _________ |
D00401LS | All Lump Sum Projects |
|
(REV 8-22-96) (FA 9-3-96) (7-00) For this Contract, the Department will reject any bid in which the bidder submits proposed Contract time in excess of _________ calendar days. Insert # _________ |
D0040091 | A+B Bidding. (Use with proper authority). Use with D00200AB, 00300ABSP, D00800A and D00800AB |
|
(REV 2-8-94) (7-00) It is anticipated that construction by others will be underway at each end and within this project during the life of this Contract. Coordinate construction operations with those of other Contractors as necessary. |
D0040010 | When other Contractors are working in the vicinity |
|
DEFINITIONS. (REV 12-30-94) (fa 5-26-95) (7-00) ARTICLE 1-3 (Pages 2-9). The definition of Controlling Work Items is deleted and the following substituted: |
D0010013 | CPM Jobs |
|
PROPOSAL REQUIREMENTS AND CONDITIONS. (REV 7-27-00) (1-03) ARTICLE 2-2 (Pages 10 and 11). Beginning with the third paragraph to the end of Article 2-2, the text is deleted. |
D00201DC | All District Let and Maintenance Contracts |
|
PROPOSAL REQUIREMENTS AND CONDITIONS. (REV 8-8-03) (1-04) ARTICLE 2-2 (Pages 10 and 11). Beginning with the eleventh paragraph is deleted and the following substituted. |
D0020002 | All Jobs. Do not use with D00201DC |
|
EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND SITE
OF WORK. (REV 4-19-99) (1-02) ARTICLE 2-4 (of the Supplemental Specifications) is expanded by the following: Insert # __________ |
D0020024 | All Jobs, (add a phone number or e-mail address) |
|
PREPARATION OF PROPOSALS. (REV 11-5-97) (FA 1-25-98) (7-00) SUBARTICLE 2-5.1 (Page 12) is expanded as follows: |
D00200AB | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00300AB, D0040091, D00800AB and D008007A |
|
PREPARATION OF PROPOSALS. (REV 4-29-97) (FA 5-7-97) (7-00) SUBARTICLE 2-5.1 (Page 12) is expanded by the following: Insert # __________ |
D00200LR | 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with D00300LR, D00800LR and D00801LR |
|
AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) ARTICLE 3-1 (Page 16). The first and second sentences are deleted and the following substituted: Insert # _________ |
D00300AB | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D0040091,D008007A and D00800AB |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-27-00) (1-01) ARTICLE 3-1 (Pages 14 and 15). The first paragraph is expanded by the following: Insert # _________ |
D00300DC | All District Let and Maintenance Contracts excluding Lump Sum |
|
AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) ARTICLE 3-1 (Pages 14 and 15). The first paragraph is deleted and the following substituted: |
D00300LS | Lump Sum Projects |
|
AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) ARTICLE 3-1 (Page 14 and 15). The first and second sentences are deleted and the following substituted: |
D00300LR | 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with D00200LR, D00800LR and D00801LR |
|
AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (1-02) ARTICLE 3-2 (Page 15) is expanded by the following: Insert # _________ *Contracts Office must approve |
D0032000 | When necessary to change standard “Award and Execution”* |
| AWARD AND EXECUTION OF CONTRACT. (REV 2-7-97) (7-00) SUBARTICLE 3-2.1 (Page 15) is deleted and the following substituted: |
D00300003 | Bid Average Method (Use with proper authority) |
| ALTERATION OF PLANS OR OF CHARACTER OF WORK. (REV 8-1-00) (1-01) SUBARTICLE 4-3.1 (Pages 19 and 20) is deleted and the following substituted: |
D00403LS | Lump Sum Projects |
|
VALUE ENGINEERING INCENTIVE. (REV 8-12-96) (FA 7-2-97) (7-00) SUBARTICLE 4-3.9 (Pages 22-25) is deleted. |
D00400DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
| UNFORESEEABLE WORK. (REV 9-28-98) (7-00) ARTICLE 4-4 (Page 25) is deleted and the following substituted: |
D0040004 | 999-25 2999-25 |
|
MANDATORY REVISION NO. 1 ADD THIS SPECIAL PROVISION DESIGN STANDARDS (ENGLISH UNITS). (REV 9-18-03) (1-04) SUBARTICLE 5-1.1 (Page 26). The "Design Standards" booklet for English Units, dated January 2002, is modified as follows: |
D005001E | English Jobs with 548 Pay Items |
|
DESIGN STANDARDS (ENGLISH UNITS). (REV 8-4-03) (1-04) SUBARTICLE 5-1.1 (Page 26). The "Design Standards" booklet for English Units, dated January 2002, is modified as follows: |
D005011E | All English Jobs |
|
MANDATORY REVISION NO. 1 ADD THIS SPECIAL PROVISION DESIGN STANDARDS (METRIC UNITS). (REV 9-18-03) (1-04) SUBARTICLE 5-1.1 (Page 26). The "Design Standards" booklet for English Units, dated January 2002, is modified as follows: |
D005001M | Metric Jobs with 2548 Pay Items |
|
ROADWAY AND TRAFFIC DESIGN STANDARDS (METRIC UNITS). (REV 8-9-02) (1-03) SUBARTICLE 5-1.1 (Page 26). The "Design Standards" booklet for English Units, dated January 2000, is modified as follows: |
D005011M | All Jobs |
|
CONTROL OF THE WORK. (REV 3-15-02) (1-03) SUBARTICLE 5-1.1 (Page 26) is expanded by the following: |
D00500LS | Lump Sum Projects |
| INSPECTION. (REV 2-10-94) (7-00) SUBARTICLE 5-9.1 (Page 38) is expanded by the following: Insert # __________ |
D0050091 | Long bridge jobs (1500 feet [450 m] or longer); modify to suit |
| CONTROL OF MATERIALS. (REV 1-9-01) (7-01) ARTICLE 6-1 (Pages 47 and 48) is expanded by the following new Subarticles: |
D00600LS | Lump Sum Projects |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 8-8-03) 1-04) SUBARTICLE 7-1.1 (55 and 56). The eleventh paragraph is deleted and the following substituted: |
D0070001 | All Jobs |
|
LAWS TO BE OBSERVED. (REV 2-1-02) (1-04) SUBARTICLE 7-1.1 (55 and 56) is expanded by the following: |
D0070011 | All Federal Aid Jobs |
|
ENDANGERED SPECIES. (REV 2-10-94) (7-00) SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following: |
D0070010 | When called for (woodpecker) |
|
ENDANGERED SPECIES. (REV 2-27-96) (FA 3-26-96) (1-03) SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following: |
D0070014 | When called for (Manatees and/or turtles) |
| PERMITS PROCURED BY THE DEPARTMENT. (REV 8-7-01) (7-02) SUBARTICLE 7-2.1 (Page 59) is expanded by the following: |
D0070021 | Jobs with permit(s) procured by DOT |
| PERMITS PROCURED BY THE CONTRACTOR. (REV 12-18-00) (1-01) SUBARTICLE 7-2.1 (Page 65) is expanded by the following: |
D0070022 | Jobs with buildings |
| DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S.,
WATERS OF THE U.S. AND WATERS OF THE STATE. (REV 6-9-03) (FA 6-12-03) (1-04) SUBARTICLE 7-2.2 (Page 59) is expanded by the following: |
D0070002 | When DEP Generic Permit is required |
|
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 1-9-01) (1-04) SUBARTICLE 7-7.1 (Page 60) is expanded by the following: Insert # ________ |
D00700DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
|
STRUCTURES OVER NAVIGATABLE WATERS. (REV 2-10-94) (7-00) ARTICLE 7-8 (Page 62) is expanded by the following: |
D0070080 | When work platforms are indicated in the permit for construction |
|
USE OF EXPLOSIVES. (REV 9-26-94) (7-00) ARTICLE 7-9 (Pages 68 and 69) is deleted and the following substituted: |
D0070008 | When explosives are prohibited |
|
UTILITY WORK. (REV 2-10-94) (7-02) SUBARTICLE 7-11.6.3 (Page 66) is expanded by the following: |
D0071164 | When there are no utility work schedules |
|
UTILITY SCHEDULES. (REV 8-27-01) ((7-02) SUBARTICLE 7-11.6.3 (Page 66) is expanded by the following: |
D0070116 | When there are utility work schedules |
|
WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 1-3-03) (FA 5-16-03) (1-04) ARTICLE 7-16 (of the Supplemental Specifications) is expanded by the following: Insert # ________ |
D0070160 | All Federal Aid Jobs |
|
DISADVANTAGED BUSINESS ENTERPRISE PROGRAM. (REV 6-6-02) (FA 7-17-02) (1-03) SECTION 7 (Pages 55-71) is expanded by the following: |
D0070025 | All Jobs |
|
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS. (REV 4-25-02) (FA 7-17-02) (1-03) SECTION 7 (Pages 55-71) is expanded by the following: |
D0070026 | Non-Federal Aid Projects |
|
ON-THE-JOB TRAINING. (REV 6-20-02) (1-04) SECTION 7 (Pages 55-71) is expanded by the following: |
D0070027 | All Jobs |
|
SUBLETTING CONTRACTS. (REV 2-14-94) (7-00) SUBARTICLE 8-1.1 (of he Supplemental Specifications) is expanded by the following: |
D0080010 | Pressure Epoxy Grouting pay item “Injecting and Sealing Prestressed Beams” |
|
PROSECUTION AND PROGRESS. (REV 8-1-00) (1-03) SUBARTICLE 8-1.2 (Pages 72 and 73) is deleted. |
D00800LS | Lump Sum Projects |
|
SPECIALTY WORK. (REV 9-28-98) (7-00) SUBARTICLE 8-1.2 (Pages 72 and 73). The text is deleted and the following substituted: Insert #___________ |
D0080012 | For Contracts not normally performed by Road and Bridge Contractors |
|
SUBMISSION OF WORKING SCHEDULE. (REV 5-30-02) (FA 7-24-02) (1-03) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted: |
D0080032 | Use only when CPM is authorized by District Construction Engineer. Do not use with D0080039 or D00800DC |
|
SUBMISSION OF WORKING SCHEDULE. (REV 5-30-02) (FA 7-24-02) (1-03) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted: |
D0080039 | Use only when CPM is authorized by District Construction Engineer. Do not use with D0080032 or D00800DC |
|
PROSECUTION AND PROGRESS. (REV 2-27-01) (1-03) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted. |
D00800DC | District Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts. Do not use with D0080032, D0080039, or D0080050 |
|
PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 8-2-96) (FA 9-4-96) (1-03) SUBARTICLE 8-3.3 (Page 74) is deleted and the following substituted: Insert # ________ *Contracts Office must be notified |
D0080083 | When called for* |
|
BEGINNING WORK. (REV 7-10-95) (7-00) SUBARTICLE 8-3.3 (Page 74). The last sentence is deleted and the following substituted: Insert # ________ |
D0080330 | When called for by the District Construction Engineer |
|
BEGINNING WORK. (REV 10-22-98) (FA 11-5-98) (7-00) SUBARTICLE 8-3.3 (Page 74) is expanded by the following substituted: Insert # ________ *Contracts Office must be notified |
D0080033 | Only when called for by the District Construction Engineer |
|
PROSECUTION OF WORK - PARTNERING. (REV 3-4-98) (FA 5-26-98) (7-00) ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle: Insert # _______ *Contracts Office must be notified |
D0080036 | 999-16* 2999-16* |
|
PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 11-19-02) (FA 3-5-03) (1-04) ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle: |
D0080037 | 999-20* 2999-20* |
|
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD. (REV 4-1-02) (FA 12-12-02) (7-03) ARTICLE 8-3 (Pages 73-5) is expanded by the following new Subarticle: |
D0080370 | Jobs without 999-20;
2999-20 |
|
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD. (REV 6-23-03) (FA 8-1-03) (1-04) ARTICLE 8-3 (Pages 73-75) is expanded by the following new Subarticle: |
D0083700 | Jobs with Asphalt Pavement, concrete pavement, landscape installation |
|
LIMITATIONS OF OPERATIONS. (REV 2-14-94) (7-00) SUBARTICLE 8-4.1 (Page 75) is expanded by the following:Insert#______________ |
D080048 | When certain night work hours are required. Must be modified to show work hours. (Use when requested by proper authority). Do NOT use with D00800DC |
|
LIMITATIONS OF OPERATIONS. (REV 2-14-94) (7-00) SUBARTICLE 8-4.1 (Page 75) is expanded by the following: |
D080050 | Modify as appropriate (use only when required). Do NOT use with D00800DC |
|
HAZARDOUS OR TOXIC WASTE - MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (7-00) SUBARTICLE 8-4.9 (Pages 76 and 77) is expanded by the following: Insert # ________ *Insert Hazardous Waste Coordinator and contact number |
D080049 | Jobs with Lighting* |
|
COMPUTATION OF CONTRACT TIME. (REV 7-24-96) (FA 9-3-96) (7-00) SUBARTICLE 8-7.1 (Page 79) is deleted and the following substituted: |
D008007A | A+B Bidding. (Use with proper authority). Use with D00200AB, D00300AB,D0040091 and D00800AB |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (7-00) SUBARTICLE 8-7.1 (Page 79) is expanded by the following: Insert # ________ |
D0080072 | Use when requested by proper authority, (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (7-00) SUBARTICLE 8-7.1 (Page 79) is expanded by the following: Insert # _______ |
D0080076 | Only when called for (must be modified) |
|
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (7-00) SUBARTICLE 8-7.1 (Page 79) is expanded by the following: |
D0080700 | Use when requested by proper authority |
|
PROSECUTION AND PROGRESS. (REV 7-28-97) (7-00) SECTION 8 (Pages 71-86) is expanded by the following new Article: |
D00800D0 | All Jobs with Alternative Bidding. (Use with proper authority) |
|
8-13. Incentive - Disincentive for A+B. (REV 3-8-99) (7-00) Insert # _________ |
D00800AB | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D003000AB,D0040091 and D008007A |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 3-8-99) (7-01) Insert # _________ |
D0080016 | Bonus (Date Specific) (Use with proper authority |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 3-8-99) (7-01) Insert # _________ |
D0080D16 | Bonus (Calendar Days) (Use with proper authority |
|
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 8-8-02) (1-03) Insert # _________ |
D00800MS | Milestone Bonus (Use with proper authority). Do not use with D0081600 or D0080D16 |
|
8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert # _________ |
D0080017 | Liquated Savings. (Use with proper authority) |
|
8-13. Incentive - Disincentive. (REV 3-8-99) (7-00) Insert # _________ |
D00800ID | Incentive - Disincentive. (Use with proper authority) |
|
8-13. Incentive - Disincentive. (REV 8-8-02) (1-03) Insert # _________ |
D008IDMS | Milestone Incentive-Disincentive. (Use with proper authority). Do not use with D00800ID |
|
8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) |
D00800LR | 999-5, 2999-5; Lane Rental. (Use with proper authority) |
|
8-13. Damage Recovery. (REV 4-11-97) (FA 5-7-97) (7-00) Insert # __________ |
D00801LR | 999-5, 2999-5; Lane Rental. (Use with proper authority) |
|
8-13. Incentive - Disincentive for Lane Rental Days. (REV 8-8-02) (1-03) Insert # __________ |
D008IDLR | Incentive-Disincentive for Lane Rental Days. (Use with proper authority). Do not use with D00800LR or D00801LR |
|
MANDATORY REVISION NO. 4 ADD THIS SPECIAL PROVISION MEASUREMENT AND PAYMENT. (REV 4-8-04) (6-04) SUBARTICLE 9-1.3 (Page 87) is deleted and the following substituted: |
D00900LS | Lump Sum Projects |
|
MANDATORY REVISION NO. 3 DELETE THIS SPECIAL PROVISION MEASUREMENT AND PAYMENT. (REV 3-19-04) (3-04) SUBARTICLE 9-1.3 (Page 87) is deleted and the following substituted: |
D00900LS | Lump Sum Projects |
|
MANDATORY REVISION NO. 3 DELETE THIS SPECIAL PROVISION MEASUREMENT AND PAYMENT. (REV 6-7-02) (1-04) SUBARTICLE 9-1.3 (Page 87) is deleted and the following substituted: |
D00900LS | Lump Sum Projects |
|
MANDATORY REVISION NO. 4 ADD THIS SPECIAL PROVISION SCOPE OF PAYMENTS. (REV 4-7-04) (6-04) ARTICLE 9-2 (Pages 88 and 89) is deleted and the following substituted: |
D0090211 | All Jobs. Excluding Lump Sum |
|
MANDATORY REVISION NO. 3 DELETE THIS SPECIAL PROVISION SCOPE OF PAYMENTS. (REV 3-18-04) (3-04) ARTICLE 9-2 (Pages 88 and 89) is deleted and the following substituted: |
D0090211 | All Jobs. Excluding Lump Sum and Distric Let Contracts |
|
MANDATORY REVISION NO. 3 DELETE THIS SPECIAL PROVISION SCOPE OF PAYMENTS. (REV 8-8-03) (1-04) SUBARTICLE 9-2.1.1 (Page 88) is deleted and the following substituted: |
D0090211 | All Jobs. Do not use with D00900DC |
|
MANDATORY REVISION NO. 3 DELETE THIS SPECIAL PROVISION MEASUREMENT AND PAYMENT. (REV 5-7-97) (FA 7-2-97) (1-03) SUBARTICLEs 9-2.1.1 and 9-2.1.2 (Pages 88 and 89) are deleted. |
D00900DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum Projects |
|
MANDATORY REVISION NO. 4 ADD THIS SPECIAL PROVISION MEASUREMENT AND PAYMENT. (REV 4-7-04) (6-04) SUBARTICLE 9-5.1 (Pages 92) is expanded by the following: |
D00900DC | District Let Contracts. Excluding Lump Sum Projects |
|
MANDATORY REVISION NO. 3 DELETE THIS SPECIAL PROVISION MEASUREMENT AND PAYMENT. (REV 3-19-04) (3-04) SUBARTICLE 9-5.1 (Page 92) is expanded by the following: |
D00900DC | District Let Contracts. Excluding Lump Sum Projects |
|
MANDATORY REVISION NO. 3 DELETE THIS SPECIAL PROVISION MEASUREMENT AND PAYMENT. (REV 5-7-04) (3-04) SUBARTICLE 9-5.1 (Page 92) is expanded by the following: |
D00900DC | District Let Contracts. Excluding Lump Sum Projects |
| CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS. (REV 8-8-03) (1-04) SUBARTICLE 105-5.10 (Page 138). The second paragraph is deleted and the following substituted: |
D1050510 | All Jobs |
|
ENGINEER’S FIELD OFFICE. (REV 5-1-02) (FA 5-14-02) (1-03) PAGE 138. The following new Section is added after Section 105: |
D1090000 | 109-71; 2109-71 |
|
REMOVAL OF EXISTING BULKHEAD. (REV 7-10-95) (FA 6-21-99) (7-00) ARTICLE 110-1 (Page 139) is expanded by the following: |
D1100073 | 110-73; 2110-73 |
|
REMOVAL AND DISPOSAL OF FENDER SYSTEM. (REV 3-18-94) (FA 6-21-99) (7-00) SUBARTICLE 110-6.1 (Page 141) is expanded by the following: |
D1100001 | 110-71-1; 2110-71-1. Modify to suit |
|
MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (7-00) SUBARTICLE 110-11.2 (Page 144) is expanded by the following: |
D1100113 | 110-84; 2110-84 |
|
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (1-03) ARTICLE 120-1 (Pages 147 and 148) is expanded by the following: |
D1200003 | Use when contaminated areas are delineated in the plans |
|
FILL GRAVEL. (REV 3-11-96) (1-04) ARTICLE 120-1 (Pages 147 and 148) is expanded by the following: |
D1200123 | 120-72; 2120-72; plan details required |
|
FILL SAND. (REV 1-3-94) (7-00) PAGE 176. The following new Section is added after Section 125: |
D1420000 | 142-70; 2142-70; (Plans to cover Material and Placement) |
|
STABILIZED SUBBASE UNDER CONCRETE PAVEMENT. (REV 1-3-94) (7-00) ARTICLE 160-3 (Page 181) is expanded by the following: |
D1600003 | Only when called for |
|
ORGANIC SOIL LAYER. (REV 1-19-00) (FA 1-25-00) (7-00) PAGE 190. The following new Section is added after Section 162: |
D162A0000 | 162-4; 2162-4 |
|
STABILIZED SUBBASE. (REV 1-3-94) (7-00) PAGE 192. The following new Section is added after Section 175: |
D1800000 | 180-70; 2180-70 180-71; 2180-71 |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-01) ARTICLE 327-1 (Page 226). The third paragraph is deleted and the following substituted: Insert # ________ |
D3270001 | When the plans provide a location for stockpiling milled material.Insert quantity to be retained. Use all, tons, metric tons, cubic yards or cubic meters |
|
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (7-00) ARTICLE 327-2 (Pages 226 and 227) is expanded by the following: |
D3270004 | Use when requested by districts |
|
SURFACE REQUIREMENTS. (REV 9-23-02) (FA 10-21-02) (7-03) ARTICLE 330-12 (Pages 239-242) is expanded by the following new Subarticle: |
D3300126 | When the design speed is equal to or greater than 50 miles per hour [80 km per hour] |
| SUPERPAVE ASPHALT CONCRETE. (REV 8-8-03) (1-04) SUBARTICLE 334-2.5.1 (Pages 246-247) is deleted and the following substituted: |
D3340251 | 334; 2334 Items |
|
PORTLAND CEMENT CONCRETE. (REV 8-8-03) (1-04) ARTICLE 346-1 (Page 283) is deleted and the following substituted: |
D3460001 | Jobs with Concrete |
|
PATCHING PORTLAND CEMENT CONCRETE PAVEMENT. (REV 2-7-97) (7-00) PAGE 331. The following new Section is added after 353. |
D3540001 | 354-70; 2354-70 (requires D3530000 also) |
|
COMPOSITE PANEL SUPPORT REPAIR. (REV 12-10-93) (7-00) SECTION 400 (of the Supplemental Specifications) is expanded by the following: |
D4000003 | 400-128; 2400-128 |
| PRECAST BULKHEAD PANELS. (REV 7-10-95) (7-00) SUBARTICLE 400-22.1 (of the Supplemental Specifications) is expanded by the following: |
D4000217 | 400-72; 2400-72 (requires plan details) |
| REPLACE GRATES. (REV 2-3-94) (7-00) ARTICLE 425-1 (Page 386) is expanded by the following: |
D4250010 |
425-82; 2425-82 (requires plan details) |
|
DESILTING PIPE. (REV 6-13-95) (FA 6-21-95) (7-00) SECTION 430 (Pages 390-401) is expanded by the following: |
D4300094 | 430-94; 2430-94 |
|
DESILTING CONCRETE BOX CULVERTS. (REV 11-9-93) (7-03) SUBARTICLE 430-12.9(Page 401) is expanded by the following: |
D4300013 | 430-950; 2430-950 |
| DEEP DRAINAGE WELLS. (REV 11-9-93) (7-00) PAGE 409. The following new Section is added after Section 443: |
D440000 | 444-70; 2444-70 444-71; 2444-71 |
| INTEGRAL PILE JACKETS. (REV 9-12-94) (7-00) PAGE 533. The following new Section is added after Section 455: |
D4570001 | 457-70; 2457-70 |
| BARRIER WALL REMOVAL (CONCRETE). (REV 7-10-95) (7-00) ARTICLE 521-1 (of the Supplemental Specifications) is expanded by the following: |
D5210073 | 521-73; 2521-73 (plan details required) |
|
COLORING CONCRETE SURFACES. (REV 4-1-99) (7-00) PAGE 593. The following new Section is added after Section 522: |
D5230000 | 523-70; 2523-70 |
|
MANDATORY REVISION NO. 2 ADD THIS SPECIAL PROVISION SOUND BARRIERS. (REV 11-20-03) (1-04) SECTION 534 (Pages 603-607) is deleted and the following substituted: |
D5340000 | 534-72; 2534-72 |
|
OPAQUE VISUAL BARRIER. (REV 4-13-94) (7-00) PAGE 613. The following new Section is added after Section 538: |
D5390000 | 539-80; 2539-80 (requires plan details) |
|
FENCING. (REV 1-6-98) (7-00) ARTICLE 550-2 (of the Supplemental Specifications) is deleted and the following substituted: |
D5500021 | Type A fencing on non-NHS Projects only |
|
COAL TAR-EPOXY COATING OF PERMANENT BULKHEAD SHEET PILES. (REV 1-3-94) (FA 6-21-99 (7-00) ARTICLE 560-11 (Page 655) is expanded to the following new Subarticle: |
D5600115 | Only when called for |
|
PLASTIC EROSION MAT. (REV 1-5-00) (FA 1-12-00) (7-02) Page 668.The following new Section is added after Section 570: |
D5710000 | 571-1; 2571-1 |
|
REWORKING SHOULDERS. (REV 6-15-99) (1-04) Page 670.The following new Section is added after Section 575: |
D5770000 | 577; 2577 Items |
|
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 766. The following new Section is added after Section 715: |
D7410000 | 741-70; 2741-70 |
|
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 766. The following new Section is added after Section 715: |
D7430000 | 743-70; 2743-70 |
|
TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 766. The following new Section is added after Section 715: |
D7440000 | 744-70; 744-70 |
|
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 10-25-01) (FA 12-21-01) (7-02) PAGE 766. The following new Section is added after Section 715: |
D7450000 | 745-70; 2745-70 |
|
TRAFFIC MONITORING SITE CABINET. (REV 6-21-99) (FA 7-20-99) (7-02) PAGE 766. The following new Section is added after Section 715: |
D7460000 | 746-7; 2746-7 |
|
TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (7-00) PAGE 766. The following new Section is added after Section 715: |
D7470000 | 747; 2747 Items |
|
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE
EQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (7-00) PAGE 766. The following new Section is added after Section 715: |
D7480000 | Jobs with Traffic Monitoring Sites |
|
TRANSPORTATION ENHANCEMENT PROJECTS. (REV 8-6-96) (FA 12-10-96) (1-04) SUBARTICLE 120-9.2 (Page 155) is expanded by the following: |
DENHANCE | For non-vehicular enhancement projects only |
| Supplemental Specifications | SS0000001 | All Jobs |
|
006 CONTROL OF MATERIALS (REV 7-11-03) (FA 8-1-03) (1-04) SECTION 6 (Pages 49-54) is deleted and the following substituted: |
D0060000 | All Jobs |
|
007 WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 2-25-03) (FA 5-16-03) (1-04) ARTICLE 7-16 (Page 69) is deleted and the following substituted: |
D0070016 | All Federal Aid Jobs |
|
008 LIMITATIONS OF OPERATIONS-FENCING. (REV 2-4-03) (FA 5-12-03) (1-04) SUBARTICLE 8-4.8 (Page 76) is deleted and the following substituted: |
D0080480 | Jobs on Limited Access Highways |
|
102 MAINTENANCE OF TRAFFIC. (REV 6-10-03) (FA 6-13-03) (1-04) SUBARTICLE 102-9.5.2 (Page 108) is deleted and the following substituted: |
D1020952 | All Jobs |
|
104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION
AND WATER POLLUTION. (REV 6-10-03) (FA 6-13-04) (1-04) ARTICLE 104-5 (Pages 123-125) is deleted and the following substituted: |
D1040005 | All Jobs |
|
120 ACCEPTANCE PROGRAM-QUALITY CONTROL
TESTS. (REV 6-6-03) (FA 8-1-03) (1-04) SUBARTICLE 120-10.1.4.3 (Page 157) is deleted and the following substituted: |
D1200010 | All Jobs |
|
125 EXCAVATION FOR STRUCTURES AND PIPE-ACCEPTANCE
PROGRAM. (REV 6-5-03) (FA 8-6-03) (1-04) SUBARTICLE 125-9.3 (Page 173) is deleted and the following substituted: |
D1250093 | All Jobs |
|
204 METHOD OF MEASUREMENT-AUTHORIZED VARIABLE THICKNESS
BASE. (REV 6-6-03) (FA 6-10-03) (1-04) SUBARTICLE 204-11.3 (Page 201) is deleted and the following substituted: |
D2040113 | 285-7xx; 2285-7xx |
|
283 RECLAIMED ASPHALT PAVEMENT BASE-COMPACTING AND FINISHING
BASE. (REV 5-19-03) (FA 5-20-03) (1-04) ARTICLE 283-4 (Pages 209 and 210) is deleted and the following substituted: |
D2830004 | 285-7xx; 2285-7xx |
|
287 ASPHALT TREATED PERMEABLE BASE. (REV 7-14-03) (FA 8-1-03) (7-04) PAGE 214. The following new Section is added after Section 286: |
D2870000 | 287; 2287 Items |
|
288 CEMENT TREATED PERMEABLE BASE. (REV 11-5-01) (FA 1-3-02) (7-04) PAGE 214. The following new Section is added after Section 286: |
D2880000 | 288; 2288 Items |
|
338 VALUE ADDED ASPHALT PAVEMENT. (REV 7-14-03) (FA 8-1-03) (1-04) PAGE 278. The following new Section is added after Section 337: |
D3380000 | Jobs with Asphalt (use with D0083700) |
|
355 VALUE ADDED PORTLAND CEMENT CONCRETE PAVEMENT. (REV 7-14-03) (FA 8-1-03) (1-04) PAGE 331. The following Section is added after 353: |
D3550000 | 350; 2350 Items (use with D0083700) |
|
400 CONCRETE STRUCTURES-MATERIALS. (REV 4-22-03) (FA 5-15-03) (1-04) SUBARTICLE 400-5.7.2 (Page 338) is deleted and the following substituted: |
D4000572 | Jobs with Concrete Structures |
|
407 THREE-SIDED PRECAST CULVERT. (REV 5-9-02) (FA 7-11-02) (1-04) ARTICLE 407-1 (Page 367) is deleted and the following substituted: |
D4070002 | Jobs with Box Culverts |
|
410 PRECAST CONCRETE BOX CULVERT. (REV 6-24-02) (FA 7-11-02) (1-04) ARTICLE 410-1 (Page 369) is deleted and the following substituted: |
D4100002 | 410-70, 2410-70 |
|
436 TRENCH DRAIN. (REV 7-21-03) (FA 8-6-03) (1-04) PAGE 405. The following new Section is added after Section 435: |
D4360000 | 436-1; 2436-1 |
|
449 PRECAST CONCRETE DRAINAGE PRODUCTS. (REV 5-29-03) (FA 6-16-03) (1-04) ARTICLE 449-1 (Pages 411). The fourth paragraph is deleted and the following substituted: |
D4490001 | All Jobs |
|
450 MATERIAL ACCEPTANCE AND TESTING- CONCRETE. (REV 5-2-03) (FA 6-19-03) (1-04) SUBARTICLE 450-4.1. (Page 420) is deleted and the following substituted: |
D4500041 |
450 Items 2450 Items |
|
452 PRECAST SEGMENTAL BRIDGE CONSTRUCTION. (REV 1-9-03) (FA 1-28-03) (1-04) PAGE 462. The following new Section is added after Section 451: |
D4520000 | All Precast Segmental Bridge Jobs |
|
453 EPOXY JOINTING OF PRECAST SEGMENTS. (REV 1-28-03) (FA 2-6-03) (1-04) PAGE 490. The following new Section is added after Section 451: |
D4530000 | Jobs with Segmental Bridges |
|
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS. (REV 5-7-01) (FA 10-23-01) (7-03) SUBARTICLE 460-2.1 (Page 535) is deleted and the following substituted: |
D4600000 | Jobs with Structural Steel |
|
461 MULTIROTATIONAL BEARINGS. (REV 4-3-03) (FA 5-20-03) (1-04) SECTION 461 (Pages 554-557) is deleted and the following substituted: |
D4610000 |
461-113; 2461-113 461-114; 2461-114 |
|
465 MOVABLE BRIDGES. (REV 1-10-03) (FA 3-13-03) (1-04) PAGE 557. The following new Section is added after Section 461: |
D4650000 | Movable Bridges Jobs |
|
512 CONTROL HOUSE. (REV 7-25-02) (FA 9-3-02) (7-03) PAGE 584. The following Section is added after Section 510: |
D5120000 | 512; 2512 Items |
|
MANDATORY REVISION NO. 2 DELETE THIS SUPPLEMENTAL SPECIFICATION 534 SOUND BARRIERS. (REV 6-27-03) (FA 8-6-03) (1-04) SECTION 534 (Page 603-607) is deleted and the following substituted: |
D5340000 | 534-72; 2534-72 |
|
561 SELF-CURING INORGANIC ZINC COATING SYSTEMS. (REV 3-18-03) (FA 5-15-03) (1-04) ARTICLE 561-2 (Pages 657 and 658) is deleted and the following substituted: |
D5610002 | 561-1; 2561-1 |
|
580 LANDSCAPING INSTALLATION. (REV 6-23-03) (FA 6-24-03) (1-04) SECTION 580 (Pages 670-675) is deleted and the following substituted: |
D5800000 | Landscaping Jobs (with D0083700) |
|
620 SIGNAL INSTALLATION GROUNDING. (REV 7-12-01) (FA 1-3-02) (1-04) SUBARTICLE 620-3.1 (Page 685). The first paragraph is deleted and the following substituted: |
D6200031 | All Jobs |
|
706 RAISED RETRO-REFLECTIVE PAVEMENT MARKERS AND BITUMINOUS ADHESIVE-METHOD OF MEASUREMENT. (REV 6-10-03) (FA 6-12-03) (1-04) ARTICLE 706-7 (Page 748) is deleted and the following substituted: |
D7060007 | Jobs with RPMs |
|
709 TRAFFIC STRIPES AND MARKINGS-TWO REACTIVE
COMPONENTS.
(REV 8-27-01) (FA 12-19-01) (1-04) PAGE 748. The following new Section is added after 706: |
D7090000 | 709, 2709 Items |
|
710 PAINTED PAVEMENT MARKINGS. (REV 6-10-03) (FA 7-16-03) (1-04) SECTION 710 (Pages 748-752) is deleted and the following substituted: |
D7100000 | 710; 2710 Items |
|
713 PREFORMED PAVEMENT STRIPES AND MARKINGS. (REV 9-17-01) (FA 12-19-01) (7-02) SECTION 713 (Pages 758-760) is deleted and the following substituted: |
D7130041 | When called for |
|
714 MOTORIST AID CALL BOX RELOCATION. (REV 11-30-00) (FA 2-2-01) (7-01) PAGE 760. The following new Section is added after Section 713: |
D7140000 | 714-1, 2714-1; 400-2, 2400-2 (requires plan details) |
|
926 EPOXY COMPOUNDS. (REV 6-11-03) (FA 8-6-03) (1-04) ARTICLE 926-1 (Pages 808 and 809) is deleted and the following substituted: |
D9260001 | Jobs with Concrete |
|
937 ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS. (REV 7-15-03) (FA 8-6-03) (1-04) SECTION 937 (Pages 844-846) is deleted and the following substituted: |
D9370000 | All Jobs |
|
938 POST-TENSION GROUT. (REV 1-9-03) (FA 1-28-03) (7-03) PAGE 846.The following new Section is added after 937: |
D9380000 | Post-Tensioning Jobs and Jobs with cylinder piles |