Specifications and Estimates
Implemented Modifications to the 2000 Standard Specifications
January 2002 Workbook
for Lettings Effective January 2002 - June 2002
Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Change Table - Shows all changes made to the Specifications within this workbook.
Note: These files are in Adobe Acrobat (PDF) format.
File size ranges from 9 kb to 279 kb.
| SPECIAL PROVISIONS | SP0000001 | All Jobs |
|---|---|---|
| INTENT AND SCOPE. ARTICLE 4-1 (Page 17) is expanded by the following: The Improvements under this Contract consist of (Place description here). The summary of pay items for this project is listed in the plans.Insert # ________ The summary of pay items for this project is listed in the plans. |
D0040002 | All Jobs, except Lump Sum |
| INTENT AND SCOPE. ARTICLE 4-1 (Page 18) is deleted and the following substituted: Insert # _________ |
D00401LS | All Lump Sum Projects |
|
(REV 8-22-96) (FA 9-3-96) (7-00) For this Contract, the Department will reject any bid in which the bidder submits proposed Contract time in excess of _________ calendar days. Insert # _________ |
D0040091 | A+B Bidding. (Use with proper authority). Use with D00200AB, D00300AB, D00800Aand D00800AB |
|
(REV 2-8-94) (7-00) It is anticipated that construction by others will be underway at each end and within this project during the life of this Contract. Coordinate construction operations with those of other Contractors as necessary. |
D0040010 | When other Contractors are working in the vicinity |
| DEFINITIONS. (REV 12-30-94) (FA 5-26-95) (7-00) ARTICLE 1-3 (Pages 2-10). The definition of Controlling Work Items is deleted andthe following substituted: |
D0010013 | CPM Jobs |
| PROPOSAL REQUIREMENTS AND CONDITIONS. (REV 7-27-00) (1-01) ARTICLE 2-2 (of the Supplemental Specifications). Beginning with the third paragraph to the end of Article 2-2, the text is deleted. |
D00201DC | All District Let and Maintenance Contracts |
| EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND SITE OF WORK. (REV 4-19-99) (1-02) ARTICLE 2-4 (of the Supplemental Specifications) is expanded by the following: Insert # __________ |
D0020024 | All Jobs, (add a phone number or e-mail address) |
| PREPARATION OF PROPOSALS. (REV 11-5-97) (FA 1-25-98) (7-00) SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded as follows: |
D00200AB | 99-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00300AB, D0040091, D00800AB and D008007A |
| PREPARATION OF PROPOSALS. (REV 4-29-97) (FA 5-7-97) (7-00) SUBARTICLE 2-5.1 (of the Supplemental Specifications) is expanded by the following: Insert # __________ |
D00200LR | 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with D00300LR, D00800LR and D00801LR |
| AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) ARTICLE 3-1 (of the Supplemental Specifications). The first and second sentences are deleted and the following substituted: Insert # _________ |
D00300AB | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D0040091,D008007A and D00800AB |
| AWARD AND EXECUTION OF CONTRACT. (REV 7-27-00) (1-01) ARTICLE 3-1 (of the Supplemental Specifications). The first paragraph is expanded by the following: Insert # _________ |
D00300DC | All District Let and Maintenance Contracts excluding Lump Sum |
| AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) ARTICLE 3-1 (of the Supplemental Specifications). The first paragraph is deleted and the following substituted: |
D00300LS | Lump Sum Projects |
| AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) ARTICLE 3-1 (of the Supplemental Specifications). The first and second sentences are deleted and the following substituted: |
D00300LR | 999-5, 2999-5; Lane Rental. (Use with proper authority). Use with D00200LR, D00800LR and D00801LR |
| AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (1-02) ARTICLE 3-2 (of the Supplemental Specifications) is expanded by the following: Insert # _________ *Contracts Office must approve |
D0032000 | When necessary to change standard “Award and Execution”* |
| AWARD AND EXECUTION OF CONTRACT. (REV 2-7-97) (7-00) SUBARTICLE 3-2.1 (of the Supplemental Specifications) is deleted and the following substituted: |
D00300003 | Bid Average Method (Use with proper authority) |
| ALTERATION OF PLANS OR OF CHARACTER OF WORK. (REV 8-1-00) (1-01) SUBARTICLE 4-3.1 (of the Supplemental Specifications) is deleted and the following substituted: |
D00403LS | Lump Sum Projects |
| VALUE ENGINEERING INCENTIVE. (REV 8-12-96) (FA 7-2-97) (7-00) SUBARTICLE 4-3.9 (of the Supplemental Specifications) is deleted. |
D00400DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
| UNFORESEEABLE WORK. (REV 9-28-98) (7-00) ARTICLE 4-4 (Page 25) is deleted and the following substituted: |
D0040004 | 999-25 2999-25 |
| DESIGN STANDARDS (ENGLISH UNITS). (REV 10-3-02) (1-03) SUBARTICLE 5-1.1 (Page 26). The "Design Standards" booklet for English Units, dated January 2002, is modified as follows: |
D005011E | All English Jobs |
| ROADWAY AND TRAFFIC DESIGN STANDARDS (METRIC UNITS). (REV 8-9-02) (1-03) SUBARTICLE 5-1.1 (Page 26). The "Design Standards" booklet for English Units, dated January 2000, is modified as follows: |
D005011M | All Metric Jobs |
| CONTROL OF THE WORK. (REV 3-15-02) (1-03) SUBARTICLE 5-1.1 (of the Supplemental Specifications) is expanded by the following: |
D00500LS | Lump Sum Projects |
| INSPECTION. (REV 2-10-94) (7-00) SUBARTICLE 5-9.1 (Page 40) is expanded by the following: Insert # __________ |
D0050091 | Long bridge jobs (1500 feet [450 m] or longer); modify to suit |
| CONTROL OF MATERIALS. (REV 1-9-01) (7-01) ARTICLE 6-1 (Pages 49 and 50) is expanded by the following new Subarticles: |
D00600LS | Lump Sum Projects |
| LAWS TO BE OBSERVED. (REV 2-1-02) (1-04) SUBARTICLE 7-1.1 (54 and 56) is expanded by the following: |
D0070011 | Federal Aid Jobs |
| ENDANGERED SPECIES. REV 2-10-94) (7-00) SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following: |
D0070010 | When called for (woodpecker) |
|
ENDANGERED SPECIES. (REV 2-27-96) (FA 3-26-96) (7-00) SUBARTICLE 7-1.4 (Pages 57 and 58) is expanded by the following: |
D0070014 | When called for (Manatees and/or turtles) |
| PERMITS PROCURED BY THE DEPARTMENT. (REV 2-10-94) (7-00) SUBARTICLE 7-2.1 (Page 58) is expanded by the following: |
D0070021 | Jobs with permit(s) procured by DOT |
| PERMITS PROCURED BY THE CONTRACTOR. (REV 12-18-00) (1-01) SUBARTICLE 7-2.1 (Page 58) is expanded by the following: |
D0070022 | Jobs with buildings |
| DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THEU.S. AND WATERS OF THE STATE. (REV 2-21-01) (7-01) SUBARTICLE 7-2.2 (Page 58) is expanded by the following: |
D0070002 | When DEP Generic Permit is required |
| LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 1-9-01) (7-01) SUBARTICLE 7-7.1 (Page 59) is expanded by the following: Insert # ________ |
D00700DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum |
| STRUCTURES OVER NAVIGATABLE WATERS. (REV 2-10-94) (7-00) ARTICLE 7-8 (Page 61) is expanded by the following: |
D0070080 | When work platforms are indicated in the permit for construction |
| USE OF EXPLOSIVES. (REV 9-26-94) (7-00) ARTICLE 7-9 (Page 61) is deleted and the following substituted: |
D0070008 | When explosives are prohibited |
| UTILITY WORK. (REV 2-10-94) (7-00) SUBARTICLE 7-11.6.3 (Pages 65 and 66) is expanded by the following: |
D0071164 | When no utility work is anticipated |
| UTILITY WORK. (REV 8-27-01) ((7-02) SUBARTICLE 7-11.6.3 (Pages 65 and 66) is expanded by the following: |
D0070118 | When there is Utility work |
| WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 8-27-99) (FA 11-16-99) (7-01) ARTICLE 7-16 (of the Supplemental Specifications) is expanded by the following: Insert # ________ |
D0070160 | All Federal Aid Jobs |
| DISADVANTAGED BUSINESS ENTERPRISE PROGRAM. (REV 6-6-02) (FA 7-17-02) (1-03) SECTION 7 (Pages 54-71) is expanded by the following: |
D0070025 | All Jobs |
| SUBLETTING CONTRACTS. (REV 2-14-94) (7-00) SUBARTICLE 8-1.1 (Page 71) is expanded by the following: |
D0080010 | Pressure Epoxy Grouting pay item "Injecting and Sealing Prestressed Beams" |
| PROSECUTION AND PROGRESS. (REV 8-1-00) (1-01) SUBARTICLE 8-1.2 (Page 72) is deleted. |
D00800LS | Lump Sum Projects |
| SPECIALTY WORK. (REV 9-28-98) (7-00) SUBARTICLE 8-1.2 (Page 72). The text is deleted and the following substituted: Insert #___________ |
D0080012 | For Contracts not normally performed by Road and Bridge Contractors |
| SUBMISSION OF WORKING SCHEDULE. REV 11-29-99) (FA 12-7-99) (7-00) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted: |
D0080032 | Use only when authorized by District Construction Engineer. Do not use with D0080003, D0080039 or D00800DC |
| SUBMISSION OF WORKING SCHEDULE. (REV 11-29-99) (FA 12-21-99) (7-00) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted and the following substituted: |
D0080039 | Use only when authorized by District Construction Engineer. Do not use with D0080003, D0080032 or D00800DC |
| PROSECUTION AND PROGRESS. (REV 2-27-01) (1-03) SUBARTICLE 8-3.2 (Pages 73 and 74) is deleted. |
D00800DC | District Let Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts. Do not use with D0080003, D0080039, D0080048 or D0080050 |
| PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 8-2-96) (FA 9-4-96) (1-03) SUBARTICLE 8-3.3 (Page 74) is deleted and the following substituted: Insert # ________ *Contracts Office must be notified |
D0080083 | When called for* |
| BEGINNING WORK. (REV 7-10-95) (7-00) SUBARTICLE 8-3.3 (Page 74). The last sentence is deleted and the following substituted: Insert # ________ |
D0080330 | When called for by the District Construction Engineer |
| BEGINNING WORK. (REV 10-22-98) (FA 11-5-98) (7-00) SUBARTICLE 8-3.3 (Page 74) is expanded by the following substituted: Insert # ________ *Contracts Office must be notified |
D0080033 | Only when called for by the District Construction Engineer |
| PROSECUTION OF WORK - PARTNERING. (REV 3-4-98) (FA 5-26-98) (7-00) ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle: Insert # _______ *Contracts Office must be notified |
D0080036 | 999-16* |
| PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 4-15-02) (FA 7-17-02) (1-03) ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle: |
D0080037 | 999-20* 2999-20* |
| PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD. (REV 4-1-02) (1-03) ARTICLE 8-3 (Pages 73 and 74) is expanded by the following new Subarticle: |
D0080370 | Jobs without 999-20; 2999-20 |
| LIMITATIONS OF OPERATIONS. (REV 2-14-94) (7-00) SUBARTICLE 8-4.1 (Pages 74 and 75) is expanded by the following:Insert#______________ |
D0080048 | When certain night work hours are required. Must be modified to show work hours. (Use when requested by proper authority). Do NOT use with D00800DC |
| LIMITATIONS OF OPERATIONS. (REV 2-14-94) (7-00) SUBARTICLE 8-4.1 (Pages 74 and 75) is expanded by the following: |
D0080050 | Modify as appropriate (use only when required). Do NOT use with D00800DC |
| HAZARDOUS OR TOXIC WASTE - MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (7-00) SUBARTICLE 8-4.9 (Page 76) is expanded by the following: Insert # ________ *Insert Hazardous Waste Coordinator and contact number |
D0080049 | Jobs with Lighting* |
| COMPUTATION OF CONTRACT TIME. REV 7-24-96) (FA 9-3-96) (7-00) SUBARTICLE 8-7.1 (Page 78) is deleted and the following substituted: |
D008007A | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D00300AB,D0080091 and D00800AB |
| COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (7-00) SUBARTICLE 8-7.1 (Page 79) is expanded by the following: Insert # ________ |
D0080072 | Use when requested by proper authority, (must be modified) |
| COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (7-00) SUBARTICLE 8-7.1 (Page 78) is expanded by the following: Insert # _______ |
D0080076 | Only when called for (must be modified) |
| COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (7-00) SUBARTICLE 8-7.1 (Page 78) is expanded by the following: |
D0080700 | Use when requested by proper authority |
| PROSECUTION AND PROGRESS. (REV 7-28-97) (7-00) SECTION 8 (Pages 71-84) is expanded by the following new Article: |
D00800D0 | All Jobs with Alternative Bidding. (Use with proper authority) |
| 8-13. Incentive - Disincentive for A+B. (REV 3-8-99) (7-00) Insert # _________ |
D00800AB | 999-10, 2999-10; A+B Bidding. (Use with proper authority). Use with D00200AB, D003000AB,D0040091 and D008007A |
| 8-13. “No Excuse Bonus” Payment and Waiver of Contractor Claims. (REV 3-8-99) (7-01) Insert # _________ |
D0080016 | Bonus (Date Specific) (Use with proper authority) |
| 8-13. “No Excuse Bonus” Payment and Waiver of Contractor Claims. (REV 3-8-99) (7-01) Insert # _________ |
D0080D16 | Bonus (Calendar Days) (Use with proper authority) |
| 8-13. “No Excuse Bonus” Payment and Waiver of Contractor Claims. (REV 8-8-02) (1-03) Insert # _________ |
D00800MS | Milestone Bonus (Use with proper authority). Do not use with D0081600 or D0080D16 |
| 8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert # _________ |
D0080017 | Liquated Savings. (Use with proper authority) |
| 8-13. Incentive - Disincentive. (REV 3-8-99) (7-00) Insert # _________ |
D00800ID | Incentive - Disincentive. (Use with proper authority) |
| 8-13. Incentive - Disincentive. (REV 8-8-02) (1-03) Insert # __________ |
D008IDMS | Milestone Incentive-Disincentive. (Use with proper authority). Do not use with D00800ID |
| 8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) |
D00800LR | 999-5, 2999-5; Lane Rental. (Use with proper authority) |
| 8-13. Damage Recovery. (REV 4-11-97) (FA 5-7-97) (7-00) Insert # __________ |
D00801LR | 999-5, 2999-5; Lane Rental. (Use with proper authority) |
| 8-13. Incentive - Disincentive for Lane Rental Days. (REV 8-8-02) (1-03) Insert # __________ |
D008IDLR | Incentive-Disincentive for Lane Rental Days. (Use with proper authority). Do not use with D00800LR or D00801LR |
| MEASUREMENT AND PAYMENT. (REV 6-7-02) (1-03) SUBARTICLE 9-1.3 (of the Supplemental Specifications) is deleted and the following substituted: |
D00900LS | Lump Sum Projects |
| MEASUREMENT AND PAYMENT. (REV 5-7-97) (FA 7-2-97) (1-03) SUBARTICLES 9-2.1.1 and 9-2.1.2 (of the Supplemental Specifications) are deleted. |
D00900DC | District Let Contracts less than $250,000 and all Maintenance Contracts. Excluding Lump Sum Projects |
| ACCEPTANCE AND FINAL PAYMENT. (REV 1-13-03) (7-03) ARTICLE 9-8 (of the Supplemental Specifications) is deleted and the following substituted: |
D0090008 | All Jobs |
| MANDATORY REVISION NO. 1 ADD THIS SPECIAL PROVISION 104 PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION. (REV 6-10-03) (7-03) SUBARTICLE 104-5 (Pages 118 and 119) is deleted and the following substituted: |
D1040005 | All Jobs |
| MANDATORY REVISION NO. 1 ADD THIS SPECIAL PROVISION MAINTENANCE OF EROSION CONTROL. (REV 6-10-03) (7-03) SUBARTICLE 104-7.1 (Page 123) is deleted and the following substituted: |
D1040071 | All Jobs |
| ENGINEER’S FIELD OFFICE. REV 5-1-02) (FA 5-14-02) (1-03) PAGE 125. The following new Section is added after Section 104: |
D1090000 | 109-71; 2109-71 |
| REMOVAL OF EXISTING BULKHEAD. (REV 7-10-95) (FA 6-21-99) (7-00) ARTICLE 110-1 (of the Supplemental Specifications) is expanded by the following: |
D1100073 | 110-73; 2110-73 |
| REMOVAL AND DISPOSAL OF FENDER SYSTEM. (REV 3-18-94) (FA 6-21-99) (7-00) SUBARTICLE 110-6.1 (of the Supplemental Specifications) is expanded by the following: |
D1100001 | 110-71-1; 2110-71-1. Modify to suit |
| MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (7-00) SUBARTICLE 110-11.2 (of the Supplemental Specifications) is expanded by the following: |
D1100113 | 110-84; 2110-84 |
| EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (1-03) ARTICLE 120-1 (of the Supplemental Specifications) is expanded by the following: |
D1200003 | Use when contaminated areas are delineated in the plans |
| FILL GRAVEL. (REV 3-11-96) (7-00) ARTICLE 120-1 (of the Supplemental Specifications) is expanded by the following: |
D1200123 | 120-72; 2120-72; plan details required |
| FILL SAND. (REV 1-3-94) (7-00) PAGE 160. The following new Section is added after Section 125: |
D1420000 | 142-70; 2142-70; (Plans to cover Material and Placement) |
| STABILIZED SUBBASE UNDER CONCRETE PAVEMENT. (REV 1-3-94) (7-00) ARTICLE 160-3 (of the Supplemental Specifications) is expanded by the following: |
D1600003 | Only when called for |
| STABILIZING-ACCEPTANCE PROGRAM. (REV 2-4-03) (7-03) ARTICLE 160-7 (of the Supplemental Specifications) is expanded by the following: |
D1600007 | 160; 2160 Items |
| ORGANIC SOIL LAYER. (REV 1-19-00) (FA 1-25-00) (7-00) PAGE 171. The following new Section is added after Section 162: |
D162A0000/td> | 162-4; 2162-4 |
| BLANKET MATERIAL. (REV 10-22-99) (FA 1-20-00) (7-00) PAGE 171. The following new Section is added after Section 162: |
D16300000 | 163-1; 2163-1 |
| STABILIZED SUBBASE. (REV 1-3-94) (7-00) PAGE 180. The following new Section is added after Section 175: |
D1800000 | 180-70; 2180-70 180-71; 2180-71 |
| MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-01) ARTICLE 327-1 (of the Supplemental Specifications). The third paragraph is deleted and the following substituted: Insert # ________ |
D3270001 | When the plans provide a location for stockpiling milled material. Insert quantity to be retained. Use all, tons, metric tons, cubic yards or cubic meters |
| MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (7-00) ARTICLE 327-2 (of the Supplemental Specifications) is expanded by the following: |
D3270004 | Use when requested by districts |
| SURFACE REQUIREMENTS. (REV 4-29-98) (FA 5-26-98) (7-02) ARTICLE 330-12.6 (of the Supplemental Specifications) is expanded by the following new Subarticle: |
D3300126 | Use on limited access or other high-speed roadways where the design speed is equal to or greater than 50 miles per hour [80 km per hour] |
| PATCHING PORTLAND CEMENT CONCRETE PAVEMENT. (REV 2-7-94) (7-00) PAGE 373. The following new Section is added after 352. |
D3540001 | 354-70; 2354-70 (requires D3530000 also) |
| COMPOSITE PANEL SUPPORT REPAIR. (REV 12-10-93) (7-00) SECTION 400 (of the Supplemental Specifications) is expanded by the following: |
D4000003 | 400-128; 2400-128 |
| PRECAST BULKHEAD PANELS. (REV 7-10-95) (7-00) SUBARTICLE 400-22.1 (of the Supplemental Specifications) is expanded by the following: |
D4000217 | 400-72; 2400-72 (requires plan details) |
| REPLACE GRATES. (REV 2-3-94) (7-00) ARTICLE 425-1 (Page 386) is expanded by the following: |
D4250010 | 425-82; 2425-82 (requires plan details) |
| DESILTING PIPE. (REV 6-13-95) (FA 6-21-95) (7-00) SECTION 430 (of the Supplemental Specifications) is expanded by the following: |
D4300094 | 430-94; 2430-94 |
| DESILTING CONCRETE BOX CULVERTS. (REV 11-9-93) (7-03) SECTION 430 (of the Supplemental Specifications) is expanded by the following: |
D4300013 | 430-950; 2430-950 |
| DEEP DRAINAGE WELLS. (REV 11-9-93) (7-00) PAGE 459. The following new Section is added after Section 443: |
D440000 | 444-70; 2444-70 444-71; 2444-71 |
| PRECAST SEGMENTAL BRIDGE CONSTRUCTION. (REV 1-10-03) (7-03) PAGE 524. The following new Section is added after Section 451: |
D4520000 | All Precast Segmental Bridge Jobs |
| INTEGRAL PILE JACKETS. (REV 9-12-94) (7-00) PAGE 598. The following new Section is added after Section 455: |
D4570001 | 457-70; 2457-70 |
| BARRIER WALL REMOVAL (CONCRETE). (REV 7-10-95) (7-00) ARTICLE 521-1 (of the Supplemental Specifications) is expanded by the following: |
D5210073 | 521-73; 2521-73 (plan details required) |
| COLORING CONCRETE SURFACES. (REV 4-1-99) (7-00) PAGE 654. The following new Section is added after Section 522: |
D5230000 | 523-70; 2523-70 |
| OPAQUE VISUAL BARRIER. (REV 4-13-94) (7-00) PAGE 672. The following new Section is added after Section 538: |
D5390000 | 539-80; 2539-80 (requires plan details) |
| FENCING. (REV 1-6-98) (7-02) ARTICLE 550-2 (Page 681). The text is deleted and the following substituted: |
D5500021 | Type A fencing on non-NHS Projects only |
| COAL TAR-EPOXY COATING OF PERMANENT BULKHEAD SHEET PILES. (REV 1-3-94) (FA 6-21-99) (7-00) ARTICLE 560-11 (Pages 691 and 692) is expanded to the following new Subarticle: |
D5600115 | Only when called for |
| GRASSING (BY SEEDING)-WATERING. (REV 3-10-00) (1-01) ARTICLE 570-3.6 (Page 700) is deleted and the following substituted: |
D5700036 | Seeding Jobs |
| PLASTIC EROSION MAT. (REV 1-5-00) (FA 1-12-00) (7-02) Page 702.The following new Section is added after Section 570: |
D5710000 | 571-1; 2571-1 |
| PAINTING TRAFFIC STRIPES. (REV 7-25-01) (1-02) SUBARTICLE 710-4.1 (Page 780) is expanded by the following: |
D7100041 | Jobs with Traffic Paint |
| TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7410000 | 741-70; 2741-70 |
| TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7430000 | 743-70; 2743-70 |
| TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV 6-16-99) (FA 7-20-99) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7440000 | 744-70; 744-70 |
| TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 10-25-01) (FA 12-21-01) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7450000 | 745-70; 2745-70 (use with D6600062) |
| TRAFFIC MONITORING SITE CABINET. (REV 6-21-99) (FA 7-20-99) (7-02) PAGE 797. The following new Section is added after Section 715: |
D7460000 | 746-7; 2746-7 |
| TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (7-00) PAGE 797. The following new Section is added after Section 715: |
D7470000 | 747; 2747 Items |
| GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITEEQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (7-00) PAGE 797. The following new Section is added after Section 715: |
D7480000 | Jobs with Traffic Monitoring Sites |
| POLE CABLE DISTRIBUTION SYSTEM-QUALIFIED PRODUCTS LIST. (REV 12-13-02) (7-03) ARTICLE 992-12 (Pages 957-960) is expanded by the following new Subarticle: |
D9920012 | Highway Lighting Jobs |
| TRANSPORTATION ENHANCEMENT PROJECTS. (REV 8-6-96) (FA 12-10-96) (1-04) SUBARTICLE 120-9.2 (of the Supplemental Specifications) is expanded by the following: |
DENHANCE | For non-vehicular enhancement projects only |
| Supplemental Specifications | SS0000001 | All Jobs |
| 002 PROPOSAL REQUIREMENTS AND CONDITIONS. (REV 8-9-02) (FA 9-27-02) (7-03) SECTION 2 (Pages 10-15) is deleted and the following substituted: |
D0020000 | All Class I Projects |
| 003 AWARD AND EXECUTION OF CONTRACT. (REV 5-22-02) (FA 7-24-02) (1-03) SECTION 3 (Pages 15-18) is deleted and the following substituted: |
D0030000 | All Jobs |
| 004 ALTERATION OF PLANS OR OF CHARACTER OF WORK. (REV 1-10-00) (FA 1-12-00) (7-02) ARTICLE 4-3 (Pages 18-25) is deleted and the following substituted: |
D0040003 | All Jobs |
| 005 CONTROL OF WORK. (REV 4-10-02) (FA 8-19-02) (1-03) SUBARTICLE 5-8.4 (Pages 39 and 40) is deleted and the following substituted: |
D00500844 | All Jobs |
| 005 CLAIMS BY CONTRACTOR. (REV 1-10-00) (FA 1-12-00) (2-00) ARTICLE 5-12 (Pages 41-48) is deleted and the following substituted: |
D00500122 | All Jobs |
| 006 CONTROL OF MATERIALS (REV 12-19-01) (FA 1-3-02) (7-02) SUBARTICLE 6-3.2 (Page 50) is expanded by the following new Subarticle: |
D0060032 | All Jobs |
| 007 LAWS TO BE OBSERVED. (REV 5-14-02) (FA 12-12-02) (7-03) ARTICLE 7-1 (Pages 54-57) is expanded by the following new Subarticle: |
D0070017 | All Jobs |
| 007 RESPONSIBILITY FOR DAMAGES, CLAIMS, ETC.
(REV 1-31-01) (FA 4-11-01) (2-01) ARTICLE 7-12 (Pages 66 and 67) is deleted and the following substituted: |
D00700122 | All Jobs |
| 007 WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 8-27-99) (FA 11-16-99) (7-00) ARTICLE 7-16 (Page 69). The text is deleted and the following substituted: |
D0070016 | All Federal Aid Jobs |
| 007 SUBMITTAL OF WAGE RATE SUMMARY. (REV 11-28-00) (FA 2-5-01) (7-01) ARTICLE 7-23 (Page 71). The text is deleted and the following substituted: |
D0070023 | All Jobs |
| 008 TEMPORARY SUSPENSION OF CONTRACTOR�S OPERATIONS.
(REV 11-2-99) (FA 11-12-99) (7-00) ARTICLE 8-6 (Pages 77 and 78) is deleted and the following substituted: |
D0080006 | All Jobs |
| 008 PROSECUTION AND PROGRESS �ADJUSTING CONTRACT TIME.
(REV 4-3-01) (FA 5-8-01) (1-02) ARTICLE 8-7.3 (Pages 78-80) is deleted and the following substituted: |
D0080073 | All Jobs |
| 008 DEFAULT AND TERMINATION OF CONTRACT.
(REV 4-24-00) (FA 6-1-00) (1-01) ARTICLE 8-9 (Pages 81-83) is deleted and the following substituted: |
D0080091 | All Jobs |
| 008 AMOUNT OF LIQUIDATED DAMAGES.
(REV 3-15-01) (FA 6-14-01)(1-02) SUBARTICLE 8-10.2 (Page 83) is deleted and the following substituted: |
D0080102 | All Jobs |
| 009 MEASUREMENT AND PAYMENT.
(REV 11-16-00) (FA 2-1-01) (7-01) SUBARTICLE 9-1.5 (Pages 85-86) is deleted and the following substituted: |
D0090015 | All Jobs |
| 009 SCOPE OF PAYMENTS.
(REV 10-26-00) (FA 11-17-00) (1-02) ARTICLE 9-2 (Pages 86-89) is deleted and the following substituted: |
D0090002 | All Jobs |
| 009 COMMON CARRIER FREIGHT RATES.
(REV 8-9-00) (FA 11-17-00) (7-01) ARTICLE 9-4 (Pages 91-95) is deleted. |
D0090004 | All Jobs Do not use with D00900DC |
| 009 PARTIAL PAYMENTS.
(REV 11-22-00) (FA 2-7-01) (7-01) ARTICLE 9-6 (Pages 95-99) is deleted and the following substituted: |
D0090006 | All Jobs |
| 009 MEASUREMENT AND PAYMENT.
(REV 1-11-01) (FA 2-5-01) (7-01) SECTION 9 (Pages 84-101) is deleted and the following substituted: |
D0090007 | All Jobs |
| 009 ACCEPTANCE AND FINAL PAYMENT.
(REV 5-13-99) (FA 12-3-99) (7-00) ARTICLE 9-9 (Pages 100 and 101) is deleted and the following substituted: |
D0090009 | All Jobs |
| 102 MAINTENANCE OF TRAFFIC.
(REV 4-11-00) (FA 5-1-00) (1-01) SUBARTICLE 102-1.4 (Page 105) is deleted and the following substituted: |
D1020014 | All Jobs |
| 102 TRAFFIC CONTROL - MOT DEVICES.
(REV 11-20-95) (FA 1-16-96) (7-01) SUBARTICLE 102-3.2 (Pages 107 and 108) is expanded as follows: |
D1020326 | All Jobs |
| 102 TRAFFIC CONTROL - USE OF ORANGE VESTS.
(REV 1-6-98) (FA 2-2-98) (7-00) ARTICLE 102-3 (Pages 106-111) is expanded by the following new Subarticle: |
D1020327 | All Jobs |
| 102 WORK ZONE SIGNS.
(REV 12-11-97) (FA 1-6-98) (7-02) ARTICLE 102-3 (Pages 106-111) is expanded by the following new Subarticle: |
D1020060 | 102-60; 2102-60 (Also use D10200A5) |
| 102 MAINTENANCE OF TRAFFIC - DETOURS.
(REV 2-12-01) (FA 6-14-01) (1-02) SUBARTICLE 102-4.2 (Pages 111-112). The following text is inserted after the thirdparagraph: |
D1020042 | Jobs with Detour Bridges |
| 102 TRUCK MOUNTED ATTENUATORS.
(REV 4-27-00) (FA 11-17-00) (7-01) SUBARTICLE 102-7.1 (Page 114) is expanded by the following: |
D1020071 | All Jobs |
| 104 CONSTRUCTION REQUIREMENTS-ARTIFICIAL COVERINGS.
(REV 5-8-00) (FA 5-15-00) (1-01) ARTICLE 104-6 (Pages 119-123) is expanded by the following new Subarticle: |
D1040006 | 104-1; 2104-1 |
| 110 CLEARING AND GRUBBING.
(REV 6-29-01) (FA 7-27-01) (1-02) SECTION 110 (Pages 126-134) is deleted and the following substituted: |
D1100000 | 110; 2110 Items |
| 120 EXCAVATION AND EMBANKMENT.
(REV 2-14-01) (FA 5-8-01) (1-02) SECTION 120 (Pages 135-150) is deleted and the following substituted: |
D1200000 | All Jobs |
| 125 BACKFILLING.
(REV 9-12-00) (FA 12-5-00) (7-01) SUBARTICLE 125-8.2 (Page 155). The heading is deleted and the following substituted: |
D1250082 | All Jobs |
|
125 COMPACTION.
(REV 9-12-00) (FA 9-18-00) (7-01) SUBARTICLE 125-8.3.3 (Page 157) is expanded by the following: |
D1250008 | 125; 2125 Items |
|
145 GEOSYNTHETIC REINFORCEMENT. (REV 11-1-99) (FA 11-4-99) (7-00) PAGE 160. The following new Section is added after Section 125: |
D1450000 | 145; 2145 Items |
|
234 SUPERPAVE ASPHALT BASE.
(REV 6-14-01) (FA 7-12-01) (1-02) PAGE 192. The following new Section is added after Section 230. |
D2340000 | 285-7; 2285-7 |
|
280 ASPHALT BASE COURSES. (REV 6-14-01) (FA 7-11-01) (1-02) SECTION 280 (Page 207-209) is deleted and the following substituted: |
D2800000 | 285-7; 2285-7 |
|
285 OPTIONAL BASE COURSE. (REV 5-8-00) (FA 1-19-01) (7-01) SECTION 285 (Pages 211-213) is deleted and the following substituted: |
D2850000 | 285-7; 2285-7 |
|
286 TURNOUT CONSTRUCTION-METHOD OF MEASUREMENT. (REV 6-20-00) (FA 9-13-00) (7-01) ARTICLE 286-5 (Page 214) is deleted and the following substituted |
D2860005 | 286; 2286 Items |
|
300 APPLICATION OF TACK COAT-WHERE REQUIRED. (REV 4-3-00) (FA 8-29-00) (7-01)
|
D3000072 | Jobs with Asphalt |
|
320 HOT BITUMINOUS MIXTURES-PLANT, METHODS, AND EQUIPMENT. (REV 8-30-00) (FA 8-30-00) (7-01) SECTION 320 (Pages 233-241) is deleted and the following substituted: |
D3200000 | Jobs with Asphalt |
|
327 MILLING OF EXISTING ASPHALT PAVEMENT-METHOD
OF MEASUREMENT. (REV 6-20-00) (FA 9-6-00) (7-01) ARTICLE 327-5 (Page243). The text is deleted and the following substituted: |
D3270005 | 327-70; 2327-70 |
|
330 HOT BITUMINOUS MIXTURES - QUALITY ASSUSRANCE, GENERAL CONSTRUCTION REQUIREMENTS AND ACCEPTANCE PROCEDURES. (REV 11-7-00) (FA 11-28-00) (7-01)
|
D3300000 | Jobs with Asphalt |
|
331 TYPE S ASPHALT CONCRETE. (REV 4-30-00) (FA 8-30-00) (7-01) ARTICLE 331-1 (Pages 266-268) is deleted and the following substituted: |
D3310001 | Jobs with Asphalt |
|
331 TYPE S ASPHALT CONCRETE. (REV 10-25-00) (FA 11-17-00) (7-01) SUBARTICLE 331-2.1 (Page 269) is deleted and the following substituted: |
D3310002 | Jobs with Asphalt |
|
331 VISCOSITY OF ASPHALT IN MIXES
CONTAINING RAP. (REV 8-3-00) (FA 10-4-00) (7-01) SUBARTICLE 331-4.4.4 (Page 274). The last paragraph is deleted and the following substituted: |
D3310044 | Jobs with Asphalt |
|
334 SUPERPAVE ASPHALT CONCRETE. (REV 10-25-00) (FA 11-17-00) (7-01)
SECTION 334 (Pages 283-304) is deleted and the following substituted: |
D3340000 | Jobs with Asphalt |
|
336 ASPHALT RUBBER BINDER. (REV 8-3-00) (FA 10-4-00) (7-01) SUBARTICLE 336-2.1 (Page 306) is deleted and the following substituted: |
D3360021 | 334, 2334; 337, 2337; 341, 2341 Items |
|
336 ASPHALT RUBBER BINDER-TESTING. (REV 4-3-00) (FA 8-29-00) (7-01) SUBARTICLE 336-5.3.1(3) (Page 307) is deleted and the following substituted: |
D3360053 | Jobs with Asphalt |
|
337 ASPHALT CONCRETE FRICTION COURSES.
REV 4-3-00) (FA 8-29-00)
(7-01) SECTION 337 (Pages 309- 317) is deleted and the following substituted: |
D3370000 | Jobs with Asphalt |
|
339 MISCELLANEOUS ASPHALT PAVEMENT. (REV 2-11-00) (FA 3-30-00) (1-01)
|
D3390000 | 339-1, 2339-1 |
|
341 ASPHALT RUBBER MEMBRANE INTERLAYER EQUIPMENT-ROLLERS. (REV 4-3-00) (FA 8-29-00) (7-01)
|
D3410033 | 341, 2341 Items |
|
347 PORTLAND CEMENT CONCRETE-CLASS I (NONSTRUCTURAL). (REV 5-21-01) (FA 6-20-01) (1-02) SECTION 347 (Pages 346-349) is deleted and the following substituted: |
D3470000 | Jobs with Nonstructural Concrete |
|
400 CONCRETE STRUCTURES. (REV 6-20-00) (FA 7-25-00) (1-02)
|
D4000000 | Jobs with Concrete Structures |
|
415 REINFORCING STEEL. (REV 4-2-01) (FA 5-11-01) (1-02) SECTION 415 (Pages 423-429) is deleted and the following substituted: |
D4150000 | Jobs with Reinforcing Steel |
|
430 PIPE CULVERTS AND STORM SEWERS. (REV 2-15-01) (FA 4-11-01) (1-02) SECTION 430 (Pages 434-446) is deleted and the following substituted: |
D4300000 | 430; 2430 Items |
|
431 PIPE LINER. (REV 9-21-00) (FA 1-19-01) (7-01) SECTION 431 (Pages 446-448) is deleted and the following substituted: |
D4310000 | 431; 2431 Items |
|
440 UNDERDRAINS. (REV 2-16-00) (FA 3-30-00) (1-01) SECTION 440 (Pages 449-451) is deleted and the following substituted: |
D4400000 | 440; 2440 Items |
|
453 EPOXY JOINTING OF PRECAST SEGMENTS. (REV 12-11-00) (FA 2-5-01) (2-01)
|
D4530000 | Precast Structural Concrete Units except Box Culverts |
|
455 STRUCTURES FOUNDATIONS. (REV 7-25-00) (FA 7-26-00 (1-01)
|
D4550000 | Structure Foundations Jobs |
|
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS. (REV 4-3-01) (FA 4-11-00) (7-01)
SUBARTICLE 460-2.1 (Page 600) is deleted and the following substituted: |
D4600000 | Jobs with Structural Steel |
|
460 STRUCTURAL STEEL AND MISCELLANEOUS METALS - FABRICATOR QUALIFICATIONS.
(REV 9-18-00) (FA 12-13-00) (7-01)
SUBARTICLE 460-2.3 (Page 601) is deleted and the following substituted: |
D4600023 |
460-1, 2460-1 460-2, 2460-2 |
|
460 MARKING AND SHIPPING - GENERAL. (REV 6-16-00) (FA 7-6-00) (1-01)
|
D4600271 |
460 Items 2460 Items |
|
A460 MULTIROTATIONAL POT BEARINGS.
(REV 7-7-99) (FA 7-30-99) (7-00) PAGE 620. The following new Section is added after Section 460: |
DA460001 |
460-113, 2460-113 460-114, 2460-114 |
|
502 SHEAR CONNECTORS. (REV 4-3-01) (FA 4-27-01) (7-01) ARTICLE 502-1 (Page 627) is deleted and the following substituted: |
D5020000 | Jobs with Structural Steel |
|
521 CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS. (REV 7-27-00) (FA 8-1-00) (1-01) SECTION 521 (Pages 650-653) is deleted and the following substituted: |
D5210000 | 521; 2521 Items |
|
522 CONCRETE SIDEWALK-METHOD OF MEASUREMENT. (REV 5-24-00) (FA 9-26-00) (1-01) ARTICLE 522-9 (Page 654) is deleted and the following substituted: |
D5220009 | 522; 2522 Items |
|
524 CONCRETE DITCH AND SLOPE PAVEMENT - METHOD OF MEASUREMENT. (REV 6-23-00) (FA 9-7-00) (7-01)
|
D5240009 | 524; 2524 Items |
|
526 ARCHITECTURAL PAVERS. (REV 4-23-98) (FA 5-26-98) (1-01) Page 657. The following new Section is added after Section 525: |
D5260000 | 526-1; 2526-1 |
|
536 GUARDRAIL-CERTIFICATION. (REV 5-2-01) (FA 6-14-01) (7-02) ARTICLE 536-2 (Pages 666-668) is expanded by the following: |
D5360002 | 536; 2536 Items |
|
550 FENCING-CERTIFICATION. (REV 5-2-01) (FA 6-14-01) (1-02) ARTICLE 550-3 (Page 682) is expanded by the following: |
D5500003 | 550; 2550 Items |
|
563 ANTI-GRAFFITI COATING SYSTEM. (REV 8-15-00) (FA 9-7-00) (7-01) SECTION 563 (Pages 697-699) is deleted and the following substituted: |
D5630000 | 563; 2563 Items |
|
575 SODDING-WATERING. (REV 3-10-00) (FA 4-5-00) (1-01) SUBARTICLE 575-3.3 (Pages 703 and 704) is deleted and the following substituted: |
D5750033 | Sodding Jobs |
|
580 LANDSCAPING INSTALLATION-PLANTS. (REV 12-6-99) (FA 12-23-99) (7-00) SUBARTICLE 580-2.1.2 (Pages 707 and 708) is deleted and the following substituted: |
D5800002 | Landscaping Jobs |
|
611 ACCEPTANCE OF SIGNAL INSTALLATIONS. (REV 12-15-00) (FA 2-1-01) (7-01) ARTICLE 611-2 (Page 717) is expanded as follows: |
D6110002 | Jobs with Signal |
|
632 SIGNAL AND INTERCONNECT CABLE. (REV 7-25-00) (FA 8-3-00) (7-02) SECTION 632 (Pages 728-730) is deleted and the following substituted: |
D6320000 | 632; 2632 Items |
|
641 PRESTRESSED CONCRETE POLES. (REV 3-7-00) (FA 5-8-00) (1-01) SECTION 641 (Pages 739 and-740) is deleted and the following substituted: |
D6410000 | 641; 2641 Items |
|
649 STEEL STRAIN POLES, STEEL MAST ARM AND MONOTUBE ASSEMBLIES. (REV 10-16-00) (FA 12-18-00) (7-01) PAGE 740. The following new Section is added after Section 641. |
D6490000 | 649; 2649 Items |
|
650 VEHICULAR SIGNAL ASSEMBLIES-METHOD OF MEASUREMENT. (REV 10-3-00) (FA 1-10-01) (7-01) ARTICLE 650-4 (Page 742) is expanded as follows: |
D6500004 | 650-5; 2650-5 |
|
690 REMOVAL OF EXISTING TRAFFIC SIGNAL EQUIPMENT. (REV 5-3-01) (FA 5-15-01) (1-02) SECTION 690 (Pages 754-757) is deleted and the following substituted: |
D6900000 | 690; 2690 Items |
|
700 SIGN BACKGROUND. (REV 5-15-00) (FA 6-20-00) (1-01)
|
D7000002 | All Jobs |
|
702 INVERTED PROFILE, WET WEATHER TRAFFIC STRIPES. (REV 3-21-00) (FA 5-26-00) (7-01) PAGE 772. The following new Section is added after Section 701. |
D7020000 | 702; 2702 Items |
|
704 CERAMIC PAVEMENT MARKERS. (REV 12-17-93) (FA 8-4-98) (7-00) PAGE 772. The following new Section is added after Section 701. |
D7040000 | 704; 2704 Items |
|
705 HIGHWAY DELINEATORS (REV 5-5-00) (FA 6-16-00) (1-01)
|
D7050025 | 705; 2705 Items |
|
714 MOTORIST AID CALL BOX RELOCATION. (REV 11-30-00) (FA 2-2-01) (7-01) PAGE 791. The following new Section is added after Section 713: |
D7140000 | 714-1, 2714-1; 400-2, 2400-2 (requires plan details) |
|
715 HIGHWAY LIGHTING SYSTEM. (REV 2-9-01) (FA 3-7-01) (1-02) SECTION 715 (Pages 791-797) is deleted and the following substituted: |
D7150000 | Highway Lighting Projects |
|
916 SUPERPAVE PG ASPHALT
BINDER. (REV 8-3-00) (FA 12-11-00) (7-01) ARTICLE 916-1 (Pages 815-818) is deleted and the following substituted: |
D9160001 | Asphalt Jobss |
|
919 GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER. (REV 1-8-01) (FA 3-9-01) (1-02) ARTICLE 919-2 (Page 827). The second paragraph is deleted and the following substituted: |
D9190006 | Jobs with Ground Tire Rubber |
|
925 CURING MATERIALS FOR CONCRETE-CERTIFICATION. (REV 9-28-01) (FA 1-10-02) (7-02) SECTION 925 (Pages 836 and 837) is expanded by the following new Subarticles: |
D9250004 | Jobs with Concrete |
|
929 POZZOLANS AND SLAG. (REV 4-13-00) (FA 4-24-00) (1-01) SECTION 929 (Pages 845-847) is deleted and the following substituted: |
D9290000 | Jobs with Concrete |
|
931 METAL ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE
STRUCTURES-CERTIFICATION. (REV 11-27-00) (FA 3-20-01) (1-02) SUBARTICLE 931-2.1 (Pages 853 and 854) is expanded as follows: |
D9310002 | All Jobs |
|
932 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES. (REV 3-27-01) (FA 4-16-01) (1-02)
|
D9320000 | All Jobs |
|
937 ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS. (REV 9-18-00) (FA 12-14-00) (7-01) SECTION 937 (Pages 873-875) is deleted and the following substituted: |
D9370000 | All Job |
|
941 CONCRETE CULVERT PIPE (ROUND). (REV 12-19-00) (FA 2-2-01) (7-02)
|
D9410001 | 430; 2430 Items |
|
943 CORRUGATED STEEL PIPE AND PIPE ARCH (INCLUDING UNDERDRAIN). (REV 11-21-00) (FA 1-17-01) (7-01) ARTICLE 943-1 (Page 882) is deleted and the following substituted: |
D9430001 | 430; 2430 Items |
|
945 ADHESIVE BONDING MATERIAL SYSTEMS FOR STRUCTURAL APPLICATIONS. (REV 11-21-00) (FA 1-10-01) (7-01) ARTICLE 945-1 (Page 887) The first paragraph is deleted and the following substituted: |
D9450001 | 430; 2430 Items |
|
948 MISCELLANEOUS TYPE OF PIPE. (REV 11-21-00) (FA 1-19-01) (7-01) SUBARTICLE 948-1.7 (Page 892) is deleted and the following substituted: |
D9480001 | 430; 2430 Items |
|
948 PIPE LINER MATERIALS. (REV 9-21-00) (FA 1-17-01) (7-01) SECTION 948 (Pages 891-893) is expanded by the following: |
D9480004 | 431-70; 2431-70 |
|
948 MISCELLANEOUS TYPES OF PIPE. (REV 4-23-01) (FA 6-14-01) (1-02) SUBARTICLE 948-2.3 (Page 892) is deleted and the following substituted: |
D9480023 | 430; 2430 Items |
|
951 INSPECTION OF TIMBER PRODUCTS. (REV 11-13-01) (FA 1-3-02) (7-02) ARTICLE 951-1 (Pages 894) is deleted and the following substituted: |
D9510001 | All Jobs |
|
970 RAISED RETRO-REFLECTIVE PAVEMENT MARKERS - PERFORMANCE REQUIREMENTS. (REV 8-23-00) (FA 10-27-00) (1-01)
|
D9700003 | Jobs with Reflective Pavement Markers |
|
971 COATINGS AND TRAFFIC MARKING MATERIALS. (REV 5-4-00) (FA 5-26-00) (7-01) SECTION 971 (Pages 913-945) is expanded by the following: |
D9710022 | All Jobs |
|
982 COMMERCIAL FERTILIZER-CERTIFICATION. (REV 11-27-00) (FA 3-28-01) (1-02) SECTION 982 (Pages 951) is expanded as follows: |
D9820002 | All Jobs |
|
985 GEOTEXTILE FABRICS. (REV 10-20-99) (FA 12-21-99) (7-00) SECTION 985 (Pages 951 and 952) is deleted and the following substituted: |
D9850000 | All Jobs |
|
986 CALCIUM CHLORIDE FOR DUST CONTROL-CERTIFICATION. (REV 1-8-01) (FA 3-7-01) (1-02) SECTION 986 (Pages 952 and 953) is expanded by the following: |
D9860003 | All Jobs |
|
992 HIGHWAY LIGHTING MATERIALS-CERTIFICATION. (REV 12-27-00) (FA 3-28-01) (1-02) ARTICLE 992-4 (Page 955) is expanded by the following Subarticles: |
D9920041 | All Jobs |
|
992 POLE CABLE DISTRIBUTION SYSTEM-WALL MOUNTED LIGHTING. (REV 3-14-00) (FA 5-15-00) (1-01) SUBARTICLE 992-12 (Pages 957-960) is expanded by the following new Subarticle: |
D9920012 | Lighting Jobs |
|
993 TYPE C DELINEATORS. (REV 5-15-00) (FA 6-16-00) (1-01)
|
D9930021 | 705; 2705 Items |
|
993 REFLECTOR UNITS FOR GUARDRAIL - CERTIFICATION. (REV 3-30-01) (FA 4-11-01) (1-02)
|
D9930005 | All Jobs |
|
994 RETROREFLECTIVE AND NONREFLECTIVE SIGN SHEETING. (REV 7-6-00) (FA 7-25-00) (1-01) SECTION 994 (Pages 964-973) is deleted and the following substituted: |
D9940000 | All Jobs |
|
995 DEMOUNTABLE SIGN FACE MATERIALS-CERTIFICATION. (REV 11-27-00) (FA 3-7-01) (1-02) ARTICLE 995-3 (Page 976) is deleted and the following substituted: |
D9950003 | All Jobs |
|
996 PORCELAIN ENAMEL LAMINATED ALUMINUM SIGN PANELS-CERTIFICATION. (REV 1-8-01) (FA 3-28-01) (1-02) SECTION 996 (Pages 976-980) is expanded by the following: |
D9960006 | All Jobs |
| APPENDICES | DAPENDIC | All Jobs |
|
STANDARD OPERATING PROCEDURE FOR QUALITY CONTROL OF
SOIL-CEMENT CONSTRUCTION. |
DSOP270 | Section 270 |
|
STANDARD OPERATING PROCEDURE FOR QUALITY CONTROL OF
CONCRETE |
DSOP346 | Section 346 |
|
QUALITY CONTROL PLAN FOR FLY ASH SUPPLIERS. |
DFLY346 | Sections 346 or 347 |
|
SPECIAL
PROVISION FOR DISADVANTAGED BUSINESS ENTERPRISES |
DMBE0001 | All Jobs |
|
AFFIRMATIVE ACTION REQUIREMENTS. |
DAFFIRM | All Jobs |
|
REQUIRED
CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS |
DF1273 | Federal Aid Projects |
|
SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY
RESPONSIBILITIES APPLICABLE TO CONSTRUCTION AND MAINTENANCE CONTRACTS |
DEEORESP | Non-Federal Aid Projects |
|
STORM WATER POLLUTION PREVENTION PLAN |
(use with NPDES Specs when provided) ______ pages |
|
|
PERMIT (S) |
(use with D0070021) ______ pages |
|
| UTILITY SCHEDULE (S) |
(use with D0070118) ______ pages |
|