Skip Navigation  Go to Main Content
Florida Department Of Transportation
Rotating image which displays various FDOT modes of travel
Your browser is currently set to not allow scripting. This site is best viewed with scripting turned on.
Several essential aspects of this site will not function with scripting disabled.

November 7, 2011 -- The Florida Department of Transportation's websites will be unavailable due to data center consolidation and relocation activities, beginning Thursday, November 10, 2011, 6:00 PM (EST). Services should resume by Monday, November 14, 2011 6:00 AM. We apologize for any inconvenience.

 May is Motorcycle Safety Awareness Month. Click here to read the proclamation. 
Main Level Navigation



 


Office Level Navigation
Home
(Scroll down for full list.)
FDOT Facilities
Maps - FDOT Facilities (Opens in a new window)
FDOT, Specs and Estimates - Implemented Specifications

Specifications and Estimates Office Logo
Specifications and Estimates Office
Duane F. Brautigam, P.E.


 

Banner WorkBook Specification Book Basis of Estimates Spec's on the Web, This will open in a new window. This link will open in a new window and take you to the Long Range Estimates login screen - Authorized users only Qualified Products List Index This link will open in a new window and take you to the Web Gate login screen - Authorized users only Industry Review
How to Contact Specifications and Estimates
Have a Question? Frequently Asked Questions Staff Listing

WEB LINKS WITHIN IMPLEMENTED SPECIFICATIONS



Spec Book
Section Number
Topic Description
2
Proposal Requirements and Conditions
Examination of Contract Documents and Site of Work ARTICLE 2-4 Examination of Contract Documents and Site of Work. Direct all questions to the Department by posting them to the Department’s website at the following URL address: www2.dot.state.fl.us/construction/bidquestionmain.asp
6
Control of Materials
Qualified Products List (QPL) SUBARTICLE 6-1.3.1.1 Qualified Products List: Manufacturers seeking evaluation in accordance with Departmental procedures of an item must submit a Product Evaluation Application, available on the Department’s website http://www2.dot.state.fl.us/specificationsestimates/productevaluation/qpl/submittalprocess.aspx, with supporting documentation as defined and detailed by the applicable Specifications and Standards.
Approved Products List (APL) SUBARTICLE 6-1.3.1.2. Approved Products List: The approval process is described in detail on the State Traffic Operation website, http://www.dot.state.fl.us/trafficoperations/terl/apl2.htm.
7
Legal Requirements and Responsibilities to the Public
FHWA 1273 SUBARTICLE 7-1.1 General: The FHWA-1273 Electronic version, dated March 10, 1994 is posted on the Department’s website at the following URL address: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/df1273.pdf ./td>
Executive Order 11246 The Executive Order 11246 Electronic version, dated September 24, 1965 is posted on the Department’s website at the following URL address: http://www.dot.state.fl.us/specificationsoffice/federal/deo11246.pdf.
Endangered Wildlife Guidelines SUBARTICLE 7-1.4 Compliance with Federal Endangered Species Act and other Wildlife Regulations: These guidelines are posted at the following URL address: http://www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/endangeredwildlifeguidelines.pdf.
Insecticides and Herbicides SUBARTICLE 7-1.7 Insecticides and Herbicides: Use products found on the following website, http://www.flpesticide.us/, approved by the Florida Department of Agriculture for in the State of Florida.
Permits and Utility Work Schedules SUBARTICLE 7-2.1 General: All Permits procured by the Department are posted on the Department’s website at the following URL address: ftp.dot.state.fl.us/permitsandorutilityworkschedules/ .
DEP Permit SUBARTICLE 7-2.2 Work or Structures in Navigable Waters of the U.S., Waters of the U.S., and Waters of the State: The “State of Florida Department of Environmental Protection (DEP) Generic Permit for Stormwater Discharge from Large and Small Construction Activities” applies to this Contract. Obtain a copy of the permit through the Department’s website and comply with the requirements of the permit. The URL for obtaining a copy of the permit is www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/DEPPermit.pdf.
Operations Within Railroad Right-of-Way SUBARTICLE 7-11.5.2: Contractor's Responsibilities: Comply with CSXT Construction Submission Criteria and the Construction sections of the CSXT Pipeline and Wireline Design and Construction Standards found at the following url: http://www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/Files/CSXspecs.pdf
Permits and Utility Work Schedules SUBARTICLE 7-11.6.3 Utility Adjustments: The utility work which will be accomplished concurrently with the highway construction Contract will involve facilities owned by other agencies. Utility Schedules (Utility Relocation and/or Work Schedules) for these agencies are posted on the Department’s website at the following URL address: ftp.dot.state.fl.us/permitsandorutilityworkschedules/.
9
Measurement and Payment
Fuel Adjustments SUBARTICLE 9-2.1.1 Fuels: Price indexes will be determined by the Department and will be available on the Construction Office website before the 15th of each month, at the following URL: http://www.dot.state.fl.us/construction/fuel&Bit/Fuel&Bit.shtm .
Bituminous Material Adjustments SUBARTICLE 9-2.1.2 Bituminous Material: The API will be available on the State Construction Office website before the 15th of each month at the following URL: www.dot.state.fl.us/construction/fuel&Bit/Fuel&Bit.shtm.
104
Prevention, Control, and Abatement of Erosion and Water Pollution
State of Florida Erosion and Sediment Control Designer and Reviewer Manual (E&SC) SUBARTICLE 104-6.2 Incorporation of erosion and Sediment Control Features: An electronic version of the E&SC Manual can be found at the following URL: http://www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/FLErosionSedimentManual.pdf .
105
Contractor Quality Control General Requirements
Flexible Pipe SUBARTICLE 105-3.2 Compliance with the Materials Manual. Producers of Flexible Pipe shall meet the requirements of Section 6.1, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: http://www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section61.pdf .
Precast Concrete Pipe Producers of Precast Concrete Pipe shall meet the requirements of Section 6.2, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section62.pdf .
Precast Concrete Drainage Structures Producers of Precast Concrete Drainage Structures shall meet the requirements of Section 6.3, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section63.pdf.
Precast/Prestressed Concrete Products Producers of Precast/Prestressed Concrete Products shall meet the requirements of Sections 8.1 and 8.3 of the Department’s Materials Manual, which may be viewed at the following URLs: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section81.pdf. www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section83.pdf.
Precast/Prestressed Concrete Products using Self Consolidating Concrete Producers of Precast Prestressed Concrete Products using Self Consolidating Concrete shall meet the requirements of Section 8.4, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section84.pdf .
Incidental Precast/Prestressed Concrete Products Producers of Incidental Precast/Prestressed Concrete Products shall meet the requirements of Section 8.2, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section82.pdf .
Portland Cement Concrete Producers of Portland Cement Concrete shall meet the requirements of Section 9.2, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section92.pdf .
Structural Steel and Miscellaneous Metal Components Producers of Structural Steel and Miscellaneous Metal Components shall meet the requirements of Sections 11.1 and 11.2 of the Department’s Materials Manual, which may be viewed at the following URLs: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section111.pdf and www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section112.pdf .
Worksite Traffic Supervisor SUBARTICLE 105-8.3 Worksite Traffic Supervisor: Provide a Worksite Traffic Supervisor who is responsible for initiating, installing, and maintaining all traffic control devices as described in Section 102 and in the Contract Documents. Ensure that the Worksite Traffic Supervisor is certified in the advanced training category by a Department approved training Provider. Approved Providers will be posted on the Department’s website at the following URL address: www.dot.state.fl.us/rddesign/MOT/MOT.htm.
Signal Installation Inspector SUBARTICLE 105-8.10 Signal Installation Inspector: The Department’s approved inspection report forms are available at the following URL: www.dot.state.fl.us/trafficoperations/ .
288
Cement Treated Permeable Base
Control of Quality SUBARTICLE 288-3.1 General: Meet the provisions of this Section and Chapter 9.2 of the Materials Manual – Concrete Production Facilities Guidelines, which may be view at the following URL: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/files/section92.pdf .
334
Superpave Asphalt Concrete
Pavement Composition SUBARTICLE 334-2.3.4 Pavement Composition: When the Contract includes milling of the existing asphalt pavement, the Pavement Composition Data Sheet may be available on the Department’s website. The URL for obtaining this information, if available, is: www.dot.state.fl.us/statematerialsoffice/laboratory/asphalt/centrallaboratory/compositions/index.shtm .
337
Asphalt Concrete Friction Courses
Materials SUBARTICLE 337-2.1 General Requirements: Meet the requirements specified in Division III as modified herein. The Engineer will base continuing approval of material sources on field performance. Warm mix technologies (additives, foaming techniques, etc.) listed on the Department’s website may be used in the production of the mix. The URL for obtaining this information, if available, is: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/Files/WarmMixAsphalt.pdf .
338
Value Added Asphalt Pavement
Category 1 Pavemenent SUBARTICLE 338-5.2 Category 1 Pavement: (6) Raveling, Delamination, Pot holes, Slippage: As defined and determined by the Engineer in accordance with the examples displayed at the following URL: www2.dot.state.fl.us/specificationsestimates/pavement.aspx and (8) Bleeding: Bleeding to be determined as defined and determined by the Engineer in accordance with the examples displayed at the following URL: www2.dot.state.fl.us/specificationsestimates/pavement.aspx .
430
Pipe Culverts
Final Pipe Inspection SUBARTICLE 430-4.8 Final Pipe Inspection: Laser profiling and measurement technology must be certified by the company performing the work to be in compliance with the calibration criteria posted at: www.dot.state.fl.us/construction/contractorissues/laser.shtm . Reports may be submitted in electronic media if approved by the Engineer.
449
Precast Concrete Drainage Products
Rubber Gaskets Used SUBARTICLE 449-5.2 When Rubber Gaskets are Used: Ensure that the pipe joints have been tested at the plant hydrostatically and shown to meet the requirements of Section 6.2 of the Materials Manual, which is available at the following URL: www.dot.state.fl.us/specificationsoffice/Implemented/URLinSpecs/Files/section62.pdf .
Not valid after December 31, 2011
534
Sound Barriers
Approved Panels and Systems SUBARTICLE 534-4 Approved Proprietary Sound Barrier Panels and Systems. Manufacturers seeking evaluation of products for inclusion on the QPL must submit an application in accordance with Section 6, independently certified test reports, and written certification that the product meets the requirements of this Section, Design Standards, Index Nos. 5200 thru 5206 and the Sound Barrier Evaluation Criteria contained in the State Structures Design Office’s Structures Manual, which may be viewed at the following URL: www.dot.state.fl.us/structures/StructuresManual/CurrentRelease/QualifiedProductsList/QPLChapter2SoundBarriers.htm.
570
Performance Turf
Turf Establishment ARTICLE 570-4 Turf Establishment. Monitor turf areas and remove all competing vegetation, pest plants, and noxious weeds (as listed by the Florida Exotic Pest Plant Council, Category I "List of Invasive Species", Current Edition, www.fleppc.org).
649
Galvanized Steel Strain Poles, Mast Arms and Monotube Assemblies
Inspection Forms SUBARTICLE 649-4.3.2 Responsible Party Warranty: When the Contract Documents call for painted galvanized steel strain poles, mast arms or monotube assemblies, the Contractor shall designate a Responsible Party to accept responsibility. The Responsible party designated by the Contractor must execute and deliver to the Department a form, provided by the Department, prior to the first delivery to the jobsite of any painted strain poles, mast arms or monotube assemblies, stipulating that the Responsible Party accepts responsibility for ensuring the coating system adhesion and color retention requirements as specified in 975-7 are met for a period of five years after final acceptance in accordance with 5-11. The Responsible Party shall also bear the continued responsibility for performing all remedial work associated with repairs of any adhesion or color retention failure as defined in Section 975, as to which notice was provided to the Responsible Party within the five year warranty period. Failure to timely designate the Responsible Party will result in the Contractor being the Responsible Party unless otherwise agreed to in writing by the Department. The responsible Party shall be either the Contractor or the Fabricator. When the Responsible Party is the Fabricator, the Responsible Party shall be one of the Fabricators listed on the “Prequalified Fabricators of Painted Galvanized Steel Strain Poles, Mast Arms and Monotube Assemblies.” This list may be viewed on the Department’s website at the following URL: www.dot.state.fl.us/construction/ .
Not valid after December 31, 2011
781Intelligent Transportation Systems - Motorist Information Systems
Software Implementation for ITS SUBARTICLE 781-3.3 TMC Communication Specifications for all DMS: Ensure that the software implements all mandatory objects as defined in the FDOT-standard Global MIB in Appendix A, all mandatory objects as defined in the FDOT-standard DMS MIB in Appendix B, and all mandatory objects as defined in the FDOT-specific DMS MIB in Appendix C as published online at www.dot.state.fl.us/trafficoperations/APL/fdot_dms_info.shtm at the time of contract letting.
981
Turf Materials
Turf Establishment ARTICLE 981-1 General: All seed, sod and mulch shall be free of noxious weeds and exotic pest plants, plant parts or seed listed in the current Category I “List of Invasive Species” from the Florida Exotic Pest Plant Council (FLEPPC, www.fleppc.org).
ARTICLE 981-5 Source Requirements for Sod and Mulch: The Contractor shall comply with all current restrictions in regard to movement of sod and mulch material, as required by the Division of Plant Industry, Florida Department of Agriculture and Consumer Services (www.doacs.state.fl.us/pi/plantinsp/pi_reg_summary.html).
990
Temporary Traffic Control Devices Materials
Minimum Specifications for Traffic Control Devices SUBARTICLE 990-3.1.5 Other Requirements: Meet the following: (a) The portable device assembly shall be designed to function in dry, wet, hot or cold weather (ambient temperature ranges from -30 to 165ºF. Other environmental requirements shall be as specified in Section A-615 of the Minimum Specifications for Traffic Control Signal Devices, which can be located at the following URL: http://www.dot.state.fl.us/trafficoperations/Traf_Sys/terl/apl4.shtm , Sections A615-4 Temperature and Humidity, A615-5 Vibration, and A615-6 Shock.
 

Accessibility | Acronyms | Frequently Asked Questions | Governor's Office | Privacy Policy | Statement of Agency  

Email questions and comments to: 
Public Information Office for General Issues
Web Review Team for Website Issues
Copyright © 1996- Florida Department of Transportation

You might need Word Viewer or Adobe Reader to view file downloads

My Florida logo image  (Opens in New Window)
spacer image