Design Build Specifications - July - December 2010

Specifications and Estimates

Design-Build Boiler-Plate

July - December 2010



The Design-Build Boilerplate* is the Division I Master Document to be used in the Request for Proposal (RFP) for Design-Build projects.

 

 

NOTE: * Be sure to include the language of 7-13.2 General Liability, in the RFP or Boilerplate.

 


 

NOTE: The files below contain optional text which may be incorporated into the Design-Build Boilerplate for inclusion into the RFP, to create specific Contract language.

 

File Title Usage Notes
To Change Award and Execution Time
SP0030200 Award and Execution of Contract When necessary to change standard "Award and Execution"
Structures Over 1500 Feet in Length (over water)
SP0050901 Inspection Long bridge jobs (1500 feet or longer); modify to suit
Preference to State Residents
SP0072700 Preference to State Residents All Non-Federal Aid Projects
American Recovery and Reinvestment Act of 2009
SP0070111ES Laws to be Observed All American Recovery and Reinvestment Act of 2009 Jobs
SP0090503ES Partial Payments - Withholding Payment All American Recovery and Reinvestment Act of 2009 Jobs
SP0090801ES Acceptance and Final Payment - Acceptance and Final Payment Documents All American Recovery and Reinvestment Act of 2009 Jobs
Toll Facility (TurnPike Only)
SP0070201 Permits and Licenses (No free passes will be issued to the Contractor for use on the Toll Facility) Use when requested.
Use of Explosives
SP0070900 Use of Explosives When explosives are prohibited
Special Start Time
SP0080303A Prosecution of Work - Flexible Start Time When called for
SP0080303B Beginning Work (Number of days after Contract execution to issue NTP) Only when called for by the District Construction Engineer
SP0080303C Beginning Work (Specific Date) Only when called for by the District Construction Engineer
Partnering
SP0080306 Prosecution of Work - Partnering 999-16
Disputes Review Board
SP0080307RDRB Regional Disputes Review Board Jobs without Pay Item No. 999-20
Jobs with Lighting
SP0080409 Hazardous or Toxic Waste - Mercury - Containing Devices and Lamps Jobs with lighting
Damage Recovery
SP0081300 Damage Recovery Use when requested by proper authority. (Do not use with Lane Rental.)
Alternative Bidding
SP0081300A Prosecution and Progress All Jobs with Alternative Bidding. (Use with proper authority.)
Bonus
SP0081300B "Bonus" Payment and Waiver of Contractor Claims - Date Specific Bonus (Date Specific) (Use with proper authority)
SP0081300BCD "Bonus" Payment and Waiver of Contractor Claims - Calendar Day Bonus (Calendar Days) (Use with proper authority)
SP0081300MB "Bonus" Payment and Waiver of Contractor Claims - Milestone Milestone Bonus (Use with proper authority). Do not use with SP00813000B or SP0081300BCD.
Liquidated Savings
SP0081300LQS Liquidated Savings for Early Completion Liquated Savings. (Use with proper authority)
Incentive - Disincentive
SP0081300ID Incentive - Disincentive Incentive - Disincentive. (Use with proper authority)
SP0081300MID Incentive - Disincentive - Milestone Milestone Incentive - Disincentive. (Use with proper authority). Do not use with SP0081300ID)