EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Specifications and Estimates

Specifications and Estimates / Design Build

Design Build Specifications - July - December 2009

Specifications and Estimates

Design-Build Boiler-Plate

July - December 2009

 

Inclusion into the Request for Proposal (RFP)

 

The Design-Build Specifications* is the boiler-plate (Master Document) to be used in the Request for Proposal (RFP) for Design-Build projects.

 

NOTE: * Be sure to include the language of 7-13.2 General Liability, in the RFP or Boilerplate.

 


 

NOTE: The files below contain optional text which may be incorporated (copy and paste) into the Design-Build (Master Document) for inclusion into the RFP, to create specific Contract language.

 

File Title Usage Notes
When other Contractors are working in the area
SP000044 Intent of Contract When other Contractors are working in the vicinity
To Change Award and Execution Time
SP0030200 Award and Execution of Contract When necessary to change standard "Award and Execution"
Structures Over 1500 Feet in Length (over water)
SP0050901 Inspection Long bridge jobs (1500 feet or longer); modify to suit
American Recovery and Reinvestment Act of 2009
SP0070111ES Laws to be Observed All American Recovery and Reinvestment Act of 2009 Jobs
SP0090503ES Partial Payments - Withholding Payment All American Recovery and Reinvestment Act of 2009 Jobs
SP0090801ES Acceptance and Final Payment - Acceptance and Final Payment Documents All American Recovery and Reinvestment Act of 2009 Jobs
Toll Facility (TurnPike Only)
SP0070201 Permits and Licenses (No free passes will be issued to the Contractor for use onthe Toll Facility) Use when requested.
Building(s)
SP007201B Permits Procured by the Contractor Jobs with buildings
Use of Explosives
SP0070900 Use of Explosives When explosives are prohibited
Special Start Time
SP008030A Prosecution of Work - Flexible Start Time When called for
SP0080303B Beginning Work (Number of days after Contract execution to issue NTP) Only when called for by the District Construction Engineer
SP0080303C Beginning Work (Specific Date) Only when called for by the District Construction Engineer
Partnering
SP0080306 Prosecution of Work - Partnering 999-16
Disputes Review Board
SP0080307RDRB Regional Disputes Review Board Jobs without Pay Item No. 999-20
SP0080307SDRB Statewide Disputes Review Board Jobs with Asphalt Pavement, Concrete Pavement, Performance Turf or Landscape Installation
Jobs with Lighting
SP0080409 Hazardous or Toxic Waste - Mercury - Containing Devices and Lamps Jobs with lighting
Damage Recovery
SP0081300 Damage Recovery Use when requested by proper authority. (Do not use with Lane Rental.)
Alternative Bidding
SP0081300A Prosecution and Progress All Jobs with Alternative Bidding. (Use with proper authority.)
Bonus
Date Specific
SP0081300B "Bonus" Payment and Waiver of Contractor Claims Bonus (Date Specific) (Use with proper authority)
Calendar Days
SP0081300BCD "Bonus" Payment and Waiver of Contractor Claims Bonus (Calendar Days) (Use with proper authority)
Milestone
SP0081300MB "Bonus" Payment and Waiver of Contractor Claims Milestone Bonus (Use with proper authority). Do not use with SP00813000B or SP0081300BCD.
Liquidated Savings
SP0081300LQS Liquidated Savings for Early Completion Liquated Savings. (Use with proper authority)
Incentive - Disincentive
SP0081300ID Incentive - Disincentive Incentive - Disincentive. (Use with proper authority)
Milestone
SP0081300MID Incentive - Disincentive Milestone Incentive - Disincentive. (Use with proper authority). Do not use with SP0081300ID)