Specifications and Estimates
Implemented Modifications to the Standard Specifications
Trey Tillander,
State Specification Engineer
Phone: (850) 414-4140
Fax (850) 414-4199
| Current Workbooks of Implemented Modifications | A complete list of the Implemented Modifications to the Standard Specifications Workbooks |
| Mandatory Workbook Revisions | A list of the Mandatory Workbooks Revisions |
| Local Agency Program | The Implemented Specifications used by the Local Agencies |
|
Design-Build Division One Boiler Plate |
This is the Master Document which is to be incorporated into the Request For Proposal (RFP) for Design-Build projects. |
|
Web Links within the Implemented FDOT Specifications |
Web sites or documents specified within the Implemented FDOT Specifications. It is a brief description that is hyperlinked directly to the web site or document specified. |
| 2010 Specifications Book | A link to the 2010 Standard Specifications for Road and Bridge Construction in .pdf format. |
