EMERGENCY INFORMATION - To be displayed on a situational basis. Hidden otherwise. Due to weather conditions, the Florida Highway Patrol has closed the Sunshine Skyway Bridge. More…

Roadway Design

For details on file descriptions, please call (850) 414-4318  or e-mail  Benjamin Gerrell. These documents were developed in Microsoft WORD (.docx format) unless otherwise noted.  These forms are provided as samples only and the end user is solely responsible for each form's content and final format. All files are less than 1mb in size unless noted otherwise.
January 1, 2013 PPM Update

 

General

Suggestion Form PPM Suggestions and Comments Form

 

Chapter 10 - Work Zone Traffic Control

Ex. 10-A Changeable Message Sign Worksheet
Ex. 10-B Lane Closure Worksheet (Microsoft Excel Spreadsheet)
Ex. 10-C Traffic Pacing Worksheet (Microsoft Excel Spreadsheet)

 

Chapter 19 - Sealing Design Documents

Ex. 19-A 18 KIP Equivalent Single Axle Loads (ESAL)
Ex. 19-B Project Traffic

 

Chapter 20 - Plans Processing and Revisions

Ex. 20-A Transmittal of Plans, Specifications, and Estimates Package
Ex. 20-B Contract File Index
Ex. 20-C Revision Memo NewRoadway Design Bulletin RDB13-07
Ex. 20-D Status of Environmental Certification
Ex. 20-E Preliminary Engineering Certification

 

Chapter 22 - Lump Sum Project Guidelines

Ex.22-A Items of Work

 

Chapter 23 - Exceptions and Variations

Ex. 23-A Submittal/Approval Letter

 

Chapter 24 - Federal Aid Project Certification

Ex. 24-B Design Plans Phase Review
Ex. 24-C Special Provisions

 

Chapter 26 – Bridge Project Development

Ex. 26-A Bridge Development Report (BDR) Submittal Checklist
Ex. 26-B Independent Peer Review Certification Letter (90% Submittal)
Ex. 26-C Independent Peer Review Certification Letter (100% Submittal)

 

Chapter 28 - Shop and Erection Drawings

Ex. 28-D Record Shop Drawing Transmittal