| Index
No. |
Sheet
No. |
Filename |
Description |
Index
Date
|
| 0301 |
1
of 1 |
ei0301s01.pdf |
Turn
Lanes - Date:12-06-02 - Replaces Index No. 301. |
12/06/02
|
| 0304 |
1
of 5 |
ei0304s1of5.pdf
ei0304s1of5r1.pdf |
Public
Sidewalk Curb Ramps - Revised: 04-11-02 - Expanded to
include curb ramp detectable warning. See flag on drawing for
implementation information.
Revised: 06-06-02: Detectable surface coloring
requirement added. |
04/11/02
06/06/02
|
| 0304 |
1-5
of 5 |
ei0304.pdf |
PUBLIC
SIDEWALK CURB RAMPS - Revised 7-24-02 - Replaces Index No.
304.
NOTE: This file includes Sheet 5 of 5, revised:
01-30-03, to include corrected General Note number for Median
Crosswalk payment. |
07/24/02 |
| 0307 |
1-3
of 3 |
0307.pdf |
Miscellaneous
Utility Details - Date: 07-01-03 Replaces Index No.
307. This Index was revised to address longitudinal cuts;
clarify flowable fill requirements; to provide conflict
structure details being deleted from Index No. 201 by Special
Provision; and, to provide new details for patching for ring
and cover adjustments . This Interim should be included in all
plans involving utility cuts beginning with the January 2004
letting. |
07/01/03 |
| 0310 |
1-2
of 2 |
ei0310.pdf |
CONCRETE
SIDEWALK - Revised 7-24-02 - Replaces Index No. 310. |
07/24/02 |
| 0400 |
1
of 1
|
ei0400s1of1.pdf
|
Guardrail
- End Anchorage Assembly type REGENT-C Date: 05-29-03 -
This sheet is a supplement to Index No. 400. This end anchorage
system can be used when specifically called for in the plans
or at the contractor's option whenever the plans call for the
flared end anchorage option. This Interim should be included
in all plans to the extent practical without adverse impact to
production schedules and budgets beginning immediately.
|
05/29/03
|
| 0400 |
1-2
of 2
|
ei0400s1to2of2
|
Date:
01-28-02 - Sheet Nos. 1-2 of 2 is a supplement to Index No. 0400, Sheet 13 of 32.
No longer available as of 12/31/02. See thrie-beam
transition details for bridge traffic railing barrier
retrofits, Sheets 1-25 of 25, dated 12-31-02 below.
|
01/28/02
|
| 0400 |
1-25
of 25
|
ei0400s1to8of25
ei0400s9to17of25
ei0400s18to25of25
|
Guardrail
- Date: 12-31-02 - Sheet Nos. 1-25 of 25 are a supplement
to Index No. 400, Sheet 13 of 32, Detail E. These sheets are
thrie-beam transition details for bridge traffic railing
barrier retrofits.
The file for sheets 1-8 of 25 includes sheet 1 of 25, dated
01-22-03 and must be used to replace versions dated 01-10-03
and 12-31-02. Sheet 1 of 25, dated 01-22-03 includes the post
bolt spacing revision and includes Design Note No. 2 revision
dated 01-10-03. Sheet 1 of 25 is the only sheet revised since
12-31-02. |
12/31/02
01/22/03
|
| 0400 |
19
of 32 |
ei0400s19of32.pdf |
Guardrail
- Date: 06-30-03 - Replaces Index No. 400, Sheet 19 of 32.
This sheet was revised to include details for steel back-up plates
for special end shoes and terminal connectors to concrete
bridge traffic railing barriers. This sheet shall be included
in all plans calling for guardrail connecting to concrete
bridge traffic railing barrier (Index No. 400 Detail J)
beginning with the January 2004 letting, and on all projects
prior to the January 2004 letting to the extent practical
without adverse impact to production schedules and
budgets. |
06/30/03 |
| 0400 |
30
of 32 |
ei0400s30of32.pdf |
Guardrail
- Revised:01-31-02 - Post spacing modified. |
01/31/02 |
| 412 |
1-5
of 5 |
412.pdf
412r1.pdf
|
Portable
Temporary Low Profile Barrier For Roadside Safety - Date: 07-18-03 - This
barrier is applicable for design speeds of 45 mph or less
where a low profile is desired to maintain sight distance at
intersections and driveways. This Interim may be used
beginning immediately. Please note that availability of the
device will be limited initially, since the precast industry
will need time for mobilizing and tooling up to begin
fabrication. This should be considered in establishing project
schedules when calling for this device.
Revised: 09-29-03 - Sheet 1 of 5 revised to show drain
slot. |
07/18/03
09/29/03
|
| 413 |
1
of 1 |
413.pdf |
Proprietary
Temporary
Concrete Barrier - Date: 07-01-03 - New Index, duplicating
and replacing Interim Index No. 0415 (Sheet 1 of 1) dated
11-04-02. Use of the J-J Hook units shall be in accordance
with the requirements of Interim Index No. 0415, dated
07-01-03. |
07/01/03 |
| 0415 |
1
of 1 |
ei0415.pdf |
Precast
Concrete Temporary Barrier Wall - Date: 11-04-02. This
standard is produced only for the purposes of field
identification of the proprietary J-J Hook temporary concrete
barrier wall units and to permit their immediate use on
Florida highways in accordance with Index No. 415 and the
plans. No longer available as of 07-01-03. See interim
Index No. 413. |
11/04/02 |
| 0415 |
1-10
of 10 |
0415.pdf |
Temporary
Concrete Barrier - Date: 07-01-03 - Replaces Index No.
415. This Interim Index shall be included in all plans calling
for temporary barrier wall beginning with the January 2004
letting, and on all projects prior to the January 2004 letting
where the plans call for Type K barrier wall. |
07/01/03 |
| 0416 |
1
of 1 |
ei0416s1of1.pdf |
Temporary
Water Filled Barriers - Dated: 3-13-03 - This sheet is an
addition to Index No. 416. |
03/13/03 |
| 0439 |
1-6
of 6 |
ei0439.pdf |
Construction
Zone GREAT - This standard drawing is a supplement to the
2002 Design Standards. The GREATcz may be used in
work zones with speeds of 45 mph or less, and is to be
included as a redirective option under Index No. 415.
The GREATcz can be used on projects let to contract prior to
June 30, 2004 for the life of the project or until the unit
reaches the end of its service life, whichever comes first. |
10/12/01 |
441
441 |
1
of 1
1-8 of 8
|
ei441.pdf
ei441r1.pdf
|
TAU-II
- Date 03-18-02 - New index.
TAU-II
- Date 11-14-02 - Replaces Index No. 441 dated 03-18-02. |
03/18/02
11/14/02
|
| 0501 |
1-8
of 8 |
0501.pdf |
Geosynthetic
Reinforced Soils - Date: 07-01-03 - This Interim Index
replaces Index No. 501 and includes revised general notes,
revised application usages, additional geogrids and updated
design properties. This Interim Index should be included in
all plans calling for Geosyntheic reinforced soils to the
extent practical without adverse impact to production
schedules and budgets beginning immediately. |
07/01/03 |
| 0505 |
1-3
of 3 |
ei0505.pdf |
Embankment
Utilization - Revised 11-14-01 - Double asterisk (**) footnote
revised. Index required in plans let to contract beginning
January 2003. Use of the index prior to the letting beginning
January 2003 will be at the Districts discretion. For projects
that do not involve rigid pavement construction, only sheet 1
of 3 needs to be included in the plans. No longer available
as of 07-01-03.
|
11/14/01 |
| 0505 |
1-3
of 3 |
0505.pdf |
Embankment
Utilization - Date: 07-01-03 - This Interim Index
replaces Index No. 0505 dated 11-14-01 and Index No. 505. This
Index was revised to provide instructions to locate future
widening control lines in plans; to provide guidance on
restricting the use of plastic and high plastic soils in
drainage swales; and, to indicate that Special Select Soil
Option for rigid pavement may only be used when approved in
writing by the District Materials Engineer. These revisions
should be implemented in design to the maximum extent
practical without adverse impact to production schedules and
budgets beginning immediately. |
07/01/03 |
| 527 |
1-3
of 3 |
ei527.pdf |
Directional
Median Opening For - Date: 01-07-03 - The purpose of this
index is to provide the designer a reference for developing
directional median openings. This index is not intended for
inclusion in the contract plans.
|
01/07/03 |
| 528 |
1
of 1 |
ei528.pdf |
Median
Barrier Opening For Emergency Access - Date: 01-10-03 -
The purpose of this index is to provide the designer a
reference for developing emergency vehicle access through
median barriers on limited access facilities. This index is
not intended for inclusion in the contract plans.
|
01/10/03 |
| 0546 |
1-6
of 6 |
ei546.pdf |
Sight
Distance At Intersections: Revised: 04-28-03 - Replaces Index
No. 546. Index
No. 546 incorporates new Intersection Sight Distance (ISD)
criteria based on the 2001 AASHTO Greenbook.
This new ISD criteria will be included in the 2004
Design Standards booklet, which will be implemented beginning
with the July 2004 letting.
Until that time, use of Interim Index No. 0546 may be
used at the District’s discretion.
If used to establish ISD requirements on a project,
this interim typically does not need to be inserted into
contract plans; however, this interim may be inserted into
contract plans when the user deems its inclusion necessary.
|
04/28/03 |
| 0600 |
1
of 1 |
ei600.pdf |
General
Information For Traffic Control Through Work Zones –
Revised: 04-28-03 – Interim
Index for placement of business entrance signs and
channelizing devices at business entrances.
This index will be included in the 2004 Design
Standards booklet, which will be implemented beginning with
the July 2004 letting. Until
that time, Districts should include this Interim on all
applicable projects to the extent practical without impact to
production schedules or budgets.
|
04/28/03 |
| 700 |
1-2
of 2 |
ei700.pdf |
Roadside
Offsets - Date: 11-22-02 - New index for immediate use.
This interim drawing is intended to aid users in determining
the standard offsets to typical roadside objects or features.
It is consistent with existing horizontal clearance criteria
and typically does not need to be inserted into contract
plans; however, this interim may be inserted into contract
plans when the user deems its inclusion necessary.
|
11/22/02 |
| 05000 |
1
of 1 |
ei05000.pdf |
Retaining
Wall System General Notes - Date: 06-30-03
- Replaces Index No. 5000. Increased depth of ground cover on
concrete leveling pad. Deleted payment note.
|
06/30/03 |
| 05115 |
1-4
of 4 |
ei05115.pdf |
Retaining
Wall System The Reinforced Earth Company Terratrel Wire Wall
– Revised: 04-28-03 –
Modification of strip type.
|
04/28/03 |
| 017740 |
1-2
of 2 |
ei017740.pdf |
Instructions
and Examples for Designers and Fabricators of Standard Mast
Arm Assemblies -
Revised
10-12-01 - Replaces Index 17740. Sheet 2 of 2
- Vertical Clearances revised
|
10/12/01 |
| 17741 |
1-2
of 2 |
ei17741.pdf |
INSTRUCTIONS
AND EXAMPLES FOR DESIGNERS AND FABRICATORS OF STANDARD MAST
ARM "B & C" ASSEMBLIES-
Date: 7-17-02 - New Index.
NOTE:
Either group Index Nos. 17740, 17742 and 17744 or group
Interim Index Nos. 17741, 17743, and 17745 are optional groups
to be included in the plans for projects let to contract
January 2003 through June 2003. For projects let to contract
July 2003 through June 2004 only group Interim Index Nos.
17741, 17743 and 17745 will be applicable; and, group Index
Nos. 17740, 17742 and 17744 will be deleted from the Design
Standards on June 30, 2003.
|
07/17/02 |
| 17743 |
1-2
of 2 |
ei17743.pdf |
COMPONENT
DATA FOR STANDARD MAST ARM "B & C" ASSEMBLIES -
Date: 7-17-02 - New Index. See note on Interim Index No.
17741.
|
07/17/02 |
| 17745 |
1-5
of 5 |
ei17745.pdf |
MAST
ARM ASSEMBLIES - Date: 7-17-02 - New Index. See note on
Interim Index No. 17741.
|
07/17/02 |
| 017900 |
3
of 9 |
ei017900s3of9.pdf |
Traffic
Monitoring Site - Revised: 12-27-01 - Backplane circuit
modified.
|
12/27/01 |
| 017900 |
5
of 9 |
ei017900s5of9.pdf |
Traffic
Monitoring Site - Revised: 12-27-01 -
'Speed/Classification Loop Assembly With Axle Sensors
Placement Detail' modified.
|
12/27/01 |