Public Information Office
U.S. 90
Bridge replacement over White River and Bass Hole Cove
Project start date: July 2012
Estimated completion: summer 2015
Contractor: Scott Bridge Company
U.S. 90
From east of County Road 89 ( Ward Basin Road 0 to east of State Road 87)
Project start date: February 2012
Estimated completion: fall 2012
Contractor: Roads, Inc. of NWF
State Road 89
From County Road 178 to Jay City Limits
Project start date: May 2012
Estimated completion: winter 2013
Contractor: APAC Mid-South, Inc.
State Road 87
From north of Five Forks Road to Eglin AFB
Estimated completion: spring 2013
Contractor: Anderson Columbia Co, Inc.
State Road 281(Avalon Boulevard) from I-10 to a point south of the Moors Lodge
Reconstructing the roadway from two to four lanes Also included in the contract will be drainage improvements, sidewalk construction, a new bridge built over Mulatto Bayou, minor side road improvements, installation of high mast lighting at I-10, new signs and pavements markings.
Project start date: March 2011
Estimated completion: winter 2013
Contractor: APAC Mid-South, Inc.
State Road 281(Avalon Boulevard) - from south of Moors Lodge to north of the CSX R/R
Reconstructing the roadway from two to four lanes, drainage improvements, sidewalk construction, a new bridge built over the CSX railroad, minor side road improvements, and new signs and pavements markings within the project limits.
Project start date: October 2010
Estimated completion: fall 2013
Contractor: Roads of NW FL, Inc.
State Road 281 (Avalon Boulevard) - from south of Admiral Road to State Road (S.R.) 10 (U.S. 90)
Improvements for segment five include: Reconstruction of S.R. 281 from a two lane rural roadway to a four-lane urban roadway. Additional improvements will include construction of storm drain improvements, a storm water pond, sidewalks, mast arm signal systems at Avalon Boulevard and Mulat/Commerce Road, emergency signal at S.R. 281 and Carroll Road, and S.R. 281 and S.R. 10 (U.S. 90). The improvements will also include signing and pavement markings and minor side road improvements.
Project start date: January 2010
Estimated completion: winter 2013
Contractor: Panhandle Grading & Paving, Inc.
State Road 281 (Avalon Boulevard) - from a point north of CSX R/R Bridge a point south of Commerce Road
Improvements under this American Recovery and Reinvestment Act (ARRA) project consist of reconstruction and widening the existing two-lane urban/rural roadway to a four-lane urban roadway including: construction of storm drain improvements, a storm water retention pond, sidewalks, a mast arm signal system at Avalon Boulevard and Cyanamid Road, signing and pavement markings, construction of a frontage road on the east side of Avalon Boulevard running from just south of Cactus Drive to just north of Admirals Drive as well as minor side road improvements.
Project start date: August 2009
Estimated completion: winter 2013
Contractor: Panhandle Grading & Paving, Inc.