Scope of Services

A Scope of Services is a contractual agreement between the Department and the chosen professional firm that requires input from many disciplines and coordination with several offices within the Department. The Department has developed a Standard Scope of Services for procuring PD&E services and Design services and guidelines for negotiating staff hours. These documents are to be used on each project and modified only with project specific information.

 

Standard Scope of Services and Staff Hour Estimation Guidelines and Forms


Project Development and Environmental (PD&E)


Roadway & Bridge Structural Design


  • 2013 Standard Scope Summary of Changes - This file contains a summary of the changes in the 2013 Scope of Services documents. Right click the link, and save file to your location.
  • Design Standard Scope of Services - (Updated October 2013) This Word document should be completely filled out for the project. (Right click on link and save file.) The scope file is the complete Standard Scope which includes all design activities and should be used on every design Project. The document has areas for project specific information, which are indicated by bold-italics text with yellow highlight. Please remove the highlight (leaving the text formatted as bold-italics) when the information is inserted. All changes and/or additions to the Standard Scope shall be made in bold-italics to help draw attention to the users of project specific changes.
  • Design Staff Hour Estimation (SHE) Guidelines - (Updated October 2013) This is an Excel file containing over 30 worksheets. (Right click on file and save file.) This document provides detailed information, breaking down the activities and tasks that can appear in a scope document, along with recommended staff hour ranges to provide a detailed effort of the design work.
  • Design Staff Hour Estimation Forms - (Updated October 2013) This is an Excel file containing over 30 worksheets with formulas. (Right click on link and save file.) These forms are used to record the estimated hours for each activity and task listed in the project specific Scope of Services. These forms are used to estimate staff hours, which are used in the negotiation process.
  • Scope of Services Macro - This is a .zip file that contains all the MS Word documents, workbook, macro and instructions to assemble a Standard Scope of Services for Design services. To download the file, right click the hyperlink and select "Save Target As" and save it to your computer. Complete instructions for the use of this macro and files can be found in the file named _ReadMe-MacroInstructions.docx.

Links to Scope Help and Other Offices

 

For further information please contact:
Mary Jane Hayden, P.E., PMP
Project Manager
FDOT Production Support Office 850-414-4783