July 2013 Workbook


Implemented Modifications to the 2013 Standard Specifications

July 2013 Workbook

for Lettings Effective July - December 2013


Special Provisions - Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.

 

Supplemental Specifications - Additions or revisions to the Standard Specifications.

 

History of Revisions - To review the History of revisions for this Workbook.

 

Mandatory Revisions - Critical modifications implemented for the Workbook.
     Mandatory Revision #3 - To review the implementation letter.
     Mandatory Revision #2 - To review the implementation letter.
     REISSUED Mandatory Revision #1 - To review the implementation letter.
     Mandatory Revision #1 - To review the implementation letter.

 

Workbook Document - Final - To review the changes to the Workbook.
Workbook Document - Draft - To review the Workbook.


Note: These files are in Adobe Acrobat (PDF) format.

File size ranges from 9 kb to 279 kb.

SPECIAL PROVISIONSSP0000001All Jobs
EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK.
(REV 7-5-12) (7-26-12) (1-13)

Insert Information Required.
Change(s) to: 2-4.
SP0020400All Jobs, (add a phone number or e-mail address)
PREPARATION OF PROPOSALS.
(REV 6-22-04) (FA 7-13-04) (1-05)

Change(s) to: 2-5.1.
SP0020501ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB,SP0081300AB and SP0080701AB
PREPARATION OF PROPOSALS.
(REV 2-21-05) (FA 3-31-05) (1-06)

Insert Information Required.
Change(s) to: 2-5.1.
SP0020501LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LR and SP0081300LRDR
CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 2-15-07) (7-07)

Change(s) to: 3-1.
SP0030001Use at the direction of the District Construction in accordance with the Work Program Instructions.
Notify Contracts Office on Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT.
(REV 11-5-97) (FA 1-20-98) (7-00)

Insert Information Required
Change(s) to: 3-1.
SP0030100ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB,SP0080701AB and SP0081300AB
BUDGETARY CONSTRAINTS.
(REV 9-26-06) (FA 10-6-06) (1-07)

Insert Information Required
Change(s) to: 3-1.
SP0030100BCUse at the direction of the District Construction in accordance with the Work Program Instructions.
Notify the Contracts Administration Office on the Transmittal Memo.
AWARD AND EXECUTION OF CONTRACT.
(REV 12-21-12) (1-10-13) (7-13)

Change(s) to: 3-1, 3-2.2, 3-5.1.
SP0030100DCDistrict Let Construction Contracts less than $250,000 and
all Maintenance Contracts, excluding Lump Sum
AWARD AND EXECUTION OF CONTRACT.
(REV 4-11-97) (FA 5-7-97) (7-00)

Change(s) to: 3-1.
SP0030100LRLane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR
AWARD AND EXECUTION OF CONTRACT.
(REV 8-1-00) (1-01)

Change(s) to: 3-1.
SP0030100LSLump Sum Projects
AWARD AND EXECUTION OF CONTRACT.
(REV 7-26-01) (7-10)

Insert Information Required
Change(s) to: 3-2, 3-6, 3-7.
SP0030200When necessary to change standard “Award and Execution”
Contracts Office must approve.
AWARD OF CONTRACTS - A+B BIDDING
(REV 8-22-96) (FA 9-3-96) (1-10)

Insert Information Required
Change(s) to: 3-2.
SP0030203ABA+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB,SP0080701AB and SP0081300AB
AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS.
(REV 7-1-13) (7-13)
Change(s) to: 3-9.
SP0030900All Jobs (Mandatory #3)
SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (1-10)

Insert Information Required.
Change(s) to: 4-1.
SP0040100All Jobs, excluding Lump Sum.
Do not use with SP0040100SLPQ.
SCOPE OF THE WORK.
(REV 8-24-10) (FA 10-8-10) (7-11)

Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100LSAll Lump Sum Projects.
Do not use with SP0040100SLLS.
SCOPE OF THE WORK - INTENT AND SCOPE.
(REV 8-24-10) FA 10-8-10) (7-11)

Insert Information Required.
Change(s) to: 4-14-3.1, 4-3.4, 4-3.9.4.
SP0040100SLLSAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0040100LS.
SCOPE OF THE WORK - INTENT AND SCOPE.
(REV 9-16-09) (FA 11-9-09) (7-10)

Insert Information Required.
Change(s) to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100SLPQAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0040100.
UNFORESEEABLE WORK.
(REV 9-28-98) (1-10)

Change(s) to: 4-4.
SP0040400999-25
CONTROL OF THE WORK.
(REV 3-15-02) (1-13)

Change(s) to: 5-1.1, 5-2, 5-7.6.
SP0050501LSLump Sum Projects
INSPECTION.
(REV 2-10-94) (1-13)

Insert Information Required.
Change(s) to: 5-9.1
SP0050901Long bridge jobs (1500 feet or longer); modify to suit
CONTROL OF MATERIALS.
(REV 8-17-09) (FA 8-24-09) (1-10)

Change(s) to: 6-1.
SP0060100LSLump Sum Projects
REQUIREMENTS FOR FEDERAL JOBS - COMPLIANCE WITH FHWA 1273.
(REV 7-16-12) (8-2-12) (1-13)
Change(s) to: 7-1.1.
SP0070101All Federal Aid Jobs
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSECTICIDES AND HERBICIDES.
(REV 6-17-13) (9-13)
Change(s) to: 7-1.7.
SP0070107All Jobs (Mandatory #2)
PERMITS PROCURED BY THE DEPARTMENT.
(REV 8-7-01) (FA 4-14-05) (1-10)

Change(s) to: 7-2.1.
SP0070201AJobs with permit(s) procured by DOT
DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE.
(REV 7-16-09) (FA 7-30-09) (1-10)

Change(s) to: 7-2.2.
SP0070202When DEP Generic Permit is required
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC.
(REV 8-22-12) (1-13)

Insert Information Required.
Change(s) to: 7-7.1, 7-13.2, 7-13.3.
SP0070701DCDistrict Let Contracts less than $250,000 and all Maintenance Contracts.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY.
(REV 11-5-10) (FA 11-9-10) (7-11)

Change(s) to: 7-11.5.
SP0071105Projects Involving CSX Transportation.
UTILITY WORK.
(REV 2-10-94) (1-10)

Change(s) to: 7-11.6.3.
SP0071163AWhen there are no utility work schedules
UTILITY SCHEDULES.
(REV 8-27-01) (FA 4-14-05) (1-10)

Change(s) to: 7-11.6.3.
SP0071163BWhen there are utility work schedules
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.

(REV 12-21-09) (FA 12-28-09) (7-10) Insert Information Required.
Change(s) to: 7-16.
SP0071600All Federal Aid Jobs
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-10)

Change(s) to: Section 7-26.
SP0072600Non-Federal Aid Projects
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 6-15-10) (9-10)

Change(s) to: Section 7.
SP0072700Non-Federal Aid Projects - Construction Projects Only
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (8-11)

Change(s) to: Section 7.
SP0072800All Jobs
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 6-17-11) (7-11)

Change(s) to: Section 7.
SP0072900All Jobs
SUBMISSION OF WORKING SCHEDULE.
(REV 1-11-11) (FA 5-12-11) (1-12)

Change(s) to: 8-3.2.
SP0080302AUse only when CPM is authorized by District Construction Engineer. Do not use with SP0080302DC.
PROSECUTION AND PROGRESS.
(REV 6-18-12) (1-13)

Change(s) to: 8-3.2, 8-8, 8-9.1.
SP0080302DCDistrict Let Construction Contracts (including Lump Sum) less than $250,000, and all Maintenance Contracts.
Do not use with SP0080302A.
PROSECUTION OF WORK - FLEXIBLE START TIME.
(REV 2-15-10) (FA 2-17-10) (7-10)

Insert Information Required
Change(s) to: 8-3.3.
SP0080303AWhen called for by the District Construction Engineer.
*Contracts Office must be notified.
BEGINNING WORK.
(REV 7-10-95) (1-10)

Insert Information Required
Change(s) to: 8-3.3.
SP0080303BWhen called for by the District Construction Engineer. Use with the approval of the Chief Engineer.
BEGINNING WORK.
(REV 10-22-98) (11-5-98) (1-10)

Insert Information Required.
Change(s) to: 8-3.3.
SP0080303CWhen called for by the District Construction Engineer. Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
PROSECUTION OF WORK - PARTNERING.
(REV 5-5-12) (FA 5-21-12) (1-13)

Insert Information Required.
Change(s) to: 8-3.3.
SP0080306999-16*
*Contracts Office must be notified
PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-11)

Change(s) to: 8-3.
SP0080307DRB999-20 Items
Contracts Office must be notified
PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-11)

Change(s) to: 8-3.
SP0080307RDRBJobs without 999-20 Items
PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-11)

Change(s) to: 8-3.
SP0080308SDRB334, 337, 350, 570, 580 or 649 Items.
PROSECUTION AND PROGRESS.
(REV 8-1-00) (1-10)

Change(s) to: 8-4.1, 8-7.3.1.
SP0080401LSLump Sum Projects
LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (1-10)

Change(s) to: 8-4.8.
SP0080408Jobs on Limited Access Highways
CONTAMINATED MATERIAL - MERCURY-CONTAINING DEVICES AND LAMPS.
(REV 11-6-95) (FA 12-27-95) (7-11)

Insert Information Required.
Change(s) to: 8-4.9.
SP0080409Jobs with Lighting*
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 1-19-99) (1-10)

Insert Information Required.
Change(s) to: 8-7.1.
SP0080701AUse with approval of the District Construction Engineer.
COMPUTATION OF CONTRACT TIME.
(REV 7-24-96) (FA 9-3-96) (1-10)

Change(s) to: 8-7.1.
SP0080701ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB,SP0030203AB and SP0081300AB
COMPUTATION OF CONTRACT TIME.
(REV 2-14-94) (1-10)

Insert Information Required.
Change(s) to: 8-7.1.
SP0080701BUse with the approval of the District Construction Engineer.
COMPUTATION OF CONTRACT TIME.
(REV 12-22-98) (FA 2-1-99) (1-10)

Change(s) to: 8-7.1.
SP0080701CUse when requested by the District Construction Engineer.
DAMAGE RECOVERY.
(REV 2-4-04) (1-10)

Insert Information Required.
Change(s) to: Section 8.
SP0081300Use when requested by the District Construction Engineer. (Do not use with Lane Rental)
PROSECUTION AND PROGRESS.
(REV 7-28-97) (1-10)

Change(s) to: Section 8.
SP0081300AAll Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)

Insert Information Required.
Change(s) to: 8-13.
SP0081300ABA+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB and SP0080701AB
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300ABBA+B Jobs with Bonus Use with the approval of the District Construction Engineer.
8-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300BBonus (Date Specific) Use with the approval of the District Construction Engineer.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300BCDBonus (Calendar Days) Use with the approval of the District Construction Engineer.
8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)

Insert Information Required.
Change(s) to: 8-13.
SP0081300IDIncentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert Information Required.
Change(s) to: 8-13.
SP0081300IDLRIncentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR
8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LQSLiquidated Savings. Use with the approval of the District Construction Engineer.
8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LRDR.
8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)

Insert Information Required.
Change(s) to: 8-13.
SP0081300LRDRLane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR and SP0081300LR.
8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)

Insert Information Required.
Change(s) to: 8-13.
SP0081300MBMilestone Bonus Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD
8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Change(s) to: 8-13.
SP0081300MIDMilestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID
MEASUREMENT AND PAYMENT.
(REV 12-14-11) (FA 1-5-12) (7-12)

Change(s) to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11.
SP0090103LSLump Sum Projects. Do not use with SP0090103SLLS.
MEASUREMENT AND PAYMENT.
(REV 2-7-13) (7-13)

Change(s) to: 9-1.3, 9-2, 9-3, 9-5.1, 9-8.1, 9-9.
SP0090103SLLSAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Lump Sum. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0090103LS.
MEASUREMENT AND PAYMENT.
(REV 2-7-13) (7-13)

Change(s) to: 9-1.3.2, 9-2, 9-3.2.3, 9-5.1, 9-8.1, 9-9, 9-11.
SP0090103SLPQAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline Plan Quantity. For Bridge repair/rehab projects, contact the DCE prior to use. Do not use with SP0090501DC.
MEASUREMENT AND PAYMENT.
(REV 10-29-08) (FA 1-16-09) (1-10)

Change(s) to: 9-5.1, 9-5.4, 9-9.
SP0090501DCDistrict Let Contracts. Excluding Lump Sum Projects. Do not use with SP0090103SLPQ.
MAINTENANCE OF TRAFFIC.
(REV 9-4-12) (FA 9-6-12) (1-13)

Change(s) to: 102-13.12.
SP1021312102-89-17 Items
ENGINEER'S FIELD OFFICE.
(REV 1-4-11) (FA 2-17-11) (1-12)

Change(s) to: 109.
SP1090000109-71 Items
REMOVAL OF EXISTING STRUCTURES - STRUCTURES TO BE REMOVED.
(REV 9-10-07) (FA 2-15-08) (1-10)

Insert Information Required.
Change(s) to: 110-6.1.
SP1100601Use with approval of the District Construction Engineer and signed Agreement from the Local Agency receiving the material.
REMOVAL OF EXISTING STRUCTURES.
(REV 1-29-13) (FA 2-15-13) (7-13)

Change(s) to: 110-6.6.
SP1100606Use when areas of Asbestos Abatement are identified in the Plans
MATERIAL FOR REEF ESTABLISHMENT.
(REV 7-10-95) (FA 6-21-99) (1-10)

Change(s) to: 110-11.2, 110-12.7.
SP1101102110-84
EXCAVATION - INDENTIFIED AREAS OF CONTAMINATION.
(REV 1-29-13) (FA 2-15-13) (7-13)

Change(s) to: 120-1.
SP1200100AUse when contaminated areas are delineated in the plans
EXCAVATION AND EMBANKMENT - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-10)

Change(s) to: 120-10.3.1.
SP1201003SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
EXCAVATION FOR STRUCTURES AND PIPE - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-10)

Change(s) to: 125-9.3.1.
SP1250903SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
STABILIZING - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-10)

Change(s) to: 160-4.2.4.
SP1600402SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
PREDESIGNED STABILIZED SUBGRADE.
(REV 3-12-07) (FA 3-14-07) (1-10)

Change(s) to: 161.
SP1610000Non-Traffic and Shoulder-Only Construction. Do Not Use on Widening Projects
ROCK BASE - ACCEPTANCE PROGRAM
(REV 9-16-09) (FA 11-9-09) (7-10)

Change(s) to: 200-7.2.2
SP2000702SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
GRADED AGGREGATE BASE.
(REV 8-8-07) (1-10)

Change(s) to: 204.

SP2040000Non FA Jobs with 285 Items.
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-10)

Insert Information Required.
Change(s) to: 327-1, 327-6.
SP3270100When the plans provide a location for stockpiling milled material.Insert quantity to be retained. Use all, tons, cubic yards
MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 12-1-93) (1-10)

Change(s) to: 327-2.
SP3270200Use when requested by districts
PORTLAND CEMENT CONCRETE - ACCEPTANCE SAMPLING AND TESTING.
(REV 6-25-10) (FA 7-8-10) (1-11)

Change(s) to: 346-9.2.
SP3460902SLAll Contracts less than $2,000,000 and less than 2,000 tons of asphalt - Streamline. For Bridge repair/rehab projects, contact the DCE prior to use.
Structures Foundations - Dynamic Testing WITHOUT Test Piles.
(REV 6-26-12) (7-12)

Change(s) to: 455-1 through 455-12.
SP4550100DTwoTPProjects with 100% Dynamic Testing of Pile Foundations WITHOUT Test Piles.
Structures Foundations - Dynamic Testing WITH Test Piles.
(REV 6-26-12) (7-12)

Change(s) to: 455-1 through 455-12.
SP4550100DTwTPProjects with 100% Dynamic Testing of Pile Foundations WITH Test Piles.
INTEGRAL PILE JACKETS.
(REV 11-16-11) (FA 12-8-11) (7-12)

Change(s) to: 457.
SP4570000457 Items
STRUCTURAL STEEL AND MISCELLANEOUS METALS.
(REV 1-25-12) (7-12)

Change(s) to: 460-7.2, 460-8.8.
SP4600702460 Items
CRASH CUSHIONS.
(REV 8-4-11) (FA 8-9-11) (1-12)

Change(s) to: 544-4.
SP5440400544-75-1AA Items
LANDSCAPING.
(REV 2-27-13) (7-13)

Change(s) to: 580.
SP5800000Non FA Jobs with Landscaping.
Use when requested by the DDE.
(Mandatory #1)
LANDSCAPING.
(REV 3-15-13) (7-13)

Change(s) to: 580.
SP5800000FAAll Federal Aid Jobs with Landscaping.
Use when requested by the DDE. (Mandatory #1)
LANDSCAPING.
(REV 3-15-13) (7-13)

Change(s) to: 580.
SP5800000All Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE. (Mandatory #1)
MOTORIST AID CALL BOX RELOCATION.
(REV 8-24-10)  (1-11)

Change(s) to: 714.
SP7140000714-1-500
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II).
(REV 1-3-12) (FA 1-27-12) (7-12)

Change(s) to: 741.
SP7410000741-1 Items
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT.
(REV 6-16-99) (FA 7-20-99) (1-10)

Change(s) to: 743.
SP7430000743-70 Items
TRAFFIC MONITORING SITE SOLAR POWER UNIT.
(REV 10-22-10) (FA 11-22-10) (7-11)

Change(s) to: 744.
SP7440000744-70 Items
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY.
(REV 1-10-13) (FA 1-15-13) (7-13)

Change(s) to: 745.
SP7450000745-70 Items
TRAFFIC MONITORING SITE CABINET.
(REV 5-6-08) (FA 10-14-08) (1-10)

Change(s) to: 746.
SP7460000746-7A-BCD
TRAFFIC MONITORING SITE MODEM.
(REV 5-20-99) (FA 7-20-99) (1-10)

Change(s) to: 747.
SP7470000747-70 Items
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE EQUIPMENT AND MATERIALS.
(REV 5-12-99) (FA 7-20-99) (1-10)

Change(s) to: 748.
SP7480000Jobs with Traffic Monitoring Sites
STRUCTURAL COATING MATERIALS.
(REV 1-25-12) (7-12)

Change(s) to: 975-6.1.
SP9750601460 Items
 
Supplemental SpecificationsSS0000001All Jobs
005       CONTROL OF THE WORK.
(REV 12-7-12) (FA 1-28-13) (7-13)

Change(s) to: 005.
SS0050000All Jobs
006       CONTROL OF MATERIALS - SOURCE OF SUPPLY - STEEL.
(REV 1-24-13) (FA 2-15-13) (7-13)

Change(s) to: 6-1.3, 6-5.2.
SS0060103All Jobs
007       LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - DISADVANTAGED BUSINESS ENTERPRISE PROGRAM.
(REV 10-23-12) (FA 11-15-12) (7-13)

Change(s) to: 7-24.
SS0072400All Jobs
102       MAINTENANCE OF TRAFFIC.
(REV 10-9-12) (1-13)

Change(s) to: 102.
SS1020000All Jobs
105       CONTRACTOR QUALITY CONTROL REQUIREMENTS - COMPLIANCE WITH THE MATERIALS MANUAL.
(REV 3-7-13) (7-13)

Change(s) to: 105-3.2.
SS1050302All Jobs
107       LITTER REMOVAL AND MOWING.
(REV 12-3-12) (FA 12-12-12) (7-13)

Change(s) to: 107.
SS1070000All Jobs
125       EXCAVATION FOR STRUCTURES AND PIPE.
(REV 12-3-12) (FA 2-1-13) (7-13)

Change(s) to: 125-8.1.1, 125-9.2.1.
SS1250801All Jobs
234       SUPERPAVE ASPHALT BASE.
(REV 1-14-13) (FA 1-28) (7-13)

Change(s) to: 234-1, 234-2.1, 234-3.2.
SS2340100All Jobs
320       HOT MIX ASPHALT - PLANT METHODS AND EQUIPMENT.
(REV 1-14-13) (FA 1-28-13) (7-13)

Change(s) to: 320-2.1, 320-7.
SS3200201All Jobs
330      HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS.
(REV 11-20-12) (FA 1-28-13) (7-13)

Change(s) to: 330-3.2.2.
SS3300302All Jobs
334       SUPERPAVE ASPHALT CONCRETE.
(REV 1-14-13) (FA 1-28-13) (7-13)

Change(s) to: 334.
SS3340000All Jobs
336       ASPHALT RUBBER BINDER.
(REV 1-15-13) (FA 1-28-13) (7-13)

Change(s) to: 336-3.
SS3360300All Jobs
337       ASPHALT CONCRETE FRICTION COURSES.
(REV 1-14-13) (FA 1-28-13) (7-13)

Change(s) to: 337.
SS3370000All Jobs
346       PORTLAND CEMENT CONCRETE.
(REV 10-9-12) (1-13)

Change(s) to: 346.
SS3460000All Jobs
347       PORTLAND CEMENT CONCRETE - CLASS NS.
(REV 10-9-12) (1-13)

Change(s) to: 347.
SS3470000All Jobs
350       CEMENT CONCRETE PAVEMENT.
(REV 11-15-12) (FA 1-28-13) (7-13)

Change(s) to: 350-2.
SS3500200All Jobs
353       CONCRETE PAVEMENT SLAB REPLACEMENT.
(REV 2-14-13) (FA 2-15-13) (7-13)

Change(s) to: 353-11.
SS3531100All Jobs
400       CONCRETE STRUCTURES.
(REV 9-5-12) (FA 10-26-12) (7-13)

Change(s) to: 400.
SS4000000All Jobs
415       REINFORCING STEEL.
(REV 11-5-12) (FA 11-19-12) (7-13)

Change(s) to: 415-5.1.
SS4150501All Jobs
416       INSTALLING ADHESIVE BONDED ANCHORS AND DOWELS FOR STRUCTURAL APPLICATIONS.
(REV 11-1-12) (FA 11-5-12) (7-13)

Change(s) to: 416-6.1.1.
SS4160601All Jobs
425       INLETS, MANHOLES, AND JUNCTION BOXES.
(REV 10-9-12) (1-13)

Change(s) to: 425.
SS4250000All Jobs
430       PIPE CULVERTS.
(REV 2-4-13) (FA 2-11-13) (7-13)

Change(s) to: 430-1, 430-2.1, 430-3.2, 430-4.1, 430-4.3, 430-9, 430-11, 430-12.
SS4300100All Jobs
431       PIPE LINER.
(REV 9-13-12) (FA 11-5-12) (7-13)

Change(s) to: 431-7.
SS4310700All Jobs
450       PRECAST PRESTRESSED CONCRETE CONSTRUCTION.
(REV 9-26-12) (FA 10-26-12) (7-13)

Change(s) to: 450-10.52, 450-10.5.4.
SS4501005All Jobs
458       BRIDGE DECK JOINTS.
(REV 9-27-12) (FA 12-4-12) (7-13)

Change(s) to: 458-5.1.
SS4580501All Jobs
461       MULTIROTATIONAL BEARINGS.
(REV 10-25-12) (FA 10-31-12) (7-13)

Change(s) to: 461-5.
SS4610500All Jobs
470       TIMBER STRUCTURES.
(REV 11-13-12) (FA 2-1-13) (7-13)

Change(s) to: 470-12.2.
SS4701202All Jobs
471       POLYMERIC FENDER SYSTEMS.
(REV 11-26-12) (FA 2-1-13) (7-13)

Change(s) to: 471.
SS4710000All Jobs
521       CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS.
(REV 11-5-12) (FA 11-19-12) (7-13)

Change(s) to: 521-4.3.
SS5210403All Jobs
530       RIPRAP.
(REV 10-29-12) (FA 12-4-12) (7-13)

Change(s) to: 530-1, 530-2.2.1.
SS5300100All Jobs
544       CRASH CUSHIONS.
(REV 2-12-13) (FA 2-13-13) (7-13)

Change(s) to: 544.
SS5440000All Jobs
548       RETAINING WALL SYSTEMS.
(REV 12-5-12) (FA 2-11-13) (7-13)

Change(s) to: 548-2.6.2, 548-4, 548-8.5.1, 548-9.
SS5480206All Jobs
555       DIRECTIONAL BORE.
(REV 1-28-13) (FA 2-15-13) (7-13)

Change(s) to: 555.
SS5550000All Jobs
556       JACK AND BORE.
(REV 1-14-13) (FA 1-15-13) (7-13)

Change(s) to: 556-7, 556-8.
SS5560700All Jobs
557       VIBRATORY PLOWING.
(REV 12-5-12) (FA 1-15-13) (7-13)

Change(s) to: 557.
SS5570000All Jobs
560       COATING NEW STRUCTURAL STEEL.
(REV 1-16-13) (FA 2-1-13) (7-13)

Change(s) to: 560-2.4, 560-2.5, 560-6.2, 560-7.4 560-7.5, 560-7.7, 560-9.3, 560-9.7, 560-9.8.
SS5600204All Jobs
570       PERFORMANCE TURF.
(REV 1-11-13) (FA 1-15-13) (7-13)

Change(s) to: 570-3.3, 570-4, .
SS5700303All Jobs
630       CONDUIT.
(REV 1-17-13) (FA 2-6-13) (7-13)

Change(s) to: 630.
SS6300000All Jobs
632       SIGNAL CABLE.
(REV 1-23-13) (FA 2-6-13) (7-13)

Change(s) to: 632.
SS6320000All Jobs
633       COMMUNICATION CABLE.
(REV 1-23-13) (FA 2-6-13) (7-13)

Change(s) to: 633.
SS6330000All Jobs
635       PULL, SPLICE, AND JUNCTION BOXES.
(REV 1-30-13) (FA 2-6-13) (7-13)

Change(s) to: 635.
SS6350000All Jobs
649       GALVANIZED STEEL STRAIN POLES, MAST ARMS AND MONOTUBE ASSEMBLIES.
(REV 10-15-12) (FA 11-15-12) (7-13)

Change(s) to: 649-2, 649-5.
SS6490200All Jobs
660       VEHICLE DETECTION SYSTEM.
(REV 1-28-13) (FA 2-13-13) (7-13)

Change(s) to: 660.
SS6600000All Jobs
700       HIGHWAY SIGNING.
(REV 11-27-12) (FA 12-4-12) (7-13)

Change(s) to: 700-2.4.2.
SS7000204All Jobs
715       HIGHWAY LIGHTING SYSTEM.
(REV 1-8-13) (FA 2-5-13) (7-13)

Change(s) to: 715-3.1, 715-9, 715-16.
SS7150301All Jobs
782       VIDEO EQUIPMENT.
(REV 2-8-13) (FA 2-15-13) (7-13)

Change(s) to: 782.
SS7820000All Jobs
783       INTELLIGENT TRANSPORTATION SYSTEMS - FIBER OPTIC CABLE AND INTERCONNECT.
(REV 11-20-12) (FA 2-6-13) (7-13)

Change(s) to: 783.
SS7830000All Jobs
786       INTELLIGENT TRANSPORTATION SYSTEMS - VEHICLE DETECTION AND DATA COLLECTION.
(REV 11-20-12) (FA 2-6-13) (7-13)

Change(s) to: 786.
SS7860000All Jobs
916       BITUMINOUS MATERIALS.
(REV 1-15-13) (FA 1-28-13) (7-13)

Change(s) to: 916.
SS9160000All Jobs
919       GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER.
(REV 11-20-12) (FA 1-28-13) (7-13)

Change(s) to: 919.
SS9190000All Jobs
949       BRICK AND CONCRETE MASONRY UNITS FOR MANHOLES, INLETS AND OTHER STRUCTURES.
(REV 10-16-12) (FA 1-7-13) (7-13)

Change(s) to: 949.
SS9490000All Jobs
955       TIMBER TREATMENT (INCLUDING TREATING MATERIALS).
(REV 1-8-13) (FA 2-1-13) (7-13)

Change(s) to: 955.
SS9550000All Jobs
960       POST TENSIONING COMPONENTS.
(REV 12-17-12) (FA 1-13-13) (7-13)

Change(s) to: 960.
SS9600201All Jobs
971       TRAFFIC MARKING MATERIALS.
(REV 12-5-12) (FA 12-7-12) (7-13)

Change(s) to: 971-1.7.
SS9710107All Jobs
973       STRUCTURAL PLASTICS.
(REV 11-1-12) (FA 2-1-13) (7-13)

Change(s) to: 973.
SS9730000All Jobs
975       STRUCTURAL COATING MATERIALS.
(REV 1-14-13) (FA 2-1-13) (7-13)

Change(s) to: 975-2.4.1, 975-7.
SS9750204All Jobs
981       TURF MATERIALS.
(REV 12-3-12) (FA 1-8-13) (7-13)

Change(s) to: 981-3.2.
SS9810302All Jobs
992       HIGHWAY LIGHTING MATERIALS.
(REV 1-22-13) (FA 2-5-13) (7-13)

Change(s) to: 992-1.4, 992-1.8, 992-2.5, 992-2.7, 992-4,992-5.1.
SS9920104All Jobs
TECHNICAL SPECIAL PROVISIONS.

The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.

 

TSPsJobs with TSPs