The 2010 SIS Systemwide Data and Designation Review ("2010 DR") is the 2nd statewide review of SIS data and designations since the SIS was created. Although only the 2nd published statewide review, which is required annually, facilities with SIS funds programmed for right-of-way or construction phases in the 1st year of the department's work program have been reviewed each year to ensure required designation has been accomplished.
The primary purposes of the 2010 Designation Review are to:
Obtain updated data for adopted SIS and Emerging SIS designation criteria;
Update the activity-level thresholds based on national activity levels;
Fully implement eSIS for designation purposes; and
Update designation documentation to reflect eSIS designation processes.
The 2010 Designation Review will bring all data and designations up to date to at least January 29, 2010, the date the 2010 SIS Strategic Plan was adopted. Additional designation changes will be made if needed.

Currently Being Reviewed
The following documents and/or eSIS contents are currently under review.
Coming soon
Please send comments to:
Mr. Brian Watts
Office of Policy Planning
605 Suwannee Street, MS 28
Tallahassee, Florida 32399-0450
Email: brian.watts@dot.state.fl.us
Fax: (850) 414-4898
For further information contact Brian Watts or phone (850) 414-4818