EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Construction

Office of Construction

Current Memorandums

Picture of a Florida Roadway
Previous Construction Memo's that have expired will still apply to the projects let prior to the dates referenced in the memo, but will now require State Construction Engineer approval to ensure the intent of the memo is still applicable.
Matrix of DCE Memos for Zero Dollar Spec Changes
  DCE Memo's 2016
11-16 Ground In Rumble Stripes
10-16 New ASTM Standard for High Strength Structural Bolts
09-16 Public Records
08-16 Buy America Requirements-All Producers
07-16 MAC Full Implementation Schedule Update
06-16 Shoulder Traffic Level and Binder same as Mainline
05-16 MAC Full Implementation Schedule
04-16 Cemex Brooksville South Plant Revised
03-16 MASH-16 Implementation Plan
02-16 Titan American Cement Company Plant Revised
01-16 Revisions to Specification Section 400 - Concrete Structures Revised

  DCE Memo's 2015
24-15 Design Standard Index 17727
23-15 MAC Company Profile
22-15 Implementation of Vacuum Drying for Density of Cores
21-15 W-Beam Guardrail Panels
20-15 Revisions To Specification Section 353 - Concrete Pavement Slab Replacement
19-15 Eliminating Arithmetic Mean
18-15 Manufacturers' Warranties
17-15 Unreinforced Concrete Barrier Walls - Disposition of Cracks
16-15 Removal of the Requirement for Endorsements
15-15 Acceptance Test For Dynamic Message Signs
14-15 MAC Implementation & Contractor QC Plans
13-15 Materials Acceptance and Certification System (MAC) Implementation, Company Profile Training
12-15 Windrow Paving - Specification Changes To Section 330 - Hot Mix Asphalt - General Construction Requirements
11-15 Pile Installation Plan - Test Program and Production Pile Schedule
10-15 Amendment To The Construction Engineering And Inspection Scope Of Services For Hybrid Contracts
09-15 Mass Concrete
08-15 St Johns River Power Park Fly Ash-Jacksonville (FA17) Revised 4/27/15
07-15 PG 76-22 (ARB) Supply Issues and Changing to PG 76-22 (PMA) Revised 4/15/15
06-15 Revisions To Materials Manual Volume II Section 9.2 - Substitutions of Materials - Fly Ash
05-15 Revisions To Specification Section 346 - Portland Cement Concrete
03-15 Emulsions Now Listed on Approved Products List
02-15 Revisions To Specification Section 346 - Portland Cement Concrete
01-15 Separation Technologies - Big Bend, Apollo Beach FLY ASH (FA30)

  DCE Memo's 2014
20-14 Modification to Specification 919 - Ground Tire Rubber in Asphalt Binder
10-14 Sod Netting - Section 981
09-14 Eye Bolts for Span Wire Assembly
   

 

  DCE Memo's 2013
24-13 Conflict of Interest Clarification
13-13 Implementation of Electronic Submissions of Construction Documentation
08-13 End of Asphalt Load Segregation Concerns
07-13 Technical Specification Change for Reclaimed Concrete Aggregate (on Federal-Aid Projects)

 

  DCE Memo's 2012
10-12 Inclusion of FHWA 1273 in Sub-Contracts Revised 10/8/13

 

  DCE Memo's 2011
09-11 Unverified Concrete Lots on the Project - Final Materials Certifications

 

 

 

 

 

 

Complete Listing of Previous SCO Memos by Year
2014 2008 2002  
2013 2007 2001  
2012 2006 2000  
2011 2005 1999  
2010 2004 1998  
2009 2003