EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Construction

Office of Construction

Current Memorandums

Picture of a Florida Roadway
Previous Construction Memo's that have expired will still apply to the projects let prior to the dates referenced in the memo, but will now require State Construction Engineer approval to ensure the intent of the memo is still applicable.
Matrix of DCE Memos for Zero Dollar Spec Changes
  DCE Memo's 2014
21-14 Approval of Concrete Curing Compounds
20-14 Modification to Specification 919 - Ground Tire Rubber in Asphalt Binder
19-14 Use of Steel Reinforced polyethylene Pipe
18-14   Cross-Hole Sonic Logging Tubes in Drilled Shafts for Misc Structures
17-14 Specification Change for Section 200 Rock Base - Adding Pit Proctor
Pit Proctor Frequently Asked Questions FAQs for 17-14
16-14 Correction to Design Standard, Index 11860, Sheet 4
15-14 Pilot Study Concluded - Chloride Concentrations in Concrete
14-14 American Cement Company (CMT40) Expired 7/11/14
13-14 Painting Stencil Reinforcing
12-14 Span Wire Eyebolts - Substitutions
11-14 Work Zone Signs G20-1 & G20-2
10-14 Sod Netting - Section 981
09-14 Eye Bolts for Span Wire Assembly
08-14 Headwaters Orlando, Fly Ash (FA20) Expired 5/27/14
07-14 Cemex Brooksville South Cement Plant (CMT08) Expired 6/15/14
06-14 Control of Work - Subarticle 5-1.4.5.7 Beam & Girder Temporary Bracing Expired 9/1/14
05-14  Chloride Concentrations Argos USA and CEMEX Expired 6/30/14
04-14 Separation Technologies - Jacksonville Fly Ash (FA17) Expired 6/1/14
03-14 Titan America Cement Company Plant (CMT23) Expired 5/1/14
02-14 Vulcan Materials Expired 10/10/14
01-14 Use of Polypropylene Pipe
   

 

  DCE Memo's 2013
26-13 Supension of Contractor's Opreations - Holidays and Special Events (Article 8-6.4) - Christmas 2013/New Year 2014
24-13 Conflict of Interest Clarification
23-13 External Sign Lighting on Overhead Signs   Additional Details to 23-13
22-13 Public Records Law Specification Article 3-9
21-13 Programming & Funding for Landscape Contracts
19-13  Replacement of Comp Books with Plan Summary Boxes
17-13 Specification 430-4.8 Pipe Inspection
16-13 Demonstration Project for Non-Metallic Rebar Fasteners
13-13 Implementation of Electronic Submissions of Construction Documentation
11-13 Revisions to CTQM Requirements for Requalification of QC Manager, Asphalt Mix Designer, & Concrete Lab Level 2.
08-13 End of Asphalt Load Segregation Concerns
07-13 Technical Specification Change for Reclaimed Concrete Aggregate (on Federal-Aid Projects)
02-13 Design-Build & Public-Private Partnership Phase Reviewers;
Modifications to Electronic Review Comment (ERC) System

 

  DCE Memo's 2012
10-12 Inclusion of FHWA 1273 in Sub-Contracts Revised 10/8/13

 

  DCE Memo's 2011
14-11 Field Welding of Temporary Works
09-11 Unverified Concrete Lots on the Project - Final Materials Certifications

 

  DCE Memo's 2010
13-10 Field Welding

 

 

  Construction Training Memo's 2008
10-08 Guidelines for Changing the Binder Type in Friction Course Mixtures from Asphalt Rubber to Polymer Modified
01-08 Qualification Changes for Aggregate Technician Training

 

 

 

 

Complete Listing of Previous SCO Memos by Year
2013 2007 2002  
2012 2006 2001  
2011 2005 2000  
2010 2004 1999  
2009 2003 1998  
2008