Skip Navigation – Go to Main Content
Florida Department Of Transportation
Rotating image which displays various FDOT modes of travel
Your browser is currently set to not allow scripting. This site is best viewed with scripting turned on.
Several essential aspects of this site will not function with scripting disabled.

November 7, 2011 -- The Florida Department of Transportation's websites will be unavailable due to data center consolidation and relocation activities, beginning Thursday, November 10, 2011, 6:00 PM (EST). Services should resume by Monday, November 14, 2011 6:00 AM. We apologize for any inconvenience.

 Welcome to Florida’s Scenic Highways. 
Main Level Navigation



 

Office Level Navigation





David A. Sadler, P.E.
Director, Office of Construction

Helpful Sites
Site Map

FDOT Facilities
Maps - FDOT Facilities (Opens in a new window)
FDOT-Construction-Current Construction Memos
Office of Construction
Current Memos

Previous Construction Memo's that have expired will still apply to the projects let prior to the dates referenced in the memo,
but will now require State Construction Engineer approval to ensure the intent of the memo is still applicable.

Matrix of DCE Memos for Zero Dollar Spec Changes

  DCE Memo's 2012
05-12 Specification Change for Coarse Aggregate - No. 89 Stone Specification for No. 8 Sieve
04-12 St. Johns River Power Park Fly Ash Plant (FA17)
03-12 Reinforcing Steel Sample Frequency, Metals & Guardrail Steel Acceptance
02-12 Waste Asphalt Quantity Determination
01-12 Pre-stressed Concrete Products Curing Period

 

  DCE Memo's 2011
14-11 Field Welding of Temporary Works
13-11 Required Specification Change for Section 916 Bituminous Materials
12-11 Payment of Streamline Contracts Via Electronic Estimates Delivery (EED) and Schedule of Values Submittal Requirements on Future Streamline Lump Sum Contracts  REVISED
11-11 Use of Continuous Rail Bolsters for Support of Bridge Deck Reinforcing Bars on Stay-In-Place (SIP) Forms
10-11 MSE Wall Design Standards Index 6000 Series    (View MicroStation Drawings)
09-11 Unverified Concrete Lots on the Project - Final Materials Certifications
08-11 Standardized Concrete Sample Number/Lot Number System
07-11 Substandard Burlap-Polyethylene Sheeting
06-11 Hurricane Impacts to Construction Projects
05-11 Retained Yellow Color of Pavement Marking Materials
04-11 Specification Change for Section 914 - 2.2 Stabilization Materials
03-11 Loss of Crystal River Power Plant Fly Ash (FA-01)
02-11 OSHA Rule (29 CFR Part 1926) Cranes & Derricks in Construction
01-11 Introduction of the New FDOT Design Standards Index 6000 Series

 

  DCE Memo's 2010
17-10 High Slump Concrete with Lumps and Balls
13-10 Field Welding
05-10 Utilization of Embedded Data Collectors (EDC) in All Bridge Projects with Square Prestressed Concrete Pile Foundations
01-10 Testing of Elastomeric Bearing Pads for Bridge Structures (Addendum to DCE memo 20-09)

 

  DCE Memo's 2009
20-09 Testing of Elastomeric Bearing Pads for Bridge Structures
18-09 Technical Considerations for Flexible Pipe Selection and Substitution
09-09 Making Revisions to Contractor Quality Control Plans

 

  DCE Memo's 2008
14-08 Clarification of Use of Compressive Strength Results to Determine Form Removal
10-08 Guidelines for Changing the Binder Type in Friction Course Mixtures from Asphalt Rubber to Polymer Modified
09-08 Requirement for Products Listed on the QPL to be Manufactured by a Qualified Producer
08-08 Use of Palm Beach Aggregates in FC-5 Mixtures
07-08 Modified Density & Compaction Requirements for 1" Thick Lifts of SP-9.5 & FC-9.5 Superpave Mixtures
06-08 Qualified Products for Structural Coatings REVISED
03-08 Substituting Higher Strength Concrete for Lower Strength Concrete & Structural Concrete for Non-Structural Concrete
   
  Construction Training Memo's 2008
001-08 Qualification Changes for Aggregate Technician Training

 

  DCE Memo's 2007
23-07 Sod Netting - Section 981
16-07 Initial Retroreflectivity for Thermoplastic
13-07 Preliminary and Semifinal Inspection of Construction Projects
08-07 Asphalt Plant Staffing Requirements
04-07 Payment of Bond for Extra Work for Subcontractors REVISED 4/16/07
   
  DCE Memo's 2006

24-06

Clarification for 455-43 Auger Cast Piles
08-06 Disputes Review Board & Claims Certifications Requirements
07-06 Revision of Specification 8-3.7.3e, DRB Membership
02-06 Buy American Steel Requirements
   
  DCE Memo's 2005
26-05 Use of Approved Aggregate Products w/out Producer Certification
14-05 Adjustment to Incentive/Disincentive & Non-excuse Bonus Contracts Due to Material Shortages
   
  DCE Memo's for 2004
N/A Role of CEI Firms
   
  DCE Memo's for 2003
28-03 Contractor Quality Control - Implementation of The Unsoaked LBR Test
   
   
Complete Listing of Previous SCO Memos by Year
2010 2005 2000        
2009 2004 1999        
2008 2003 1998        
2007 2002          
2006 2001          
             
             
             
             
   
   

 

 

 

 

 

Go Back
Please contact Web Author with any comments,
or call 850-414-4150

 

 

Accessibility | Acronyms | Frequently Asked Questions | Governor's Office | Privacy Policy | Statement of Agency  

Email questions and comments to: 
Public Information Office for General Issues
Web Review Team for Website Issues
Copyright © 1996- Florida Department of Transportation

You might need Word Viewer or Adobe Reader to view file downloads

My Florida logo image  (Opens in New Window)
spacer image