Construction
Previous Construction Memo's that have expired
will still apply to the projects let prior to the dates referenced
in the memo,
but will now require State Construction Engineer approval to ensure the intent of the memo is still applicable.
Matrix of DCE Memos for Zero Dollar Spec Changes
but will now require State Construction Engineer approval to ensure the intent of the memo is still applicable.
Matrix of DCE Memos for Zero Dollar Spec Changes
| DCE Memo's 2010 | |
| 17-10 | High Slump Concrete with Lumps and Balls |
| 13-10 | Field Welding |
| 05-10 | Utilization of Embedded
Data Collectors (EDC) in All Bridge Projects with Square
Prestressed Concrete Pile Foundations |
| 01-10 | Testing of Elastomeric Bearing Pads for Bridge Structures (Addendum to DCE memo 20-09) |
| DCE Memo's 2007 | |
| 23-07 | Sod Netting - Section 981 |
| 16-07 | Initial Retroreflectivity for Thermoplastic |
| 13-07 | Preliminary and Semifinal Inspection of Construction Projects |
| 08-07 | Asphalt Plant Staffing Requirements |
| 04-07 | Payment of Bond for Extra Work for Subcontractors REVISED 4/16/07 |
| DCE Memo's 2005 | |
| 26-05 | Use of Approved Aggregate Products w/out Producer Certification |
| 14-05 | Adjustment to Incentive/Disincentive & Non-excuse Bonus Contracts Due to Material Shortages |
| DCE Memo's for 2004 | |
| N/A | Role of CEI Firms |
| DCE Memo's for 2003 | |
| 28-03 | Contractor Quality Control - Implementation of The Unsoaked LBR Test |
| Complete Listing of Previous SCO Memos by Year | |||
| 2011 | 2006 | 2001 | |
| 2010 | 2005 | 2000 | |
| 2009 | 2004 | 1999 | |
| 2008 | 2003 | 1998 | |
| 2007 | 2002 | ||