Skip Navigation – Go to Main Content
Florida Department Of Transportation
Rotating image which displays various FDOT modes of travel
Your browser is currently set to not allow scripting. This site is best viewed with scripting turned on.
Several essential aspects of this site will not function with scripting disabled.

November 7, 2011 -- The Florida Department of Transportation's websites will be unavailable due to data center consolidation and relocation activities, beginning Thursday, November 10, 2011, 6:00 PM (EST). Services should resume by Monday, November 14, 2011 6:00 AM. We apologize for any inconvenience.

 May is Motorcycle Safety Awareness Month. Click here to read the proclamation. 
Main Level Navigation



 

Office Level Navigation





David A. Sadler, P.E.
Director, Office of Construction

Helpful Sites
Site Map

FDOT Facilities
Maps - FDOT Facilities (Opens in a new window)
FDOT-Construction-2010 Memos
Office of Construction
2010 DCE Memos

Previous Construction Memo's that have expired will still apply to the projects let prior to the dates referenced in the memo,
but will now require State Construction Engineer approval to ensure the intent of the memo is still applicable.

  DCE Memo's 2010
19-10 Recent Specification Revision to Article 346-3.3 Mass Concrete
18-10 Substitution of Crown's Section 711 Thermoplastic Base Line
17-10 High Slump Concrete with Lumps and Balls
16-10 Specification Change for Course Aggregate - Reclaimed Portland Cement Concrete
15-10 Qualified Products for Structural Coatings
14-10 Streamline Lump Sum Contracts
13-10 Field Welding
12-10 Specification Change for Section 981 - Turf Materials
11-10 Standardized Concrete Sample Number/Lot Number System Revised
10-10 Maintenance of Traffic for Existing Steel Structures
09-10 Hurricane Impacts to Construction Projects
08-10 Interstate Projects Affecting Business Logo Structures
07-10 Modifications to Section 916 Bituminous Materials
06-10 Implementation of Revised Specification 4-3.9.1 (Existing Projects & Those Let Prior to July 2010)
05-10 Utilization of Embedded Data Collectors (EDC) in All Bridge Projects with Square Prestressed Concrete Pile Foundations
03-10 Installation of Shear Connectors for Steel Beams
02-10 Implementation of Recent Specification 346 Revisions on Existing Projects & Projects Let Prior to July 2010
01-10 Testing of Elastomeric Bearing Pads for Bridge Structures (Addendum to DCE memo 20-09)


 

 

 

Go Back
Please contact Web Author with any comments,
or call 850-414-4150

 

 

Accessibility | Acronyms | Frequently Asked Questions | Governor's Office | Privacy Policy | Statement of Agency  

Email questions and comments to: 
Public Information Office for General Issues
Web Review Team for Website Issues
Copyright © 1996- Florida Department of Transportation

You might need Word Viewer or Adobe Reader to view file downloads

My Florida logo image  (Opens in New Window)
spacer image