EMERGENCY INFORMATION - To be displayed on a situational basis. Hidden otherwise. Due to weather conditions, the Florida Highway Patrol has closed the Sunshine Skyway Bridge. More…

Construction

Construction Memos and Bulletins expire at the end of the calendar year in which they are issued, unless they are listed under the current memos.
Number

DCE Memo's 2007

23-07 Sod Netting - Section 981
22-07 Clarification of Specification 455-5.15.2
21-07 Concrete Pipe Gaskets
20-07 Use of 4x8 Inch Concrete Cylinders
19-07 Implementation of Concrete Sample/Lot Numbering System & Report
18-07 Revision to Specification 285 - Optional Base Course
17-07 Raised Retro-reflective Pavement Markers - Qualified Products List Removal
16-07 Initial Retroreflectivity for Thermoplastic
15-07 Verification Testing of Manufactured Products REVISED
14-07 Revision to Specification 9-8; Acceptance & Final Payment (Form FHWA-47)
13-07 Preliminary and Semifinal Inspection of Construction Projects
12-07 Clarification of Responsibility - Documentation for Installation of Drilled Shafts & Augercast Piles
11-07 Test Specification Section 330-12.4.6.3 Joint Smoothness Requirements
10-07 Shop Drawing Approval of Pedestrian/Bicycle Picket Railing Anchor Bolts
09-07 Revision to Specification 7-24.3 - DBE Records and Reports
08-07 Asphalt Plant Staffing Requirements
07-07 Detection of Soluble Salts Prior to Painting Structural Steel
06-07 Qualified Products for Structural Coatings
05-07 Contractor Certification Preparation - Stormwater Pollution Prevention Plan Form # 650-040-05
04-07 Payment of Bond for Extra Work for Subcontractors REVISED 4/16/07
03-07 Modified Independent Verification Procedure for Asphalt REVISED 8/20/07
02-07 Change to Specification 975 - Structural Coating Materials
01-07 Quality Control Personnel Training