EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Construction

Office of Construction / Publications / CPAM

CPAM Redline History

Picture of a Florida Roadway
    View Recently Revised Chapters
Chapter/Section Revised Date Title
Table of Contents 1/24/13  
Introduction    
Introduction II 1/1/13 Final Estimates Process
   
PRE-Construction
Chapter 1   PRE-LETTING ACTIVITIES
Chapter 1 TOC   Table of Contents
1.1 5/13/08 Plans Review and Comments
1.2 3/26/12 Constructability/Biddability Reviews
Contract Duration & Alternative Contracting Techniques
1.3 2/4/13 Pre-Bid Questions & Answers
Chapter 2   Office Preparation
Chapter 2 TOC   Table of Contents
2.1 3/11/11 Project Scheduling
2.2 1/24/13 Final Estimates Pre-Planning
Chapter 3   Preconstruction activities
Chapter 3 TOC   Table of Contents
3.1 10/12/11 Preconstruction Conference Partial Payment for Certain Materials
3.2 12/8/09 Quality Control
3.3 11/21/08 Contractor's Quality Control Plan  Unpaid Bills Processing 
3.4 7/1/11 Dispute Review Boards
3.5 1/24/13 Quality Assurance Reviews for Final Estimates
Chapter 4   Consultant CEI Management
Chapter 4 TOC   Table of Contents
4.1 11/2/12 Administration of Contract Time Suspension of Contract Time
4.2 11/2/12 Construction Contract Time Extension Procedure
Chapter Revised Date Title
   
Construction
Chapter 5   project documentation
Chapter 5 TOC 3/11/10 Table of Contents
5.1 ; Pen & Ink 6/8/10 F.A.I.N. Resolution  Project Diary
5.2 12/14/10 Contractor Vehicle Registration Environmental Commitment Compliance
5.3   Overweight Loads
5.4 3/25/09 Operation Within Railroad Right of Way Contract Wage Requirements
5.5   Shop and Erection Drawing Approval
5.6 9/1/08 Construction Contract Delinquency
5.7 4/5/11 Experimental Application - Dissemination of Information Federal-Aid Project Requirements
5.8 10/13/11 Control of Materials
5.9 4/5/11 Process Review of Construction Engineering & Inspection
5.10 8/31/11 Verification Inspection & Testing
5.11 10/11/13 Final Estimates Documents
5.12 1/24/13 Final "As-Built" Plans Process
5.13 4/23/13 Computation Books
5.14 1/24/13 Field Records
5.15 1/24/13 Final Measurements
5.16 1/24/13 Earthwork Notes & Documentation
     
Chapter 6   contract payments
Chapter 6 TOC   Table of Contents
6.1 12/14/10 Maintenance of Traffic Unpaid Bills Processing
6.2 1/24/13 Alternative Contracts
Chapter 7   Contract Modifications
Chapter 7 TOC 5/15/08 Table of Contents
7.1   Contractor's Past Performance Report
7.2 1/1/12 Time Extensions
7.3 3/6/13 Supplemental Agreements & Unilateral Payments
Post Award Plans and Contract Changes
7.4 7/11/11 Contingency Supplemental Agreements, Work Orders/Field Supplemental Agreements
7.5 8/25/11 Construction Contract Claims
Chapter 8   administrative requirements
Chapter 8 TOC 5/11/09 Table of Contents
8.1   Administration of Consultant CEI Contracts
8.2 2/15/12 Environmental Permit Compliance
8.3   Operation Within Railroad Right-of-Way
8.4 4/23/09 Shop & Erection Drawing Process
8.5 6/11/12 Contract Delinquency
8.6 6/11/12 Contract Default
8.7 12/8/10 Contractor Non-Responsibility For Construction Contract
8.8 4/13/10 State Arbitration Board
8.9 12/8/10 Contract Termination
8.10 4/24/12 Noise & Vibration Abatement
8.11 9/14/11 Contractor Initiated Submittals
8.12 1/24/13 Joint Participation Agreements
Chapter 9   Maintenance of traffic
Chapter 9 TOC   Table of Contents
9.1 4/6/05 Maintenance of Traffic (MOT)
9.2   Work Zone Regulatory Speeds
9.3 11/3/03 Work Zone Traffic Incident Evaluation and Reporting
Chapter 10   Structures
Chapter 10 TOC 5/1109 Table of Contents
10.1 7/17/13 Piles Pile Lengths
10.2 10/26/12 Straight-edging and Correction of Surface Deficiencies on Last Asphalt Layer Prior to the Friction Course  Prestressed/Precast Concrete Componenets
10.3 12/12/11 Concrete Construction Rejection of Asphalt Mix Based on Temperature
10.4 12/7/11 Coatings Paint & Asbestos Removal, Handling & Disposal & Structural Steel Coating Issues
10.5 4/23/12 Drilled Shafts
10.6   Mass Concrete Underwater Bridge Construction Inspection
10.8 4/23/12 Auger Cast Piles
10.9 1/16/09 Structural Steel & Miscellaneous Metal Components
CHAPTER 11   ASPHALT
Chapter 11 TOC 9/9/13 Table of Contents
11.1   Introduction Deleted - Asphalt Plant Operations (as of 9/3/13)
11.23 5/18/11 Asphalt Mix Temperature Control
Density Earthwork Inspection Training Program
11.4 9/3/13 Adjustments
11.52 8/29/11 Asphalt and Correction of Surface Deficiencies on Asphalt Pavement
Asphalt Technician Qualification Programs for Plant and Paving Technicians
11.6 9/3/13 Documentation for Multi-Fin Projects, Under One Contract
11.7 9/3/13 Asphalt Construction Information for CQC Specifications
11.8 9/3/13 Submittals
11.9 9/3/13 Salvage of Materials
Chapter Revised Date Title
   
Post-Construction
Chapter 12   Project Closeout
Chapter 12 TOC   Table of Contents
12.1 3/29/11 Project Acceptance
Chapter 13   Performance Ratings
Chapter 13 TOC   Table of Contents
13.1 6/14/12 Contractor's Past Performance Rating
13.2 12/19/11 Constructability Grades
13.3   Contractor Survey