Date | FIN# | Contract | Subject | A/R/P |
2/7/22 | 44031115201 | E5Z67 | FDOT vs Com. Industrial Corp via Anderson Columbia (prime) | A |
| | | | |
5/21/21 | 23839555201 | T5650 | Additional Temporary Asphalt/Asphalt Pad under Low Profile Barrier | A |
| | | | |
3/18/18 | 23920345201 23920345601 | T5469 | SR 50 (Colonial Drive) Dean Road to Avon Park Blvd | R |
| | | | |
12/8/17 | 24262635201 | E5W11 | I-75 Widening (SR 93) From South of CR 470 to South of Florida Turnpike | R |
11/12/17 | 23759225201 | T5431 | SR 5 (US 1) North of Pine St. to North of Cidco Rd. - Issue 1.7 | A |
10/20/17 10/30/17 | 40714345201 | T5552 | Sand Lake Road (482) Widening from International Drive to Florida's Turnpike Including the John Young Parkway Flyover Bridge | A |
9/22/17 | 23759225201 | T5431 | SR 5 (US 1) North of Pine St. to North of Cidco Rd. - Issue 3.1 Inefficiency | A |
9/12/17 | 23759225201 | T5431 | SR 5 (US 1) North of Pine St. to North of Cidco Rd. - Preservation Issues 2.1 | A |
8/8/17 | 43219315201 | E5W13 | I-4 Ultimate Project – Damage to Fiber Optic Network | A |
8/8/17 | 43219315201 | E5W13I-4 Ultimate Project – Location of Opaque Visual Barrier | A |
8/6/17 | 23759225201 | T5431 | SR 5 (US 1) North of Pine St. to North of Cidco Rd. - Issues 2.2 and 2.3 | A |
7/24/17 | 40846415201 | E5R16 | I-4 (SR 400) Widening from SR 44 to I-95 | A |
6/21/17 | 40714355601 40714355602 40714345601 40714345603 | T5552 | Sand Lake Road (482) Widening from International Drive to Florida's Turnpike Including the John Young Parkway Flyover Bridge | A |
| | | | |
9/22/16 | 23871915201 | T5486 | Delays attributable to Plan Error Subsoil Excavation | A |
9/19/16 | 23871915201 | T5486 | Pond Differing Site Conditions | R |
| | | | |
5/10/16 | 42204217202 | E5P67 | Performance Aesthetics Contract with Foundation Services of Central Florida, Inc. | A |
1/30/12 | 42563817201 | E5M69 | SR 400 (I-4) - Repair of Cracked Concrete Slabs | A |
9/14/11 | 23842945201 | T5271 | SR 50 (W Colonial Dr.) - Hard Driving Sheet Pile @ TW1 & TW3 | A |
7/27/10 | 42334745201 | T5318 | SR 50 (Colonial Drive) - Replacement of Pavement Due to Ripples | A |
| | | | |
4/16/09 | 41166525201 | E5L60 | SR 464 over CSX RR - Unsuitable Material Issue | R |
4/4/09 | 41166525201 | E5L60 | SR464 over CSX - Time Extension for Late Delivery of CSX Signal System | A |
4/1/09 | 41166525201 | E5L60 | SR464 over CSX - Compensation for temporary poles and signal at SW 12th Ave | R |
| | | | |
12/3/08 | 24160215201 | T5164 | CR 484 - Deletion of Variability Factor Embankment Quantity | A |
10/3/07 | 41715415201 | T5152 | SR 40 - Remove & Replace Pavement with Surface Deficiencies - Ripples | A |
3/6/07 | 23746615201 | T5041 | SR 520 - Payment of Pile Splices | A |
| | | | |
11/17/06 | 24249315201 | T5043 | I-4/John Young Parkway - Delayed Water Use Permit | A |
9/26/06 | 24249315201 | T5043 | I-4/John Young Pkwy - MSE Wall Coating & Elastomeric Box Girder Coating | A |
| | | | |
10/16/06 | 23929415201 | T5044 | SR 520 Pipe Installation - Additional Time/Compensation | A |
1/30/06 | 24080525201 | T5036 | SR 44 - Prestress Impact to Supplier | A |
1/17/06 | 23831415201 | T5063 | US441 Pavement Markings & Sand Seal Coating | A |
9/23/05 | 40460115201 | T5037 | SR 528 - Indian River Bridge - Pier 13 Footing Remove/Replace | R |
8/30/05 | 23750625201 | T5024 | SR 520 (Banana River) - Mass Concrete Pour of Footings | A |
| | | | |
8/30/05 | 23945425604 | T5015 | SR-436 (SR528 to SR552) Additional Pipe Backfill Material Compensation | A |
2/9/05 | 23945425604 | T5015 | SR436 (JPA w/ City of Orlando) Payment for Meg-a-lugs | A |
| | | | |
6/22/05 | 23755015201 | 21485 | SR 5 (US 1) - Median Curb, Driveway Delay, Sheet Piling & Bedding Stone Extra Work | A |
3/8/04 | 23755015201 | 21485 | SR 5 (US 1) - Bell South Impact (Utility Relocation) | A |
11/9/03 | 23755015201 | 21485 | SR 5 (US 1) - Box Culvert Impact | A |
| | | | |
1/31/05 | 24017415101 | 21164 | SR 426 (Aloma Ave) Non-Payment of Over-thickness FC-3 | A |
11/8/04 | 40917315201 | T5025 | SR15 (US 441) - Base Material Shortage | A |
| | | | |
11/5/04 | 24075815201 | 21266 | SR 5A (Nova Rd.) Overrun in Mowing | A |
11/5/04 | 24075815201 | 21266 | SR 5A (Nova Rd.) Anchor Bolt Tensile Testing | A |
11/5/04 | 24075815201 | 21266 | SR 5A (Nova Rd.) Area Wide Cement Shortage | A |
1/28/03 | 24075815201 | 21266 | SR 5A (Nova Rd.) Equitable Adjustment - Coquina Rock Boulders in Pipe Trench | A |
| | | | |
10/10/04 | 24016715201 | 21447 | SR434 Cutting and Patching 85 Open Cut Locations (Install of New Water/Force Mains) | A |
7/23/04 | 23929215201 | 21459 | SR 520 - Asphalt Base Removal & Stabilization Issues | R |
4/12/04 | 23750615201 | 21239 | SR 520 (Low Level Bridge Replacement) Escalated Workers Compensation Rates | A |
12/18/03 | 24075715201 | 21265 | SR 5A (Nova Rd.) Contract Schedule, Computation of Contract Time | A |
11/13/03 | 40517615201 | 21533 | SR 15/600 (US 17/92) Assessment of LD's (Soil Conditions, Weather, Shop Drawing Delays) | A |
9/29/03 | 23928815201 | 21588 | SR 435 (Kirkman Rd) Maintaining Commercial Material & Payment of Temporary Detection | A |
1/6/03 | 24249915201 | E5F21 | SR 400 (I-4) Add Thru Lanes - Soil Replacement Claim | A |
1/6/03 | 24249915201 | E5F21 | I-4 Auxiliary Lanes Median Edge Drains | A |
| | | | |
5/15/02 | 23867915201 | 20605 | SR 500 (US 27) Sheet Piling & City of Ocala Electric Pole at Pond E-2 | A |
4/5/02 | 23867915201 | 20605 | SR 500 (US 27) Off Duty Law Enforcement | A |
4/5/02 | 23867915201 | 20605 | SR 500 (US 27) Borrow Pit Permit & Haul Road Delay Claim | A |
6/30/00 | 23867915201 | 20605 | SR 500 (US 27) Restrictions on Burning Operations of Clearing & Grubbing Debris | A |
| | | | |
2/8/02 | 23967015201 | 20208 | SR 530 (US 192) Claim Issue - Utility Conflict | R |
9/19/00 | 23967015201 | 20208 | SR 530 (US 192) Failure to Comply with Specifications ("Pigging" Water Line) | A |
| | | | |
1/10/01 | 24017815202 | 20176 | SR414 (Maitland Blvd) Unforeseen Conditions (Hardpan) & Broken Sewer Line | A |
11/13/00 | 23863515201 | 20443 | SR 200 - Utility Conflicts, Differing Site Condition (Pond 3), Conflict w/ Electrical Guy Wires & Poles, Timely Installation of Stored Materials (4 Issues) | A |
3/30/00 | 24012115201 | 19997 | SR 15 (US 17-92) Adjusting Contract Incentive Time | A |
| | | | |
| | | A = Accepted, P = Partial Acceptance, R = Rejected | |