Construction
This table provides
brief clarifications to the works that are allowed to be performed
by Contractor's Engineer of Record, Pre-qualified Specialty Engineer
and Specialty Engineer as defined in Specification Section 1. For
definitions, additional information and further clarifications refer
to Specification Section 1.
|
Work Type |
Contractor's Engineer of Record |
Pre-qualified Specialty Engineer |
Specialty Engineer |
|
Re-design |
Yes |
No |
No |
|
VECP |
Yes |
No |
No |
|
Details of the permanent work not fully detailed in the
plans (Example: Pot Bearing Design, non-standard expansion
joints, MSE walls, other specialty items) |
Yes |
Yes |
Yes |
|
Design and details of the permanent work declared to be
minor or non-structural including minor repairs |
Yes |
Yes |
Yes |
|
Design and details of the permanent work declared to be
major or structural including major repairs |
Yes |
Yes* |
No |
|
Design and drawings of temporary works, such as falsework,
formwork, etc. |
Yes |
Yes |
Yes |
| |
|
|
|
| |
*The work must also be checked by another
pre-qualified Specialty Engineer |
| |
|
|
|
| |
|
|
|