| Number |
Date |
Subject |
|
2012 |
| 12-02 |
05/01/12 |
Asphalt IV Failure Concurrence |
|
12-01 |
02/06/12 |
Permission to Wear Shorts
|
|
2008 |
|
08-05 |
09/03/08 |
Shop Drawing Flow Diagram for -
Structural Items
Link to Diagram Here Design-Bid-Build
Projects |
|
08-04 |
08/15/08 |
Good Practice for Design-Build |
| 08-03 |
03/14/08 |
Rubber vs Polymer |
| 08-02 |
02/19/08 |
Using Work Orders to Begin Extra Work |
|
08-01 |
02/18/08 |
Permanent Speed Limit Signing on Reconstruction Projects |
|
2007 |
| 07-16 |
08/21/07 |
Initial Retroreflectivity for Thermoplastic |
|
07-01 |
03/09/07 |
Asphalt Lot Package
(Paperwork Reduction) |
|
2006 |
|
06-03 |
10/18/06 |
E&O Resolution Tracking
System |
|
06-02 |
07/10/06 |
Eliminating Disposition
of Defective Material (DDM) for IV failures meeting specific
criteria |
|
06-01 |
03/28/06 |
FHP Hireback |
|
2005 |
|
05-04 |
09/12/05 |
Hurricane Katrina Impacts |
|
05-03 |
7/28/05 |
Permanent Speed Limit signing on RECONSTRUCTION projects |
|
05-02 |
5/17/05 |
Resuming Asphalt Production
After QC Failure / QC Plan Suspensions |
|
05-01 |
1/14/05 |
Grout
Pads Beneath Miscellaneous Structure Baseplates |
|
2004 |
|
04-06 |
10/28/04 |
Sign Inspections |
| 04-05 |
10/6/04 |
Structural Concrete and Drilled Shafts on Construction Projects |
| 04-04 |
8/6/04 |
Material Sampling and Test Reports |
| 04-03 |
3/1/04 |
Final Estimates Certification |
| 04-02 |
2/19/04 |
Proper Notification and QC Plans |
| 04-01 |
2/06/04 |
Substitution of Pipe This memo supersedes RE Memo #03-09 |
|
2003 |
| 03-10 |
10/6/03 |
Signature Authority for certain
documents |
| 03-09 |
10/6/03 |
Substitution of Pipe |
| 03-08 |
9/10/03 |
***NEW for projects with precons after Sept. 30, 2003**** Structural Shop Drawing Reviews |
| 03-07 |
8/29/03 |
Monthly Estimates / Work Orders |
| 03-06 |
7/7/03 |
Delegation of Schedule Acceptance
Responsibility |
| 03-05 |
6/11/03 |
Reflective Pavement Markers |
| 03-04 |
5/12/03 |
Emergency Response Team Schedule |
| 03-03 |
5/12/03 |
Pre-Construction Meetings Notification
List |
| 03-02 |
3/5/03 |
Field Supplemental Agreement/Work Order Distribution and Granted Time Procedure |
| 03-01 |
3/5/03 |
Business Entrance Signs |
|
2002 |
| 02-07 |
11/18/02 |
Construction Zone Speed Limits |
| 02-xx |
9/13/02 |
Field Supplemental
Agreement/Work Order Distribution and Granted Time Procedure |
| 02-06 |
6/10/02 |
Work Plan - Controlling Item of Work
Form 700-010-15 |
| 02-05 |
4/22/02 |
Temporary Design
Bulletin C02-08 Effective April 16, 2002 |
| 02-04 |
4/18/02 |
Field Supplemental
Agreement & Work Order |
| 02-03 |
3/7/02 |
Plans Review |
| 02-02 |
3/5/02 |
CCEI Certified Final Estimates |
| 02-01 |
2/12/02 |
Sodding, Topsoil & Reworking Shoulders |
|
2001 |
| 01-12 |
11/26/01 |
Traffic Signal Inspections |
| 01-11 |
6/28/01 |
Finished Soil Layer Organic Content |
| 01-06 |
3/3/01 |
Landscaping In Front of Billboards |
| 01-05 |
2/22/01 |
Inspection Coordination of Off Project Fabricated Components for
Design/Build and Lump Sum Projects |
|
2000 |
| 00-19 |
10/2/00 |
Permission to Work on a Holiday |
| 00-15 |
6/6/00 |
Design Mixes for Final Estimates |
| 00-05 |
2/24/00 |
Asphalt Technician Performing Rice Test |
|
|
|
|
|
|