Skip Navigation – Go to Main Content
Florida Department Of Transportation
Rotating image which displays various FDOT modes of travel
Your browser is currently set to not allow scripting. This site is best viewed with scripting turned on.
Several essential aspects of this site will not function with scripting disabled.

November 7, 2011 -- The Florida Department of Transportation's websites will be unavailable due to data center consolidation and relocation activities, beginning Thursday, November 10, 2011, 6:00 PM (EST). Services should resume by Monday, November 14, 2011 6:00 AM. We apologize for any inconvenience.

 May is Motorcycle Safety Awareness Month. Click here to read the proclamation. 
Main Level Navigation



 


Office Level Navigation
FDOT Facilities
Maps - FDOT Facilities (Opens in a new window)
Operating Procedures .^. District Five's District Construction Office - Florida DOT

District 5 Construction Office

John Tyler, P.E. - District Construction Engineer

Some of the links below are in PDF format and can only be viewed with Adobe Acrobat Reader

Standard Operating Procedures and Example Documents (Expand All | Collapse All)
Link to CPAM Chapters  
Pre-Construction (Ch 1-4)
Chapter 1 Pre-Letting Activities
1.1 Plans Review and Comments
1.2 Contract Duration and Alternative Contracting Techniques
Chapter 2 Office Preparation
  SiteManager
  Hummingbird
2.1 Project Scheduling
Chapter 3 Pre-Construction Activities
  Project Administrator's Handbook

Pre-Work Agendas
  Preconstruction Project Review List - Ocala Operations version
  Contracts
  Modified Pass the Torch Meeting
  Final Estimate Pre-Construction Kickoff Meeting
3.1 Preconstruction Conference
3.2 Quality Control

Statewide Inspection Guidelist 09/10

District 5 Construction QA/QC Plan

District 5 Specific Inspection Guidelist 09/10

3.3 Contractor's Quality Control Plan
Sample QC Plan Acceptance Letter
Sample QC Plan Non Acceptance Letter
3.4 Dispute Review Board
  Notice of beginning and completion
Chapter 4 Consultant CEI Management
4.1 Administration of Consultant CEI Contracts
4.2 Consultant CEI Accountability
Construction (Ch 5 - 11)
Chapter 5 Project Documentation
5.1 Project Diary
5.2 Contractor Vehicle Registration
5.3 Subletting of Contract
5.4 Contract Wage Requirements
5.5 Equipment Rental
5.6 Utility Relocation
5.7 Federal Aid Project Requirements
5.8 Control of Materials - Link to Materials
5.9 Quality Assessment Plan
5.10 Verification Inspection & Testing - Link to Materials
Chapter 6 Contract Payments
6.1 Unpaid Bills Processing
  Monthly Estimates
Chapter 7 Contract Modifications
7.1 Post Award Plan and Contract Changes
7.2 Time Extensions
7.3 Supplemental Agreements and Unilateral Payments
7.4 Contingency Supplemental Agreements and Work Orders
7.5 Construction Contract Claims
Chapter 8 Administrative Requirements
8.1 F.A.I.N Resolution
8.2 Environmental Commitment Compliance
8.3 Operation Within Railroad Right-of-Way
8.4 Shop & Erection Drawing Process
8.5 Contract Delinquency
8.6 Contract Default
8.7 Contractor Non-Responsibility For Construction Contract
8.8 State Arbitration Board
8.9 Contract Termination
8.10 Noise & Vibration Abatement
Chapter 9 Maintenance Of Traffic
9.1 Maintenance of Traffic (MOT)
9.2 Work Zone Regulatory Speeds
9.3 Work Zone Traffic Incident Evaluation and Reporting
Chapter 10 Structures - Link to Materials
10.1 Pile Lengths
10.2 Prestressed / Precast Concrete Components
10.3 Concrete Construction
10.4 Paint Removal and Disposal
10.5 Drilled Shafts
10.7 Post Tensioned Bridges
10.8 Auger Cast Piles
10.9 Structural Steel & Miscellaneous Metal Components
Chapter 11 Asphalt - Link to Materials
11.1 Asphalt Quality Assurance (QA) Referee System for Non-QC2000 Projects
11.2 Testing and Correction of Surface Deficiencies on Asphalt Pavement
11.3 Asphalt Mix Temperature Control
Pre-Paving Meeting Agenda
Pre-Paving Meeting Minutes Amendment
Post-Construction (Ch 12 - 13)
  Final Estimates
Chapter 12 Project-Closeout
12.1 Project Acceptance
Chapter 13 Performance Ratings
13.1 Contractor's Past Performance Rating (Construction - Pre-qualified)
  Contractor's Performance Rating (Maintenance - Non-prequalified)
  Asset Maintenance Performance Evaluation Report
13.2 Constructability Grades (included ALL information previously submitted on the PA Report on Construction Plans. Please be sure to make complete comments.)
13.3 Contractor Survey (Survey for Maintenance and Construction Contracts will be Mailed to the Contractor by the District Office)
  Final Estimates (All Construction and Phase 72 Pre-qualified)
  Final Estimates (Streamline Phase 52/72)
  Warranty Bonds

Warranty Flowcharts

Warranty Letter Template
 

  Extinguish the Torch
Miscellaneous
  Local Agency Program
  Miscellaneous Items
  Project Administration Tools  


Web Author:

 

Accessibility | Acronyms | Frequently Asked Questions | Governor's Office | Privacy Policy | Statement of Agency  

Email questions and comments to: 
Public Information Office for General Issues
Web Review Team for Website Issues
Copyright © 1996- Florida Department of Transportation

You might need Word Viewer or Adobe Reader to view file downloads

My Florida logo image  (Opens in New Window)
spacer image