Skip Navigation – Go to Main Content
Florida Department Of Transportation
Rotating image which displays various FDOT modes of travel
Your browser is currently set to not allow scripting. This site is best viewed with scripting turned on.
Several essential aspects of this site will not function with scripting disabled.

November 7, 2011 -- The Florida Department of Transportation's websites will be unavailable due to data center consolidation and relocation activities, beginning Thursday, November 10, 2011, 6:00 PM (EST). Services should resume by Monday, November 14, 2011 6:00 AM. We apologize for any inconvenience.

 May is Motorcycle Safety Awareness Month. Click here to read the proclamation. 
Main Level Navigation



 


Office Level Navigation
FDOT Facilities
Maps - FDOT Facilities (Opens in a new window)
Memos and Workorders .^. District Five's District Construction Office - Florida DOT

District 5 Construction Office

John Tyler, P.E. - District Construction Engineer

Some of the links below are in PDF format and can only be viewed with Adobe Acrobat Reader

Construction Office - DCE Memo's & Workorders

(Click on the Memo Number to view the Work Order)

Work Orders DCE Memo's 2012
16-12 Commercial Material for Driveway Maintenance
15-12 Lifting of Interim Restrictions on Class II HDPE Pipe
14-12 Coating of Structural Steel: Soluble Salt Testing & Caulking
13-12 Silt Fence Stake Size Clarification
12-12 Interpretation of Supplemental Specification 455(Dynamic Load Tests)
11-12 Cross-Hole Sonic Logging (CSL) Tubes
10-12 Inclusion of FHWA 1273 in Sub-Contracts
09-12 Thermoplastic Observation Period
08-12 Implementation of Specification 4-3.9.1 (Cost Savings Initiative Proposals) for Design-Build Projects
07-12 Labeling of SW Highway Thermoplastic Material
06-12 American Cement Company Cement Plant (CMT40)
05-12 Specification Change for Coarse Aggregate - No. 89 Stone Specification for No. 8 Sieve
04-12 St. Johns River Power Park Fly Ash Plant (FA17)
03-12 Reinforcing Steel Sample Frequency, Metals & Guardrail Steel Acceptance
02-12 Waste Asphalt Quantity Determination
01-12 Pre-stressed Concrete Products Curing Period

Work Orders DCE Memo's 2011
14-11 Field Welding of Temporary Works
13-11 Required Specification Change for Section 916 Bituminous Materials
12-11 Payment of Streamline Contracts Via Electronic Estimates Delivery (EED) and Schedule of Values Submittal Requirements on Future Streamline Lump Sum Contracts
11-11 Use of Continuous Rail Bolsters for Support of Bridge Deck Reinforcing Bars on Stay-In-Place (SIP) Forms
10-11 MSE Wall Design Standards Index 6000 Series
09-11 Unverified Concrete Lots on the Project - Final Materials Certifications
08-11 Standardized Concrete Sample Number/Lot Number System
07-11 Substandard Burlap-Polyethylene Sheeting
06-11 Hurricane Impacts to Construction Projects
05-11 Retained Yellow Color of Pavement Marking Materials
04-11 Specification Change for Section 914 - 2.2 Stabilization Materials
03-11 Loss of Crystal River Power Plant Fly Ash (FA-01)
02-11 OSHA Rule (29 CFR Part 1926) Cranes & Derricks in Construction
01-11 Introduction of the New FDOT Design Standards Index 6000 Series

 

Work Orders DCE Memo's 2010
19-10 Recent Specification Revision to Article 346-3.3 Mass Concrete
18-10 Substitution of Crown's Section 711 Thermoplastic Base Line
17-10 High Slump Concrete with Lumps and Balls
16-10 Specification Change for Course Aggregate - Reclaimed Portland Cement Concrete
15-10 Qualified Products for Structural Coatings
14-10 Streamline Lump Sum Contracts
12-10 Specification Change for Section 981 - Turf Materials
10-10 Maintenance of Traffic for Existing Steel Structures
08-10 Interstate Projects Affecting Business Logo Structures
07-10 Modifications to Section 916 Bituminous Materials
06-10 Implementation of Revised Specification 4-3.9.1 (Existing Projects & Those Let Prior to July 2010)
05-10 Utilization of Embedded Data Collectors (EDC) in All Bridge Projects with Square Prestressed Concrete Pile Foundations
03-10 Installation of Shear Connectors for Steel Beams
02-10 Implementation of Recent Specification 346 Revisions on Existing Projects & Projects Let Prior to July 2010
01-10 Testing of Elastomeric Bearing Pads for Bridge Structures (Addendum to DCE memo 20-09)

 

Work Orders DCE Memo's 2009
20-09 Testing of Elastomeric Bearing Pads for Bridge Structures
18-09 Technical Considerations for Flexible Pipe Selection and Substitution
17-09 Correction to SP0060100LS - Specification Workbook 2010
16-09 Hurricane Impacts to Construction Projects
15-09 Correction to Design Standards Index 5205
14-09 Mandatory Utilization of Embedded Data Collectors (EDC) in All Bridge Projects with Square Prestressed Concrete Pile Foundations
13-09 Qualified Products for Materials for Concrete Repair
12-09 Centrifugally Spun Cast Concrete Poles
11-09 Specification Changes for Section 330; Hot Bituminous Mixtures - General Construction Requirements
10-09 Clarification of Specification 455-16.2 & 455-20(d)
09-09 Making Revisions to Contractor Quality Control Plans
08-09 Asphalt Recycle Agents
07-09 New Requirements for Superpave Gyratory Compactor
06-09 Change in Federal Law Regarding Submission of Certified Payrolls
05-09 FM 1-T 166 Revisions
04-09 Changes to Material IDs for Aggregate Base
03-09 Warm Mix Asphalt
02-09 Clarification Regarding Requirements for Motor Vehicle Registration & Certification
01-09 Specification Change for Coarse Aggregate - Maximum Percent Passing the Minus 200 Sieve

 

Work Orders DCE Memo's 2008
25-08 Specification Change for Section 334 - Superpave Asphalt Concrete
24-08 Specification Change for Architectural Pavers
23-08 Changes to Logging Samples into LIMS
22-08 2008 Hurricane Impacts
21-08 Substitution of Type Q Epoxy for Type F-2 Epoxy in Florida U Beams
20-08 Index No. 860 Aluminum Pedestrian/Bicycle Picket Railing - Picket Weld Connections
19-08 Changes to Index 11200, 11300 & 11860
18-08 Correction to Index 11860
17-08 Revision to Testing Protocol for Section 948, Class II High Density Polyethylene Pipe
16-08 Placement of Detectable Warnings
15-08 Change in Bolting Criteria for Structures Governed by Spec Sections 649 & 700
14-08 Clarification of Use of Compressive Strength Results to Determine Form Removal
13-08 Revision to Specification Section 4 - Scope of the Work
12-08 Idle Asphalt Plants
11-08 Lake Belt Impacts
10-08 Guidelines for Changing the Binder Type in Friction Course Mixtures from Asphalt Rubber to Polymer Modified
09-08 Requirement for Products Listed on the QPL to be Manufactured by a Qualified Producer
08-08 Use of Palm Beach Aggregates in FC-5 Mixtures
07-08 Modified Density & Compaction Requirements for 1" Thick Lifts of SP-9.5 & FC-9.5 Superpave Mixtures
06-08 Qualified Products for Structural Coatings REVISED
05-08 Project Information Sign
04-08 Polymer Laminated Stay-In-Place Metal Bridge Deck Forms
03-08 Substituting Higher Strength Concrete for Lower Strength Concrete & Structural Concrete for Non-Structural Concrete
02-08 Use of Steady Burn Lights on Temporary Traffic Control Devices
01-08 Acceptance Testing for Pavement Smoothness by Laser Profile
(Replaces DCE Memo 14-04)



Web Author:

 

Accessibility | Acronyms | Frequently Asked Questions | Governor's Office | Privacy Policy | Statement of Agency  

Email questions and comments to: 
Public Information Office for General Issues
Web Review Team for Website Issues
Copyright © 1996- Florida Department of Transportation

You might need Word Viewer or Adobe Reader to view file downloads

My Florida logo image  (Opens in New Window)
spacer image