EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

District 5 Construction

Workorders

DCE Memo's 2011

14-11

Field Welding of Temporary Works

13-11

Required Specification Change for Section 916 Bituminous Materials

12-11

Payment of Streamline Contracts Via Electronic Estimates Delivery (EED) and Schedule of Values Submittal Requirements on Future Streamline Lump Sum Contracts

11-11

Use of Continuous Rail Bolsters for Support of Bridge Deck Reinforcing Bars on Stay-In-Place (SIP) Forms

10-11

MSE Wall Design Standards Index 6000 Series

09-11

Unverified Concrete Lots on the Project - Final Materials Certifications

08-11

Standardized Concrete Sample Number/Lot Number System

07-11

Substandard Burlap-Polyethylene Sheeting

06-11

Hurricane Impacts to Construction Projects

05-11

Retained Yellow Color of Pavement Marking Materials

04-11

Specification Change for Section 914 - 2.2 Stabilization Materials

03-11

Loss of Crystal River Power Plant Fly Ash (FA-01)

02-11

OSHA Rule (29 CFR Part 1926) Cranes & Derricks in Construction

01-11

Introduction of the New FDOT Design Standards Index 6000 Series

 

DCE Memo's 2010

19-10

Recent Specification Revision to Article 346-3.3 Mass Concrete

18-10

Substitution of Crown's Section 711 Thermoplastic Base Line

17-10

High Slump Concrete with Lumps and Balls

16-10

Specification Change for Course Aggregate - Reclaimed Portland Cement Concrete

15-10

Qualified Products for Structural Coatings

14-10

Streamline Lump Sum Contracts

13-10

Field Welding

12-10

Specification Change for Section 981 - Turf Materials

11-10

Standardized Concrete Sample Number/Lot Number System

10-10

Maintenance of Traffic for Existing Steel Structures

09-10

Hurricane Impacts to Construction Projects

08-10

Interstate Projects Affecting Business Logo Structures

07-10

Modifications to Section 916 Bituminous Materials

06-10

Implementation of Revised Specification 4-3.9.1 (Existing Projects & Those Let Prior to July 2010)

05-10

Utilization of Embedded Data Collectors (EDC) in All Bridge Projects with Square Prestressed Concrete Pile Foundations

03-10

Installation of Shear Connectors for Steel Beams

02-10

Implementation of Recent Specification 346 Revisions on Existing Projects & Projects Let Prior to July 2010

01-10

Testing of Elastomeric Bearing Pads for Bridge Structures (Addendum to DCE memo 20-09)

 

DCE Memo's 2009

20-09

Testing of Elastomeric Bearing Pads for Bridge Structures

19-09

Implementation of a Mandatory "Critical Structures Construction Issues - Self Study Course"

18-09

Technical Considerations for Flexible Pipe Selection and Substitution

17-09

Correction to SP0060100LS - Specification Workbook 2010

16-09

Hurricane Impacts to Construction Projects

15-09

Correction to Design Standards Index 5205

14-09

Mandatory Utilization of Embedded Data Collectors (EDC) in All Bridge Projects with Square Prestressed Concrete Pile Foundations

13-09

Qualified Products for Materials for Concrete Repair

12-09

Centrifugally Spun Cast Concrete Poles

11-09

Specification Changes for Section 330; Hot Bituminous Mixtures - General Construction Requirements

10-09

Clarification of Specification 455-16.2 & 455-20(d)

09-09

Making Revisions to Contractor Quality Control Plans

08-09

Asphalt Recycle Agents

07-09

New Requirements for Superpave Gyratory Compactor

06-09

Change in Federal Law Regarding Submission of Certified Payrolls

05-09

FM 1-T 166 Revisions

04-09

Changes to Material IDs for Aggregate Base

03-09

Warm Mix Asphalt

02-09

Clarification Regarding Requirements for Motor Vehicle Registration & Certification

01-09

Specification Change for Coarse Aggregate - Maximum Percent Passing the Minus 200 Sieve

 

DCE Memo's 2008

25-08

Specification Change for Section 334 - Superpave Asphalt Concrete

24-08

Specification Change for Architectural Pavers

23-08

Changes to Logging Samples into LIMS

22-08

2008 Hurricane Impacts

21-08

Substitution of Type Q Epoxy for Type F-2 Epoxy in Florida U Beams

20-08

Index No. 860 Aluminum Pedestrian/Bicycle Picket Railing - Picket Weld Connections

19-08

Changes to Index 11200, 11300 & 11860

18-08

Correction to Index 11860

17-08

Revision to Testing Protocol for Section 948, Class II High Density Polyethylene Pipe

16-08

Placement of Detectable Warnings

15-08

Change in Bolting Criteria for Structures Governed by Spec Sections 649 & 700

14-08

Clarification of Use of Compressive Strength Results to Determine Form Removal

13-08

Revision to Specification Section 4 - Scope of the Work

12-08

Idle Asphalt Plants

11-08

Lake Belt Impacts

10-08

Guidelines for Changing the Binder Type in Friction Course Mixtures from Asphalt Rubber to Polymer Modified

09-08

Requirement for Products Listed on the QPL to be Manufactured by a Qualified Producer

08-08

Use of Palm Beach Aggregates in FC-5 Mixtures

07-08

Modified Density & Compaction Requirements for 1" Thick Lifts of SP-9.5 & FC-9.5 Superpave Mixtures

06-08

Qualified Products for Structural Coatings Revised

05-08

Project Information Sign

04-08

Polymer Laminated Stay-In-Place Metal Bridge Deck Forms

03-08

Substituting Higher Strength Concrete for Lower Strength Concrete & Structural Concrete for Non-Structural Concrete

02-08

Use of Steady Burn Lights on Temporary Traffic Control Devices

01-08

Acceptance Testing for Pavement Smoothness by Laser Profile (Replaces DCE Memo 14-04)