Website_41530215201_Complete
Conflict_Category Conflict_Details UAO Work_Description Station Offset UWS_item
Construction 568+49.96 / RR City of PSL Adjust existing WM valve box 568+49.96 36 RT PSL
Construction 557+31 / LR Florida City Gas 2" PE install new 557+31 50-65 LT FCG
Construction 684+60 to 686+20 / LR Florida City Gas 6" PE place out of service 684+60 to 686+20 44-50 LT FCG
Construction 684+60 to 686+20 / LR Florida City Gas 6" PE install new, offset under concrete barrier wall 684+60 to 686+20 44-50 LT FCG
Construction
City of PSL-Engineering Remove communication interconnect

PSL-E
Construction 557+24 / LR Florida City Gas 2" PE place out of service 557+24 50-65 LT FCG
Construction 566+70.38 / RR City of PSL Adjust existing WM valve box 566+70.38 29 RT PSL
Construction 557+24.72 / LR FP&L Raise overhead distribution line 4' above sign elevation 557+24.72 57.93 LT FP&L
Construction 568+83.94 / RR City of PSL Adjust existing WM valve box 568+83.94 32 RT PSL
Construction 576+57.88 / RR City of PSL Adjust existing WM valve box 576+57.88 33 RT PSL
Construction 611+63.31 / LR City of PSL Adjust existing WM valve box 611+63.31 60 LT PSL
Construction 594+72.52 / LR City of PSL Adjust existing WM valve box 594+72.52 71 LT PSL
Construction 602+27.07 / LR City of PSL Adjust existing WM valve box 602+27.07 69 LT PSL
Construction 611+63.31 / LR City of PSL Adjust existing WM valve box 611+63.31 60 LT PSL
Construction
City of PSL-Engineering Install new wireless communication system

PSL-E
Drainage 614+45 to 614+75 / LR Florida City Gas 6" PE install new, offset under S-117 614+45 to 614+75 44 LT FCG
Drainage 614+45 to 614+75 / LR Florida City Gas 6" PE place out of service 614+45 to 614+75 44 LT FCG