Website_41071715201_Pending
Conflict_Category Conflict_Details Deadline UAO Work_Description Station Offset Dependent_upon UWS_item
Construction 385+00.88 / RR
FPUA Gas Main to be Deflected South and Down 385+00.88 53.04 RT Light Pole Removed FPUA
Construction 392+34.91
AT&T Possible Adjust Buried Terminal or to Remain 392+34.91
Adjustment by AT&T Contractor AT&T
Construction 375+10
Florida Gas Transmission Place Deep Well Out of Service on SR91 (Turnpike) 375+10
N/A FLGT
Construction 375+50
Florida Gas Transmission Remove Rectifier/Pole for Cath. Protection System on SR91 375+50
N/A FLGT
Construction 386+78.78 / RR
FPUA FPUA Supervise Installation of GM Sleeve 386+78.78 1.2 RT 48 Hour Advance Notice to FPUA FPUA
Construction 393+13.72
AT&T Possible Adjust Buried Cable or to Remain 393+13.72
Adjustment by AT&T Contractor AT&T
Construction 390+10 / RR
Comcast TV Cable Detached from Old Pole and Placed on New Pole 390+10 75 RT Installation of New Pole by FPUA Comcast
Construction 386+66.62 to 386+66.64 / LR
FPUA Lower 2" & 4" Gas Main (MOT by others) 386+66.62 to 386+66.64 101.55 to 101.56 LT Notify FPUA 2 Weeks Prior to Cut Ditch Bot FPUA
Construction 393+10
AT&T Possible Adjust Buried Terminal or to Remain 393+10
Adjustment by AT&T Contractor AT&T
Construction 386+85.83 / RR
FPUA Adjust Gas Valve to Final Grade 386+85.83 55.88 RT FDOT Contr. Notify When Final Grade Est. FPUA
Construction 393+48. / LR
FPUA Adjust Gas Valve to Final Grade 393+48.58 118.13 LT FDOT Contr. Notify When Final Grade Est. FPUA
Construction 386+60.27 / LR
FPUA Adjust Gas Vent to Final Grade 386+60.27 115.9 LT FDOT Contr. Notify When Final Grade Est. FPUA
Construction 372+19.85 / LR
FPUA Adjust Fire Hydrant to Proposed Surface 372+19.85 52.18 LT FDOT Contractor Final Grade FPUA
Construction 389+97.51 / RR
FPUA Adjust Gas Valve to Final Grade 389+97.51 77.01 RT FDOT Contr. Notify When Final Grade Est. FPUA
Construction 383+19.07 / RR
FPUA Supervise Installation of S-22 383+19.07 54.58 RT 48 Hour Notification FPUA
Construction 393+40.13 / LR
FPUA Adjust Gas Valve to Final Grade 393+40.13 114.58 LT FDOT Contr. Notify When Final Grade Est. FPUA
Construction 393+07.75 / RR
FPUA Adjust Gas Valve to Final Grade 393+07.75 67.64 RT FDOT Contr. Notify When Final Grade Est. FPUA
Construction 390+07.75 / RR
FPUA Deflect WM to 18" Below New SD 390+55.05 38.79 RT FDOT Contr. Open Hole for 18" SD FPUA
Construction 387+38.13 / RR
FPUA Adjust Fire Hydrant and GV to Final Grade 387+38.13 65.50 RT FDOT Contr. Notify When Final Grade Est. FPUA
Construction 387+14.87 / RR
FPUA Deflect WM to 18" Below New SD 387+14.87 38.19 RT FDOT Contr. Open Hole for 18" SD FPUA
Construction 382.30.56 / LR
FPUA Deflect WM to 18" below new French Drain (MOT by others) 382+30.56 14.31 LT FDOT Contr. Open French Drain Hole FPUA
Swale 389+24.56
AT&T Possible Adjust Buried Duct Run or to Remain 389+24.56
Adjustment by AT&T Contractor AT&T
Swale 385+12.91
AT&T Possible Adjust Buried Fiber & Duct or to Remain 385+12.91
Adjustment by AT&T Contractor AT&T
Swale 387+01.64
AT&T Possible Adjust (12) 4" Ducts or to Remain 387+01.64
Adjustment by AT&T Contractor AT&T
Swale 387+02.75
AT&T Possible Adjust Buried Cable or to Remain 387+02.75
Adjustment by AT&T Contractor AT&T
Swale 388+37.61
AT&T Possible Adjust Buried Duct Run or to Remain 388+37.61
Adjustment by AT&T Contractor AT&T
Swale 388+60.42
AT&T Possible Adjust Buried Duct Run or to Remain 388+60.42
Adjustment by AT&T Contractor AT&T
Swale 389+24.56
AT&T Possible Adjust Buried Duct Run or to Remain 389+24.56
Adjustment by AT&T Contractor AT&T
Swale 389+99.06
AT&T Possible Adjust Buried Duct Run or to Remain 389+99.06
Adjustment by AT&T Contractor AT&T
Swale 390+08.90
AT&T Possible Adjust Buried Duct Run or to Remain 390+08.90
Adjustment by AT&T Contractor AT&T
Swale 390+13.96
AT&T Possible Adjust Buried Duct Run or to Remain 390+13.96
Adjustment by AT&T Contractor AT&T
Swale 390+37.35
AT&T Possible Adjust Buried Duct Run or to Remain 390+37.35
Adjustment by AT&T Contractor AT&T
Swale 392+10.96
AT&T Possible Adjust Buried Duct Run or to Remain 392+10.96
Adjustment by AT&T Contractor AT&T
Swale 392+27.63
AT&T Possible Adjust Buried Duct Run or to Remain 392+27.63
Adjustment by AT&T Contractor AT&T
Swale 393+11.06
AT&T Possible Adjust Buried Duct Run or to Remain 393+11.06
Adjustment by AT&T Contractor AT&T
Swale 393+11.06
AT&T Possible Adjust Buried Duct Run or to Remain 393+11.06
Adjustment by AT&T Contractor AT&T