Website_41071715201_Complete
Conflict_Category Conflict_Details UAO Work_Description Station Offset UWS_item
Construction 383+77.85 FPUA Electric Remove Pole & Light 383+77.85
FPUA-E
Construction 377+40 to 377+40.05 / RR AT&T Relocate Hand Hole 377+40 to 377+40.05 75 to 80 RT AT&T
Construction 383+75.30 AT&T Retire Buried Crossing 383+75.30 62 LT to 60 RT AT&T
Construction 378+65 AT&T Directional Bore (2) 4" PVC, Pull Cable and Splice 378+65 Varies AT&T
Construction 383+08.19 AT&T Remove Pole and Terminal 383+08.19
AT&T
Construction 385+95 AT&T Directional Bore (2) 4" PVC, Pull Cable and Splice 385+95 R/W RT to R/W LT AT&T
Construction 383+08.19 / RR AT&T Place Cable and Buried Terminal 383+08.19 70 RT AT&T
Construction 383+75.30 AT&T Remove/Retire Buried Cable 383+75.30
AT&T
Construction 375+08.06 / RR LR AT&T Relocate Anchors and Guys 375+08.06 85 RT to 94 LT AT&T
Construction 386+07.47 AT&T Retire Buried Crossing 386+07.47
AT&T
Construction 383+10 to 383+97 FPUA Electric Install 2" Conduit at 30" Cover 383+10 to 383+97
FPUA-E
Construction 383+97 FPUA Electric Install Pole and Light 383+97
FPUA-E
Construction 388+09.16 FPUA Electric Remove Pole/Down Guy w/ Anchor & OH Wire - Need Easement 388+09.16
FPUA-E
Construction 388+43.61 FPUA Electric Remove Pole/Down Guy w/ Anchor & OH Wire - Need Easement 388+43.61
FPUA-E
Construction 390+10.01 FPUA Electric Remove Pole/Down Guy w/ Anchor & OH Wire - Need Easement 390+10.01
FPUA-E
Construction 389+75 FPUA Electric Install 6" Directional Bore at 60" Cover - Need Easement 389+75
FPUA-E
Construction 388+08 and 390+10 FPUA Electric Install Poles/Pad Transf/Conduits/UG Cable- Need Easement 388+08 and 390+10
FPUA-E
Construction 379+60.84 / RR FPUA Relocate Backflow Preventer 379+60.84 60.77 RT FPUA
Construction 387+01.53 to 393+00 / RR FPUA Adjust Gas Main 387+01.53 to 393+00 71.3 RT FPUA
Construction 383+86 AT&T Directional Bore (2) 4" PVC, Pull Cable and Splice 383+86 R/W RT to R/W LT AT&T