Website_23026235201_Complete
Conflict_Category Conflict_Details UAO Work_Description Station Offset UWS_item
Construction 515+27.22 FP&L Directional Bore SR 70 515+27.22
FP&L
Construction 549+27.22 to 562+12.68 FP&L Relocate Existing O/H Electric 549+27.22 to 562+12.68
FP&L
Construction 590+13.89 to 615+09.46 FP&L Relocate Existing O/H Electric 590+13.89 to 615+09.46
FP&L
Construction 615+09.46 to 627+51.18 FP&L Relocate Existing O/H Electric 615+09.46 to 627+51.18
FP&L
Construction 627+51.18 FP&L Directional Bore SR 70 627+51.18
FP&L
Construction 615+09.46 FP&L Directional Bore Along East Side Summerlin Road 615+09.46
FP&L
Construction 590+13.89 FP&L Directional Bore SR 70 590+13.89
FP&L
Construction 392+27.23 to 437+17.23 FP&L Relocate Existing O/H Electric 392+27.23 to 437+17.23
FP&L
Construction 435+17.23 FP&L Directional Bore SR 70 435+17.23
FP&L
Construction 437+07.23 to 461+27.23 FP&L Relocate Existing O/H Electric 437+07.23 to 461+27.23
FP&L
Construction 437+17.23 to 513+27.22 FP&L Relocate Existing O/H Electric 437+17.23 to 513+27.22
FP&L
Construction 562+12.68 to 590+13.89 FP&L Relocate Existing O/H Electric 562+12.68 to 590+13.89
FP&L
Construction 513+27.22 to 549+27.22 FP&L Relocate Existing O/H Electric 513+27.22 to 549+27.22
FP&L
Construction 627+27 to 638+05 / RR AT&T Transfer Aerial Cable to New Pole 627+27 to 638+05 (from CL) 122 to 144 RT AT&T
Construction 431+88 / LR & RR AT&T Remove Aerial Cable 431+88 (from CL) 250 LT to 125 RT AT&T
Construction 431+00 / LR & RR AT&T Direct Bore 2 - 4" PVC; Pull Splice Cable 431+00 (from BL) 250 LT to 125 RT AT&T
Construction 431+88 to 460+40 / LR AT&T Remove Aerial Cable 431+88 to 460+40 (from CL) 168 to 176 LT AT&T
Construction 431+98 to 460+40 / RR AT&T Place Aerial Fiber/Copper Cables on FPL Poles 431+98 to 460+40 (from CL) 120 to 145 RT AT&T
Construction 459+00 / LR & RR AT&T Direct Bore 2 - 4" PVC; Pull Splice Cable 459+00 (from BL) 258 LT to 114 RT AT&T
Construction 460+16 / LR & RR AT&T Remove Aerial Cable 460+16 (from CL) 258 LT to 30 RT AT&T
Construction 460+16 to 539+55 / RR AT&T Remove Aerial Cable 460+16 to 539+55 (from CL) 30 to 32 RT AT&T
Construction 430+00 to 615+00 AT&T Place 33 Poles 430+00 to 615+00 (from CL)
AT&T
Construction 460+16 to 539+55 / RR AT&T Remove 33 Poles 460+16 to 539+55 (from CL) 30 to 32 RT AT&T
Construction 538+55 to 614+00 / RR AT&T Retire Buried Cable 538+55 to 614+00 (from BL) 106 to 136 RT AT&T
Construction 614+05 to 627+56 / RR AT&T Remove Aerial Cable 614+05 to 627+56 (from CL) 106 to 136 RT AT&T
Construction 461+27.23 FP&L Directional Bore SR 70 461+27.23
FP&L