Website_FPUA_Bo_Hutchinson_Unknown
Deadline Phase_of_construction Project Work_Description Station Offset Permit UWS_item

During 410717-1-52-01 FPUA Supervise Installation of GM Sleeve 386+78.78 1.2 RT
FPUA

During 410717-1-52-01 Adjust Gas Vent to Final Grade 386+60.27 115.9 LT
FPUA

During PH 2 410717-1-52-01 Deflect WM to 18" below new French Drain (MOT by others) 382+30.56 14.31 LT
FPUA

During 410717-1-52-01 Adjust Gas Valve to Final Grade 389+97.51 77.01 RT
FPUA

During 410717-1-52-01 Adjust Gas Valve to Final Grade 393+48.58 118.13 LT
FPUA

During 410717-1-52-01 Adjust Gas Valve to Final Grade 393+40.13 114.58 LT
FPUA

During 410717-1-52-01 Adjust Gas Valve to Final Grade 393+07.75 67.64 RT
FPUA

During 410717-1-52-01 Deflect WM to 18" Below New SD 390+55.05 38.79 RT
FPUA

During 410717-1-52-01 Adjust Fire Hydrant and GV to Final Grade 387+38.13 65.50 RT
FPUA

During 410717-1-52-01 Deflect WM to 18" Below New SD 387+14.87 38.19 RT
FPUA

During 410717-1-52-01 Supervise Installation of S-22 383+19.07 54.58 RT
FPUA

During 410717-1-52-01 Adjust Gas Valve to Final Grade 386+85.83 55.88 RT
FPUA

During PH 1-C 410717-1-52-01 Gas Main to be Deflected South and Down 385+00.88 53.04 RT
FPUA

During 410717-1-52-01 Lower 2" & 4" Gas Main (MOT by others) 386+66.62 to 386+66.64 101.55 to 101.56 LT
FPUA

During 410717-1-52-01 Adjust Fire Hydrant to Proposed Surface 372+19.85 52.18 LT
FPUA