Construction
| Topics | File Type | Dates | |
| Guidelines | |||
| Checklist for FHWA Oversight Record Requirements | MS Word File, 31kb | April 2003 | |
| Design-Build Guidelines | PDF File, 841kb | Revised 8/8/12 | |
| Design-Build Pre-Scoping Questions | PDF File, 95kb | Updated 7/2/13 | |
| These pre-scoping questions are intended to supplement the Design-Build Guidelines so as to assist in developing project specific Design and Construction Criteria Packages. While many of the issues raised by the pre-scoping questions may not apply to all projects, this document can serve as a guide in scoping the necessary site surveys and in defining project constraints when developing the Design and Construction Criteria package. | |||
| Design-Build Meeting Status Guidance | |||
| FHWA SEP-14 Approval Letter | PDF File, 710kb | ||
| Project Selection Guidelines | MS Word File, 22.5kb | ||
| Contract Time Points Table Tool | Excel File, 19kb | ||
| Procedures | |||
|
Procurement and Administration Procedure (No. 625-020-010k) |
PDF File, 176kb | ||
|
Design-Build Conflict of Interest Directive -
(No.375-030-006a) (Restriction on Consultants' Eligibility to Compete for Department Contracts) |
|||
| Rules | |||
|
Rule,
Chapter 14-91, FAC
(D.O.T. Infonet link, can only be viewed by D.O.T. employees) |
|||
|
Rule,
Chapter 14-91, FAC
(This link will take you outside of the FDOT Website) |
|||