EMERGENCY INFORMATION - To be displayed on a situational basis. Hidden otherwise. Due to weather conditions, the Florida Highway Patrol has closed the Sunshine Skyway Bridge. More…

Construction

The FDOT Chief Engineer must approve any Low Bid Design-Build projects.

After obtaining Chief Engineer approval to utilize Low Bid Design-Build, send an email to alan.autry@dot.state.fl.us requesting the Low Bid Design-Build Boilerplate RFP.