Dist |
FIN
# |
Contract |
Subject |
A/R/P |
| 1 |
19770145201 |
T1393 |
SR 559 (over CSX RR) - Differing Subsurface Conditions for End Bent 4,
Shaft No. 1 |
A |
| 1 |
42240315201 |
T1341 |
SR70 - Time Extension Due to Shortage of Thermoplastic Material |
A |
| 1 |
19770615201 |
T1328 |
SR 25/US 27 - Recovery of Idle Equipment & Mobilization Costs |
R |
| 1 |
19786225201 |
T1317 |
SR 758 (Bridge Over Grand Canal) - Repairs to Existing Timber Pedestrian
Walkway |
A |
| 1 |
41764625201 |
T1256 |
CR 664A -
Bridge Repair (Bridge # 060017, #060031) |
A |
| 1 |
40818525201 |
T1242 |
SR 64
(Anna Maria Bridge) - Additional Compensation for Hopkins Frames &
Structural Steel |
A |
| 1 |
41556915201 |
T1173 |
SR 72 - Additional Compensation for Temporary Concrete Barrier Wall |
R |
| 1 |
20096615201 |
T1108 |
I-75 & Alico Rd. Interchange-Water Use Permit Responsibility |
R |
| 1 |
19612115201 |
T1089 |
SR 70 - Payment for
Intersection Work |
A |
| 1 |
19575625201 |
T1082 |
SR 78 - Additional
Compensation & Time |
R |
| 1 |
1957051-5201 |
T1078 |
SR 78 Repair work required due to design errors, express and
constructive changes and over-inspection of Contractors work. Request
for a contract time extension and damages due to delays suffered as a
result of the issues over the storm sewer pipe
(Original DRB Recommendation) |
NA |
|
|
|
Owner (FDOT) Request for Clarification (for above issue) |
NA |
|
|
|
DRB
Response to Owner (FDOT) Request for Clarification (for above issue)
|
NA |
|
|
|
Owner (FDOT) 2nd Request for Clarification (for above
issue) |
NA |
|
|
|
SR 78 Repair work required due to design errors, express and
constructive changes and over-inspection of Contractors work. Request
for a contract time extension and damages due to delays suffered as a
result of the issues over the storm sewer pipe
REVISED DRB Recommendation (for above issue) |
P |
| 1 |
1957051-5201 |
T1078 |
SR 78 - Laser
Profiling & Damage to Drain Pipes |
A |
| 1 |
1976791-5201 |
T1064 |
SR 25 (US 27)
- Asphalt Price Adjustment |
A |
| 1 |
4038901-5201 |
T1027 |
US 27
Delays and Extra Work |
P |
| 1 |
4038901-5201 |
T1027 |
US 27
Extra Depth Asphalt |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) - Additional Reimbursement for Extended Survey Control |
R |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) - Entitlement to Recovery of Liquidated Damages |
R |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) - Entitlement Due to General Disruption Costs |
A |
| 1 |
19573715201 |
T1022 |
US 41 (SR 45) - Entitlement to Acceleration & Progress/bonus Payments |
P |
| |
|
|
DRB Response to FDOT Request for Clarification
(for above issue) |
NA |
| |
|
|
DRB Response to FDOT Second Request for Clarification
(for above issue) |
NA |
| 1 |
19573715201 |
T1022 |
US
41 (SR 45) - Entitlement to Extended Quality Control Costs |
A |
| 1 |
19573715201 |
T1022 |
US 41 (SR 45) - Differing Site Conditions for Existing Water & Sanitary
Sewer Force Mains |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) - Additional Cost for Using Asphalt Base in Lieu of
Limerock |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) - Escalation of Asphalt Aggregate Cost |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Extended Sidewalk to Pedestrian Light |
NA |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) -
Additional Entitlement for Replacement of Light Pole |
R |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Additional Entitlement for Change to Fiber Optic Cable |
R |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) -
Changes to Luminaries
Clarification of Issues |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41)
- Truncated Domes Issue (Detectable Warnings on Walking Surfaces) |
R |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Bay Commons Drive Issue |
A |
| 1 |
19573715201 |
T1022 |
SR 45
(US 41) - Modification of Bridge Pedestrian Lights |
A |
| 1 |
19573715201 |
T1022 |
SR 45
(US 41) - Grouting at Spring Creek Bridge |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) - Utility
Conflict at S-533 |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - WO 14, Modify S-128 Impacts |
R |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) -
Modification of Riser at S-291 |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Water Use Permit Delay |
R |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Adjustment of S-536A Structure |
R |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - RCS/BSU Conflict at Station 125+62 Rt. Rdwy |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Sprint Conflict Station 128+00 Rt. Rdwy |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) -
Force Main Conflict at Station 125+50 Rt |
A |
| 1 |
19573715201 |
T1022 |
SR 45
(US 41) - Gas Main Conflict at Station 117+75 RT |
A |
| 1 |
19573715201 |
T1022 |
SR 45
(US 41) - Sprint Delay at S-542 |
A |
| 1 |
19573715201 |
T1022 |
SR 45
(US 41) - Differing Site Conditions Station 125 to 128 |
P |
| 1 |
19573715201 |
T1022 |
SR 45
(US 41) - Gas Main Conflict |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Temporary Sheet Pile |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Removal/Replacement of Bridge Deck on Imperial River Bridge |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US 41) -
Stop Work Order Due to Gas Main Issue |
A |
| 1 |
19573715201 |
T1022 |
SR 45 (US
41) - Coast Guard Permit Issue |
P |
| 1 |
1954061-5201 |
T1012 |
US 41 (SR 45)
Installation of Storm Drainage System |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 -
Unforeseen Work at Bill's Muffler Shop |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 - Unforeseen
Work at Truncated Domes |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 - Debris
Removal at Pond 400B |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 -
Pavement Marking Removal |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 - Driveway
at English Chevrolet |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 - Fence
Repairs at Ponds 400B and 500 |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 - Additional
Work for MES, Weir S-6 & Rubble Slope at Townsend |
R |
| 1 |
1940931-5201 |
T1009 |
US 17 -
Additional Work at Stenstrom Road |
R |
| 1 |
1940931-5201 |
T1009 |
US 17 - Additional
Work for Removal of Grass & Weeds |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 - Additional
Unforeseen Work for Pond 800 Driveway |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 - Additional Unforeseen
Work for Mowing |
A |
| 1 |
1940931-5201 |
T1009 |
US 17 -
Compensable Days for Pipe Repair & Use of Laser Video |
P |
| 1 |
1940931-5201 |
T1009 |
US 17 - Unforeseen Work at
KOA |
R |
| 1 |
1940931-5201 |
T1009 |
US 17 - Repair
Driveways & Sidewalks, Additional Compensation |
R |
| 1 |
1940931-5201 |
T1009 |
US 17 - Compensable
Days for Arch Culvert Work |
R |
| 1 |
4206131-5201 |
E1G79 |
I-75 at Fruitville Rd. - Design & Reconstruction of Roadway Lighting
Power Distribution |
R |
| 1 |
4161191-5201 |
E1G60 |
Manatee County ATMS - Video Wall Damage |
A |
| 1 |
4161191-5201 |
E1G60 |
Manatee County ATMS - Hub #2 and Signal Equipment Damage |
A |
| 1 |
4161191-5201 |
E1G60 |
Manatee County ATMS - Delay in Test Plan Review |
A |
| 1 |
41981115201 |
E1F89 |
SR 31 (Arcadia Rd.) & SR 78 (Bayshore Rd.) Special Design Mast Arm:
Drilled Shaft Issues |
A |
| 1 |
1980876-5201 |
E1F66 |
SR 700 (Bridge
# 130057) - Replace Existing Fender System |
P |
| 1 |
4128481-5201 |
E1F04 |
Compensation
for Drainage Improvements |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75
RTMC & ITS Project - Delay Due to Additional Fire Inspections |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75
RTMC & ITS Project - Change to Power Drop from Overhead to Underground |
P |
| 1 |
4147331-5201 |
E1E73 |
I-75
RTMC & ITS Project - Additional Time & Compensation to Replace Rejected
Pull Boxes |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75
RTMC & ITS Project - Drainage Problems at RTMC Building Site |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Project - Damage to CCTV Cabinets (#31 & #34) |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project -
Time Extension & Compensation for Damage Caused by Failure to
Retrofit Beacon #134 |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project -
Time Extension & Compensation for Damage to Fiber Optic Cabling |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project -
Additional Time for Extra Work Assigned Under Unilateral SA # 14 |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project -
Additional Time & Compensation for Mitigation of Acoustical Problems in
the Control Room |
P |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project - Furnish Test Equipment for
Multi-Mode Fiber |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project - Additional Time & Compensation for
Damage to Fiber Optic Line |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project - Entitlement Due to RTMC Building
Size Larger than Required by RFP |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project - Added Time & Compensation; Sign
Support Manufacturer Going Out of Business |
A |
| |
|
|
Contractor Request for Reconsideration (For Decision Above) |
|
| |
|
|
DRB Response to Request for Reconsideration (For Decision Above) |
|
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project, Supplemental Agreement Calculation |
R |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & ITS Integration Project, Fishel Sod Issue |
R |
| 1 |
4147331-5201 |
E1E73 |
I-75
FMS & ITS Integration Project, Extended Cable TV Service |
R |
| 1 |
4147331-5201 |
E1E73 |
I-75 Water Heaters |
Reconsideration Request |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 Escalation
Costs |
Reconsideration Request |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75
Collier County ITS - Connection Fee Compensation |
A |
| 1 |
4147331-5201 |
E1E73 |
I-75 RTMC & I-75 Corridor FMS & ITS Integration Project -
Substantial Completion |
R |
| 1 |
1953761-5201 |
E1443 |
US 41 (SR 45)
Installation of Storm Drainage System |
A |
|
1 |
1970271-5201 |
21690 |
Emergency Sewer Repair |
A |
| 1 |
1973951-5201 |
21580 |
SR 60
Utilities Impact |
A |
| 1 |
1973951-5201 |
21580 |
SR60A (Fuel Adjustments) |
A |
| 1 |
1973951-5201 |
21580 |
State Road 60 Sod
Payment |
A |
| 1 |
1971681-5201 |
21541 |
SR60A (MSE Sidewalk Payment) |
A |
| 1 |
2012131-5201 |
21403 |
I-4/US98 Interchange High Mast Lighting |
A |
|
1 |
2012131-5201 |
21403 |
I-4/US 98 Interchange-Glare
Screen Payment |
A |
|
1 |
2012131-5201 |
21403 |
I-4/US98 Interchange - Concrete Pavement Grinding |
A |
|
1 |
2012131-5201 |
21403 |
I-4/US98
Interchange - Limerock Base Failure (Ramp A) |
A |
|
1 |
2012131-5201 |
21403 |
I-4/US98 Interchange - Temporary Pavement Failure
(WB Detour) |
A |
|
1 |
1940081-5201 |
21318 |
SR-78(Dike Rd to Okeechobee Co) Additional Time
|
A |
| 1 |
1980051-5201 |
20934 |
Temporary Signal Payment |
A |
|
1 |
1980051-5201 |
20934 |
SR45 Discharge of
Superintendent |
R |
| 1 |
1937941-5201 |
20757 |
SR-776,
Pay for Restrained Pipe |
A |
|
1 |
1937941-5201 |
20757 |
SR-776(CR-771 to Riverwood) Weed removal compensation |
R |
| 1 |
1975291-5201 |
20496 |
US
17 - Golden Eagle - Contract Time Issue |
A |
| 1 |
1953201-5201 |
20228 |
Changed
Site Conditions - Utilities |
A |
| 1 |
1953201-5201 |
20228 |
Site
Conditions |
A |
| 1 |
1953201-5201 |
20228 |
Indirect
Costs |
A |
| 1 |
1953201-5201 |
20228 |
Utility
Conflict |
A |
| Dist |
FIN
# |
Contract
|
Subject |
A/R |
|
2 |
20965015201 |
T2319 |
SR 10A (Arlington Expressway) - Installation of Fiber Optics Locate Wire |
A |
|
2 |
42633315201 |
T2284 |
SR 111 (Edgewood Avenue) - Installation of Fiber Optics Locate Wire |
A |
|
2 |
20797325201 |
T2207 |
SR 18 & SR 235
- Cross Slope Corrections in All Curve Sections |
A |
|
2 |
20965955201 |
T2196 |
SR 23 - Sandbag Payment Quantification |
A |
|
2 |
21037625201 |
T2178 |
SR 55 - Removal of Concrete from Existing Manhole & Storm Sewer;
Occurred During Drilled Shaft Installation |
A |
|
2 |
21037625201 |
T2178 |
SR 55 - Excavation Required to meet Plan Template;
Maintenance/Restoration of Turf on Re-Worked Shoulder |
A |
|
2 |
21037625201 |
T2178 |
SR 55 -
Contractor's Quality Control Plan Rejection |
A |
|
2 |
21324515201 |
T2117 |
SR 9/I 95 - Multiple
Issues |
A |
|
2 |
20996915201 |
T2097 |
SR 20
Widening Project, Interlachen to Hollister, Unforeseen Drainage Work |
A |
|
2 |
20969225201 |
T2082 |
SR
134 - Contract Time Issues, Liquidated Damages |
A |
|
2 |
21308415201 |
T2061 |
I-75(from US90 to I-10) Weather Delay Time Extension |
A |
|
2 |
21335155201 |
T2013 |
SR 9A -
Pile Underruns & Bridge Deck Removal |
A |
|
2 |
21068735201 |
E2N36 |
SR 200 (A1A) - Differing Site Condition Concerning Muck Removal &
Subsurface Clay |
A |
|
2 |
20769915201 |
E2H07 |
SR 26 Critical End
Dates |
A |
|
2 |
21325125201 |
E2G91 |
I-295 -
Additional Compensation for Removal of Asphalt |
A |
|
2 |
20778515201 |
E2G52 |
SR 329 - Limerock Base Compaction Method |
A |
|
2 |
20778515201 |
E2G52 |
SR 329 - Traffic Control Plan; Installation of Temporary Barrier Wall |
A |
|
2 |
21350215201 |
E2F20 |
I-95: Flagler Co line to S. of SR 207, St Johns Co |
A |
|
2 |
20960015201 |
21349 |
Noise Ordinance |
A |
| 2 |
21022315201 |
21232 |
Issue No 1 - Gravity Wall |
A |
| 2 |
20978615201 |
20898 |
SR 49/US 129 -
Additional
Compensation/Yielding Subgrade |
A |
| 2 |
20926115201 |
20697 |
Unresolved
Claim Issues - The Milestone Co. |
A |
| 2 |
21343315201 |
20459 |
Bad
Control Point |
A |
| 2 |
20926915201 |
19550 |
Claim
Issue - Leaking Joints RCP |
A |
| Dist |
FIN
# |
Contract
|
Subject |
A/R |
|
3 |
22041265201 |
T3311 |
SR 281 (Avalon Blvd.) - Erosion Control/Drainage System Issues |
A |
|
3 |
42163515201 |
T3294 |
SR
61 (US 27) - Extra Work Placing Asphalt in Gutter (Quantum Ruling) |
A |
|
3 |
40716715201 |
T3089 |
SR 79 (Holmes Creek Bridge) - Damaged Piles, Utility Conduit, Shaft Wall
Collapse (6 issues) |
A |
|
3 |
22044255201 |
T3043 |
SR
87 - Time Extension for Gas Main Relocation |
|
|
3 |
22044255201 |
T3043 |
SR
87 - Additional Contract Days Due to Impact of Hurricane Katrina |
|
|
3 |
42016115201 |
E3G67 |
SR 8/I-10; Cleaning & Painting Steel Columns & Partial Pile Jacket
Removal
(Bridge #s 550050 & 550089) |
A |
|
3 |
41747425201 |
E3E19 |
Design-Build Bridge Replacement I-10; Grinding & Grooving of Bridge
Decks (Determine Quantum) |
A |
|
3 |
41747425201 |
E3E19 |
Design-Build Bridge Replacement I-10; Grinding & Grooving of Bridge
Decks in Regards to Contract Provision 5-12.3 |
A |
|
3 |
41747425201 |
E3E19 |
Design-Build Bridge Replacement I-10; Grinding & Grooving of Bridge
Decks |
|
|
3 |
41747425201 |
E3E19 |
SR 8/I-10, Bridge Replacement - Compensation for Temporary Barrier Wall |
A |
|
3 |
40621415201 |
E3A03 |
Hathaway Bridge -
Award of Excusable Delays |
R |
| 3 |
22276615201 |
E3720 |
Changed
Site Conditions |
|
| 3 |
22276615201 |
E3720 |
Pile
Length Payment |
|
|
3 |
22040215201 |
21556 |
SR 87 - Placement of Guardrail Pedestrian Safety Treatment Pipe Rail |
|
|
3 |
22040215201 |
21556 |
SR 87
- Impacts and Delay Damages due to Utility Relocation |
|
|
3 |
22064215201 |
20944 |
Mack
Bayou Wetland Delay Claim |
R |
|
3 |
21980415201 |
20943 |
Claim Package
Submitted by SANDCO, Inc. |
A |
| 3 |
21978215201 |
20159 |
Utility
Conflict |
A |
| 3 |
21978215201 |
20159 |
No
Documentation of Damage |
A |
| 3 |
21993915201 |
19197 |
Payment
for Repair of Expansion Joints |
|
| Dist |
FIN
# |
Contract
|
Subject |
A/R |
|
4 |
4138421-5201 |
T4196 |
SR 25/ US 27 (from Hendry C/L to Milepost 12.533) Payment for Third
Party Damages |
R |
|
4 |
4068701-5201 |
T4190 |
SR 9 (I-95) Payment for Guardrails Damaged by Third Parties |
R |
|
4 |
4068701-5201 |
T4190 |
SR 9 (I-95)
Phase II Temporary Barrier Wall - Relocation Compensation |
A |
|
4 |
4068701-5201 |
T4190 |
SR 9 (I-95) Auger Cast Pile Quantities Issue |
A |
|
4 |
4114321-5201 |
T4167 |
SR
A!A - Additional Compensation for construction of 9" asphalt base &
correction of surface defects in the structural asphalt |
A |
|
4 |
2302961-5201 |
T4131 |
SR
A1A - Markup on First Tier Subcontractor (Allowable Costs for Extra
Work) |
R |
|
4 |
4114351-5201 |
T4099 |
SR 714 - Negative Adjustments & Compensation for Embankment Quantity |
R |
|
4 |
2302882-5201 |
T4088 |
SR 5,
Compensation for Wing Wall Repair at Saeger Box Culvert |
A |
|
4 |
2302882-5201 |
T4088 |
SR 5, Noise Ordinance
Suspension & Differing Site Condition at Pond 23 West |
A |
|
4 |
2302624-5201 |
T4080 |
SR 70 - Additional Compensation for Added Structural Asphalt Work |
R |
|
4 |
2302624-5201 |
T4080 |
SR 70 -
Concrete Removal after Hydrodemolition |
A |
|
4 |
2396852-5201 |
T4078 |
SR
60 - MSE Wall No. 1 and Mass Concrete Delay
(from Yeehaw Junction to East of Indian River County Line) |
A |
|
4 |
2317371-5201 |
T4074 |
SR 9/I-95 (from Sample Rd. to Palm Beach C/L) Value Added Asphalt
Pavement, Specification 338 |
A |
|
4 |
2319181-5201 |
T4039 |
I-95 (SR 9) Added Time/Compensation for Ramp 2B-1 Special Shoulder
Profile |
A |
|
4 |
2319181-5201 |
T4039 |
I-95 (SR 9) Additional Compensation for Deck Grooving Quantity Change |
A |
|
4 |
2319181-5201 |
T4039 |
I-95 (SR 9) Additional Time/Compensation for Outside Lane Cross Slope |
A |
|
4 |
2319181-5201 |
T4039 |
I-95 (SR 9) Intent to Claim for Weather Days after Expiration of
Contract Time |
A |
|
4 |
2319193-5201 |
T4032 |
I-95 (SR 9) Compensation for Adjustments to Reinforced Erath Retaining
Wall |
A |
|
4 |
2319193-5201 |
T4032 |
I-95 (SR 9) Reconstruction from North of SR-80; Payment of Temporary
Traffic Signals |
A |
|
4 |
2319193-5201 |
T4032 |
I-95
(SR 9) N of SR80 to N of PBL Blvd
(compensation of FHP officers) |
R |
|
4 |
2319182-5201 |
T4016 |
I-95 (SR 9) Compensation for Repairs to Temp. Impact Attenuators |
A |
|
4 |
2319182-5201 |
T4016 |
I-95 (SR 9) Payment & Time for Hurricane Wilma and Tropical Storm Gamma |
A |
|
4 |
2319182-5201 |
T4016 |
I-95 (SR 9) Reconstruction -
Payment of FHP Officers During Lane Closures |
R |
|
4 |
2297971-5201 |
T4011 |
SR
80 - Additional Compensation due to Changed Sign Structure Pay Items |
R |
|
4 |
2295872-5201 |
T4008 |
SR 809 (Military
Trail) - Extension of Existing Box Culverts |
A |
|
4 |
2285981-5201 |
T4003 |
SR 60 - Coquina Rock Shortage (Rebuttal Paper) |
R |
|
4 |
2285981-5201 |
T4003 |
SR 60 (Osceola Blvd) Entitlement for Aggregate for Asphalt, Natures
Keepers claim, Coquina Rock Shortage |
A |
|
4 |
2285981-5201 |
T4003 |
Indian River - State Road 60
Corridor |
A |
| 4 |
2319371-5201 |
21586 |
SR-9/I-95
Payment for Damages to Temp. Traffic Attenuators |
A |
| 4 |
2285961-5201 |
21457 |
SR 60
(Osceola Blvd) - Added Time for Caracara Bird Suspension, Extra Work
Asphalt Rutting & Mitered End Sections |
R |
| 4 |
2285961-5201 |
21457 |
SR 60
(Osceola Blvd) - Increase Cost of Coquina Rock for Sub-base |
A |
| 4 |
2285961-5201 |
21457 |
SR 60
(Indian River County) Unsuitable Material & Shortage of Base Material |
P |
|
4 |
2297771-5201 |
21446 |
Regular Excavation Quantity |
A |
| 4 |
2318781-5201 |
20788 |
Over Excavation of Material in the Flood Plain Compensation Area |
A |
| 4 |
2288211-5201 |
20171 |
Payment
for Allocated Overhead |
A |
| 4 |
2280711-5201 |
20168 |
Obligation
to Timely Identify Sole Source Specification |
A |
| 4 |
2278741-5201 |
19871 |
Discrepancy
in Plans |
A |
| 4 |
2278741-5201 |
19871 |
Acceptance
of Material not in Conformity with Plans and Specifications |
A |
|
|
|
|
|