Date FIN# Contract Subject A/R/P
3/12/13 41881115201 E7G26 Tampa Bay Trail Underpass at Sheldon Rd - Construct Critical Temporary Wall A
1/27/12 41684225201 E7G19 SR 43 (US 301) Subcontractor Asphalt Straightedge Claim A
7/25/11 41340715201 T7189 SR 580 (Bush Blvd) - Entitlement to Compensation on Several Pay Items A
5/2/11 41133715201 T7164 SR 600/US 92 - Method of Payment for Boardwalk Support Posts A
4/16/11 42616115201 T7258 SR 597 (Dale Mabry) - Quantity of Structural Treated Timber A
1/30/09 25715415201 T7147 SR 688 (Ulmerton Road) - Installation of Drilled Shafts due to Differing Site Conditions A
         
8/24/05 25695715201 21562 SR 55 (US 19) Removal of Unsuitable Material to Install Sanitary Sewer line A
10/13/04 25695715201 21562 SR 55 (US19) Additional Sign Structure Luminaries A
12/10/03 25695715201 21562 SR 55 (US 19) Placement of Asphalt Base vs. Optional Base Groups 4 & 5 A
         
6/27/05 25873415201 20445 SR 56/ I-75 Interchange - Global Claim Issues (13 Issues) A
5/2/00 25873415201 20445 SR 56/ I-75 Interchange - Delay Due to Pile Splices A
         
5/31/05 25705015201 T7033 SR 688 (Ulmerton Road) - Payment for Fittings    DRB Clarification A
2/7/05 25866715201 T7020 SR 93A (I-75) Granite Shortage, Replace Pavement Markings, MOT Devices (3 Issues) A
12/27/04 40371315201 T7041 SR-45 (Nebraska Ave) Lane Closure Restrictions A
10/15/04 4057515201 E7A90 Bridge Painting Hillsborough/Pinellas Co. (Weather Days) R
10/11/04 25583415201 T7004 SR 674 - Granite Shortage, Extra Work S-10 & S-10a, Abnormal Weather (3 Issues) A
         
6/4/04 25633715201 21591 SR 54 - Weather Related Damage, Elevated Water Table A
6/4/04 25633715201 21591 SR 54 - Loading & Hauling Muck Materials for Ponds 3 East & 3 West A
6/4/04 25633715201 21591 SR 54 - Existing Asphalt Thickness/Loss of Use of Limerock Material A
         
5/6/04 25638715201 21491 SR 52 - Seeding & Mulching Payment A
1/7/04 25716315201 21563 SR 44 (US41 to CR 470) Additional Dewatering due to Differing Site Conditions A
         
11/21/03 25480515201 20358 SR 50 & SR 45 - Time Adjustment due to Delays from Tampa Port Security A
11/21/03 25480515201 20358 SR 50 & SR 45 - Time Extension & Adjustment for Concrete Work/Driveway Over-runs A
11/21/03 25480515201 20358 SR 50 & SR 45 - Unforeseen Work Associated w/ Pavement Failures on US 41 R
4/4/03 25480515201 20358 SR 50 & SR 45 - Subsoil Excavation Under Pipes A
10/21/02 25480515201 20358 SR 50 & SR 45 - Significant Change in Work (JPA Fittings, Water & Force Mains) A
2/29/00 25480515201 20358 SR 50 & SR 45 - Sanitary Sewer Bypass Pumping A
         
9/23/03 25709315201 21362 SR 60 (Memorial Causeway) Storm Water Run-Off A
8/27/03 40371815201 21674 SR 45 (US 41) Timely Submittal of Claims for Subgrade Testing; Non Standard Construction; Sod Overrun A
8/18/03 25573415201 21274 SR 45 (Causeway Blvd) Sanitary Sewer Revision/Relocation A
         
7/21/03 25886115201 20489 SR 93 (I-275) Replacement Cost for High Mast Lighting Conduit Conflict at Ramp D1 A
1/29/02 25886115201 20489 SR 93 (I-275) Slab Replacement/Joint Sealing A
         
3/31/03 25633815201 21198 SR 54 (from SR 55 to East of Madison St.) Plan Issue - Fiberglass Structure in Pond 1A A
4/4/02 25633815201 21198 SR 54 (from SR 55 to East of Madison St.) Modification of Incentive Completion Dates A
         
3/3/03 25709515201 20857 SR 55 (US 19) Request for Additional Time Due to Utility Conflicts A
6/6/00 25690515201 20752 SR 679 (Bunces Pass Bridge) Sheet Piling Installed at Bridge Approaches A
6/2/00 25683115201 20287 SR 586 (Curlew Road) Utility Conflict A
5/22/00 25841015201 20573 SR 93 (I-275) Joint Sealing Around Replacement Slabs  A
         
4/25/00 25846315201 19566 SR 400 (I-4) Barrier Wall Out of Tolerance A
4/25/00 25846315201 19566 Significant Change to Pile Installation A
4/25/00 25846315201 19566 SR 400 (I-4) Bridge Barrier Wall A
4/25/00 25846315201 19566 SR 400 (I-4) Poor Finish on Bridge Deck R
8/24/98 25846315201 19566 SR 400 (I-4) Jack & Bore Issues (Pay Items, Tunneling, Plan Error Delays) A
         
8/6/97 25846015201 19126 SR 400 (I-4) Untimely Notice of Intent to File Claim for Traffic Accident Repairs (Issue #12) A
7/11/97 25846015201 19126 SR 400 (I-4) Temporary Sheet Piling Placed in Baker Canal (Issue # 11) A
7/11/97 25846015201 19126 SR 400 (I-4) Partial Payment for Temporary Items (Issue # 10) A
6/11/97 25846015201 19126 SR 400 (I-4) Payment for Granular Backfill Behind MSE Wall (Issue # 9) A
4/16/97 25846015201 19126 SR 400 (I-4) Removal of Existing Median Barrier (Issue # 8) A
4/6/97 25846015201 19126 SR 400 (I-4) Typical Wall Sections Bond Breaker (Issue # 7) A
7/3/96 25846015201 19126 SR 400 (I-4) Pay Item for Alternate Base A
5/24/96 25846015201 19126 SR 400 (I-4) Payment for Smooth Outer Wall Concrete Pipe (Issue # 5) A
4/19/96 25846015201 19126 SR 400 (I-4) Maintenance of Highway/Overhead Sign Lighting A
4/19/96 25846015201 19126 SR 400 (I-4) Cost of Maintaining Guardrail A
3/6/96 25846015201 19126 SR 400 (I-4) Plan Quantities of Guardrail A
         
5/16/96 25553315201 18734 SR 600 (US 92) End Block Beam Reinforcing Steel (VECP Modified Beams) A
2/26/96 25553315201 18734 SR 600 (US 92) Delays to Statnamic Testing (Failure to Document Claim) A
1/23/96 25553315201 18734 SR 600 (US 92) Removal of Obstructions from Drilled Shafts  R
         
8/12/95 25828415201 18703 Clearwater Pass Bridge - Plans Interpretation - Conduit in Pedestrian Barrier Wall A
4/17/95 25828415201 18703 Clearwater Pass Bridge - Laitance of Drilled Shaft Concrete - Remedial Work at Pier 4 A