Date FIN# Contract Subject A/R/P
1/23/13 21327245201 T2260 SR 8 (I-10) - 3rd Party Damage to guard Rail & Friction Course R
9/10/12 21087325201 T2398 SR 30 (US 98) Aucilla River Bridge Replace - Pre-forming Pile Holes on Detour Bridge & Temporary Work Structure A
         
8/12/12 21321825201 T2359 SR 9 (I-95) - Differing Site Conditions - Remove & Replace Existing Concrete Pavement R
3/8/12 21321725201 T2359 SR 9 (I-95) - Traffic Control officer Use in Lane Closures A
         
4/4/12 21069745201 T2199 SR 200 (A1A) - Relocation of Fender System, Removal of Concrete Rubble & Condition of Bascule Foundation A
3/19/12 21294985201 T2350 SR 93 (I-75) - Existing Soil Conditions at Pond B-4 A
11/12/11 21068735201 E2N36 SR 200 (A1A) - Differing Site Condition Concerning Muck Removal & Subsurface Clay A
         
5/8/11 20778515201 E2G52 SR 329 - Traffic Control Plan; Installation of Temporary Barrier Wall A
5/2/11 20778515201 E2G52 SR 329 - Limerock Base Compaction Method A
         
1/27/11 20965015201 T2319 SR 10A (Arlington Expressway) - Installation of Fiber Optics Locate Wire A
1/27/11 42633315201 T2284 SR 111 (Edgewood Avenue) - Installation of Fiber Optics Locate Wire A
1/21/10 21311325201 T2280 SR 8 / I-10 - Traffic Control Officer Payment Issue R
         
2/22/09 21037625201 T2178 SR 55 - Removal of Concrete from Existing Manhole & Storm Sewer; Occurred During Drilled Shaft Installation A
5/11/08 21037625201 T2178 SR 55 - Excavation Required to meet Plan Template; Maintenance/Restoration of Turf on Re-Worked Shoulder A
1/7/08 21037625201 T2178 SR 55 - Contractor's Quality Control Plan Rejection A
         
11/21/08 20797325201 T2207 SR 18 & SR 235 - Cross Slope Corrections in All Curve Sections A
11/3/08 20996915201 T2097 SR 20 Widening Project, Interlachen to Hollister, Unforeseen Drainage Work A
10/16/08 20965955201 T2196 SR 23 - Sandbag Payment Quantification A
5/17/07 21324515201 T2117 SR 9/I 95 - Multiple Issues
(Adjoining Project; Type B Stabilization & Base Overruns; Failed Temp. Erosion Control)
A
11/30/06 20769915201 E2H07 SR 26 Critical End Dates A
4/13/06 20969225201 T2082 SR 134 - Contract Time Issues, Liquidated Damages A
8/1/05 21335155201 T2013 SR 9A - Pile Underruns & Bridge Deck Removal A
7/5/05 21325125201 E2G91 I-295 - Additional Compensation for Removal of Asphalt A
5/19/05 21308415201 T2061 I-75(from US90 to I-10) Weather Delay Time Extension A
10/13/04 21350215201 E2F20 I-95: Flagler Co line to S. of SR 207 -  Steel Index Pricing for Fence A
6/18/03 20960015201 21349 SR 9A & SR 9A/I-95 Interchange - City of Jacksonville Noise Ordinance A
9/25/02 20926115201 20697 SR 139 - Unresolved Claim Issues - MOT, Paving Inefficiencies, Additional Field Costs A
5/31/02 21022315201 21232 SR 13 - Reduction in Quantity of Gravity Wall A
2/27/02 20926915201 19550 SR 10 (Atlantic Ave) Claim Issue - Leaking Joints RCP A
9/26/01 20978615201 20898 SR 49/US 129 -  Additional Compensation Placement of Additional Limerock Base A
6/12/00 21343315201 20459 SR 8/ I-10 - Ellaville Weigh In Motion Station - Inspection Pit Slab A