| FLORIDA DEPARTMENT OF TRANSPORTATION --- STATE MATERIALS OFFICE | ||||
| RIDE ACCEPTANCE | ||||
| PROJECT NUMBER 97931-3300 FINANCIAL PROJECT NO. 2326101 52 01 | ||||
| FLORIDA TURNPIKE SR 91 / TURNPIKE TURNPIKE DISTRICT | ||||
| ENGLISH JOB | ||||
| LANES | NUMBER OF RATED LOTS | NUMBER OF RATED LOTS RN>=4.21 |
NUMBER OF RATED LOTS 4.10>RN >3.69 |
NUMBER OF RATED LOTS RN<=3.69 |
| NORTHBOUND TRAFFIC LANE | 28 | 27 | 0 | 0 |
| NORTHBOUND PASSING LANE | 27 | 11 | 4 | 0 |
| SOUTHBOUND TRAFFIC LANE | 26 | 17 | 2 | 0 |
| SOUTHBOUND PASSING LANE | 25 | 14 | 2 | 0 |
| TOTAL | 106 | 69 | 8 | 0 |
| SMOOTHNESS PAYMENT PER LOT | ( A ) = | $500.00 | ||
| % OF LOTS WITH RN < 4.10 | ( Pb) = | 7.55% | ||
| % OF LOTS WITH RN >= 4.21 | ( Pa) = | 65.09% | ||
| PERCENT OF BONUS LOTS (P) = Pa - 2Pb | ( P ) = | 65.09% - ( 2 * 07.55%) | 50.00% | |
| SMOOTHNESS FACTOR (B) = (P-70.0)/25.0 | ( B ) = | ( 50.00% - 70 ) / 25 | 0.00 | |
| TOTAL NUMBER OF RATED LOTS | ( C ) = | 106 | ||
| TOTAL SMOOTHNESS PAYMENT | ( A * B * C ) = | $500.00 * 0.00 * 106 | $0.00 | |
| NOTE 1: THESE EXAMPLE CALCULATIONS ARE BASED ON FDOT SPECIFICATION 330-12.7.1, AS OF 6/20/03 | ||||
| NOTE 2: SMOOTHNESS FACTOR CANNOT BE LESS THAN 0 OR GREATER THAN 1.00. | ||||
| NOTE 3: TOTAL SMOOTHNESS PAYMENT CANNOT EXCEED 3% OF CONTRACT PRICE. | ||||
| FEDERAL MILEPOST FBMP. 89.88 TO FEMP. 92.697 | ||||
| RIDE ACCEPTANCE -- 6" SAMPLING INTERVALS | ||||
| DATE TESTED 8/14/00 UNIT 5 DOT 24388 | ||||
| FRICTION COURSE FC-5 | ||||