Construction
| FLORIDA DEPARTMENT OF TRANSPORTATION --- STATE MATERIALS OFFICE | ||||
| RIDE EVALUATION | ||||
| PROJECT NUMBER 88081-3415 FINANCIAL PROJECT NO. 213178415201 | ||||
| INDIAN RIVER SR 9 / US I-95 DISTRICT 4 | ||||
| METRIC JOB | ||||
| LANES | NUMBER OF RATED LOTS | NUMBER OF RATED LOTS RN>=4.21 |
NUMBER OF RATED LOTS 4.10>RN>3.69 |
NUMBER OF RATED LOTS RN<=3.69 |
| NORTHBOUND TRAFFIC LANE | 130 | 77 | 14 | 0 |
| NORTHBOUND PASSING LANE | 149 | 61 | 32 | 1 |
| SOUTHBOUND TRAFFIC LANE | 141 | 87 | 16 | 0 |
| SOUTHBOUND PASSING LANE | 149 | 16 | 64 | 2 |
| TOTAL | 569 | 241 | 126 | 3 |
| SMOOTHNESS PAYMENT PER LOT | ( A ) = | $310.00 | ||
| % OF LOTS WITH RN < 4.10 | ( Pb) = | 22.67% | ||
| % OF LOTS WITH RN >= 4.21 | ( Pa) = | 42.36% | ||
| PERCENT OF BONUS LOTS (P) = Pa - 2Pb | ( P ) = | 42.36% - ( 2 * 22.67%) | -2.99% | |
| SMOOTHNESS FACTOR (B) = (P-70.0)/25.0 | ( B ) = | ( -2.99 - 70 ) / 25 | 0.00 | |
| TOTAL NUMBER OF RATED LOTS | ( C ) = | 569 | ||
| TOTAL SMOOTHNESS PAYMENT | ( A * B * C ) = | $310.00 * 0.00 * 569 | $0.00 | |
| NOTE 1: THESE EXAMPLE CALCULATIONS ARE BASED ON FDOT SPECIFICATION 330-12.7.1, AS OF 6/20/03 | ||||
| NOTE 2: SMOOTHNESS FACTOR CANNOT BE LESS THAN 0 OR GREATER THAN 1.00. | ||||
| NOTE 3: TOTAL SMOOTHNESS PAYMENT CANNOT EXCEED 3% OF CONTRACT PRICE. | ||||
| KILOMETERPOST BKP. 9.922 TO EKP. 25.031 | ||||
| RIDE EVALUATION -- 6" SAMPLING INTERVALS | ||||
| DATE TESTED 8/30/1999 UNIT 5 DOT 24388 | ||||
| FRICTION COURSE FC-5 | ||||