page

page

 

page  

  Main Page

  Registration Information

  Hotel/Site Information

  Agenda

  Conference Contacts

  Exhibitor Information



 

Session Schedule Tuesday August 1 - Registration open 7:00am- 5:30pm

PDH Information: FICE will contact all attendees via email with instructions on how to retrieve your PDH certificates.
 
8:00am-9:30am  
Session 5 Pavement Type Selection
(1.5 PDH Credits)
 
  Uwaibi, Manny On-Line Pavement Selection Training  
Craig, Mike Urban Intersection Reconstruction to Concrete Pavement
Session 6 Disputes Review Board Root Causes/Plans Issues
(1.5 PDH Credits)
 
  Ellis, Ralph Disputes Review Board  - Project Disputes  
Birchall, Rusty
Nelson, Jeff
Pittman, Scott
Contractors Point of View on Plans Issues
Session 7 Unique Highway Design
(1.5 PDH Credits)
 
  Coll, Claudia Updated Nebraska Avenue (US 41)  
  Varga, Luis Updated Okeechobee Road Depressed Section  
  Lamb, Matt &
Melvin, Mike
Updated I-10/I-110 Interchange  
Session 8 Coastal Engineering for Bridges
(1.5 PDH Credits)
 
  Sheppard, Max Updated Wave Forces on Bridges  
Sheppard, Max &
Dompe, Phil
Screening Existing Bridges for Vulnerability to Wave Attack
Session 9/10 Structures General Session /
Construction Projects & Cost Topics
 (1.5 PDH Credits)
 
  Andres, Tom &
Scales, Amy &
Ralls, Mary Lou
Graves Avenue Bridge over I-4: How-To Manual  
Andres, Tom Designing for Variability
Finley, Craig Construction Equipment and Cost
Session 11 Mapping Products
(1.5 PDH Credits)
 
  Richards, Travis &
Burtoft
County General Highway Maps: Where We've Been, Where We Are, Where We're Going  
DeGafferelly, Theresa Evolution of Land Title Reporting (E-Title)
Session 12 Scheduling Assessment  & Consultant Evaluation
(1.5 PDH Credits)
 
  Reis, Lou &
Doherty, Cheryl
Scheduling Assessment Process  
Lieblong, Kurt Consultant Evaluation
9:30am-10:00am  
Break  
   
10:00am-11:30am  
Session 13 Estimates General Session
(1.5 PDH Credits)
 
  Davis, Greg Cost Estimate Study Findings  
Stanley, Dale Long Range Estimates (LRE) System Enhancements
Herring, Paul Updated Trns*Port/Web Interface
Hollis, Melissa Basis of Estimates Proposed Changes
(C-Team Update)
Session 14 Integrating ETDM into Project Development
(1.5 PDH Credits)
 
  Crim, Bob
Young, Richard
Whately, Lynn Marie
Pipkin, Gwen,
Moss, Kevin
Integrating ETDM into Project Development  
Session 15 Highway Design for Safety
(1.5 PDH Credits)
 
  Keel, Andy Cable Barrier Use on the FDOT System  
Mills, Jim Median Crossovers, Policy & Design
Bane, Tom Design Exceptions & Variations: Good and Not So Good
Session 16 Extreme Event Analysis
(1.5 PDH Credits)
 
  Bacopoulos, Peter & Slinn, Don Updated ADCIRC Hurricane Forecasting Model  
Slinn, Don &
Salisbury, Mike
Updated Improved Storm Surge Analysis
Session 17 Concrete Durability, Service & Wind Load Design
(1.5 PDH Credits)  (repeated in 39)
 
  Pielstick Brett Updated Improved Durability of Post-Tensioned Bridges  
Bollmann, Henry Effect of using new PS loss equations and transformed section properties on the design of PS Beams for the Service 3 check
Pouliotte, Jeff Beam Stability during Erection
Bolting Criteria  & Specs 649 & 700
Concrete Crack Repair for Spec 400
White, Dongming Adoption of 2001 AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals
Session 18 I-10 Escambia Bay: Structural TSPs, Specifications, Standards, & Details
(1.5 PDH Credits)
 
  Maxey, Dan I-10 Escambia Bay Bridge Project  
Brautigam, Duane Technical Specifications & Developmental Specifications
Boyd, Charles New Plastic Fenders System: Philosophy/Design Approach
Session 19 Producing Traffic Plans with the FDOT2004 CADD Software
(1.5 PDH Credits)
 
  Barwick, Esther Producing Traffic Plans with the FDOT2004 CADD Software  
Session 20 Bridges and Coastal Roadway Protection
(1.5 PDH Credits)
 
  Garcia, Jose The Skyway Bridge - Yesterday, Today & Tomorrow  
Kerr, Richard Structurally Deficient & Functionally Obsolete Bridges
Ducher, Jean Operational Implementation of LRFR
Baxley, Charles US98 Sheetpile/Gabion Basket Armoring Project
11:30am-1:00pm  
Lunch    
     
1:00pm-2:45pm  
Session 21 Scour & Drainage Update
(1.75 PDH Credits)
 
  Sheppard Max &
Glasser, Tom
Updated Improved Complex Pier Scour Prediction Procedure  
Gosselin, Mark &
Glasser, Tom
Coastal Contraction Scour Study of Jensen Beach Blvd. Bridge
Renna, Rick Updated Central Office Drainage Projects & Future Directions
Session 22 Specifications News & Views
(1.75 PDH Credits)
 
  Thomas, Frances Spec Package Preparation on the Web; the Next Generation  
Burleson, Bob Those Who Show Up Help Make the Decisions
Dean, Jerry &
Dickens, Bessie &
Brock, Tim &
Doughery, Marshall &
Scott, Eddy &
Kane, Dee
A Visit to the Department of Transportation
Session 23 Noisewalls, Bridge Widenings, Barriers, & Railings
(1.75 PDH Credits)
 
  Nickas, William Widenings & Railings : Philosophy/White Paper  
Boyd, Charles Attachments to Traffic Railings
Alberson, Dean Research findings for LRFD Deck Design
Andres, Tom Noisewalls – Struct. / QPL (Complement Rds.)
Session 24 Specs & Standards for ITS & TMC, Hurricane Issues
 
(1.75 PDH Credits)
 
  Wilson, Mark
Henson, Chester
Updated Design Signal for Hurricane Wind - Lessons Learned & New Design  
Meyer, Ron
Glotzbach, Gene
Development of specifications and Design Standards for Intelligent Transportation System (ITS) field devices and Transportation Management Center (TMC) equipment.
Session 25 Structural Specifications, Standards, & Details 
(1.75 PDH Credits) (continued from Session 18)
 
  Harvey, Charlie Programs & Standards: Spread Footings ; Signs / Mast / Cantilevers  
Powers, Rod & DeFreese, Michael Polymer Coated Stay-In-Place Metal Bridge Deck Forms
Nolan, Steve LRFD Box Culverts
Bollmann, Henry Standards for Temporary Bridges
Session 26 Project Management Training & Tracking Tools
(1.75 PDH Credits)
 
  Santos, Joe Project Management Handbook & Training  
Murphy, Shawn Errors & Omissions Tracking
Session 27 Project Utility Coordination
(1.75 PDH Credits)
 
  Childs, Walter The Importance of Qualified Utility Coordinators  
LaVallette, Vinnie Successful Utility Coordination Case Study
Session 28 Aerial Photography at FDOT
(1.75 PDH Credits)
 
  Harris, Theodore Digital Aerial Photography: Enhancing your projects  
Korte, Stuart Updated Aerial Photography in FDOT
2:45pm-3:15pm  
Break  
   
3:15pm-5:00pm  
Session 29 Coastal Engineering Analyses
(1.75 PDH Credits)
 
  Newman, Mark Updated Groundwater Table Prediction for Tidal & Inland Conditions  
Sheppard, Max &
Gosselin, Mark
Coastal Analyses of Bridge Failures: I-10 in Florida and US-90 in Mississippi
Session 30 R/W Design Coordination: The Good, the Bad, & the Ugly
(1.75 PDH Credits)
 
  Towcimak, Ken
Doyle, Rich
Jordan, Joe
Pitman, Jimmy
Lovett, George
Brennan, Annette
Updated Panel Members  
Session 31 District Estimates Issues
(1.75 PDH Credits)
 
  Davis, Greg District Specific Topics for Project Designers & Managers  
Walls, Steve District 1 Estimates Process
Rountree, Richard District 2 Calculating Earthwork Unit Cost in LRE
Justice, Shawn &
Johns, Tommy
District 3 Project Scoping & Estimates Process
Lipscomb, Gene Updated District 4 Estimates Process
Session 32 Certification of Signals & ITS devices, Hurricane Issues
(1.75 PDH Credits)
 
  Hsia, Liang &
Morgan, Jeffrey
Certification Program for Signal & Intelligent Transportation Systems (ITS) Devices  
Akridge, Michael &
Clark, Paul
Design for Freeway Contraflow and Hurricane Recovery
Session 33 LRFR Methodology
 
(1.75 PDH Credits)
 
  Mertz, Dennis LRFR Methodology  
Session 34 FDOT Roadway Plans Preparation/CADD Training
(1.75 PDH Credits)
 
  McGaffick, Shawn FDOT Roadway Plans Preparation
(no presentation, live demonstration)
 
Session 35 Designing for Transit
(1.75 PDH Credits)
 
  Padron, Isabel South Dade Busway Design  
Stults, Jennifer Lymmo & Other Major Tansit Projects in Orlando
Teeple, Suraya Jacksonville Rapid Transit System Update
Datz, Amy PPM & Greenbook Revisions for Transit Design
Session 36 Structural Research Projects 
(1.75 PDH Credits) 
 
  Cook, Ron Prevention of Splitting Failure at Ends of Pre-stressed Beams During Fabrication  
Hamilton, Trey St. George Island Pile Testing
Cook, Ron Field Verifications of Camber Estimates for Prestressed Concrete Bridge Girders
Hamilton, Trey Crack Control in Toppings for Precast Flat Slab Bridge Deck Construction
     
  <<View Day 1 Schedule         View Day 3 Schedule>>